Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
11/24/2021
|
11/17/2021
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
No Comments
|
11/24/2021
|
11/17/2021
|
|
Hector Soto Jr.
|
|
|
Traffic Review
|
No Comments
|
11/24/2021
|
11/17/2021
|
|
Hector Soto Jr.
|
|
|
Building Codes Review
|
Approved with Conditions
|
11/24/2021
|
11/17/2021
|
|
Hector Soto Jr.
|
|
Miscellaneous Correction
Corrective Action Required
Building/electrical permit will not required.
|
|
|
Fire Review
|
Approved with Conditions
|
11/24/2021
|
11/17/2021
|
|
Hector Soto Jr.
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Planning Review
|
Corrections
|
10/13/2021
|
10/13/2021
|
|
Hector Soto Jr.
|
|
Corrective Action Required
INSPECTION REPORT RESULTS. Staff has reviewed the Review of Tower Inspection and Summary of Remediation. Please provide documentation of the completion of the two remaining outstanding items (i.e. tower base grounding) called out in the document. Once documentation of the issues being abated, staff will issue approval of the subject final development plan application.
|
|
|
Building Codes Review
|
Approved with Conditions
|
10/13/2021
|
10/06/2021
|
|
Scott Ready
|
|
Miscellaneous Correction
Corrective Action Required
Building/electrical permit will not required.
|
|
|
Traffic Review
|
No Comments
|
10/13/2021
|
10/06/2021
|
|
Scott Ready
|
|
|
Fire Review
|
Approved with Conditions
|
10/13/2021
|
10/06/2021
|
|
Scott Ready
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Engineering Review
|
No Comments
|
10/13/2021
|
10/06/2021
|
|
Scott Ready
|
|
|
Planning Review
|
Corrections
|
09/24/2021
|
09/21/2021
|
|
Hector Soto Jr.
|
|
Corrective Action Required
INSPECTION REPORT RESULTS. The ATC Tower Inspection Form revealed a number of maintenance/repair items that needs to be addressed.
Provide an action plan and timetable to address the identified maintenance/repair items. Documentation shall be provided indicating that the outstanding items have been properly addressed prior to approval of the final development plan for the co-locate.
|
|
|
Fire Review
|
Approved with Conditions
|
09/24/2021
|
09/17/2021
|
|
Scott Ready
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Building Codes Review
|
Approved with Conditions
|
09/24/2021
|
09/17/2021
|
|
Scott Ready
|
|
Miscellaneous Correction
Corrective Action Required
Building/electrical permit will not required.
|
|
|
Traffic Review
|
No Comments
|
09/24/2021
|
09/17/2021
|
|
Scott Ready
|
|
|
Engineering Review
|
No Comments
|
09/24/2021
|
09/17/2021
|
|
Scott Ready
|
|
|
Planning Review
|
Corrections
|
09/09/2021
|
09/10/2021
|
|
Hector Soto Jr.
|
|
Corrective Action Required
PROOF OF INSURANCE. Provide proof of general liability insurance for claims from injury or death and property damage in an amount approved by the City, but not less than $2,000,000.00 per occurrence for personal injury and $2,000,000.00 per occurrence for property damage with the City listed and endorsed as an additional insured. The policy shall also include an endorsed waiver of subrogation against the City.
|
|
Corrective Action Required
INSPECTION REPORT. Provide a copy of an inspection report assessing the physical state of the tower. The report shall be current within the last three years.
|
|
|
Traffic Review
|
No Comments
|
09/09/2021
|
09/07/2021
|
|
Brad Cooley, P.E., RSPI
|
|
|
Engineering Review
|
No Comments
|
09/09/2021
|
09/06/2021
|
|
Loic Nguinguiri, E.I.
|
|
|
Building Codes Review
|
Approved with Conditions
|
09/09/2021
|
09/03/2021
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Building/electrical permit will not required.
|
|
|
Fire Review
|
Approved with Conditions
|
09/09/2021
|
08/25/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|