Planning Application Status

PL2021238




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021238
Village at New Longview Townhomes - Public Street Plans
Engineering Plan Review
Engineering Plan Review
Approved
06/28/2021
YARCO-DEVCO LLC
Locations
Contacts
YARCO-DEVCO LLC, Address:7920 WARD PARKWAY  
Scott Ready, Phone: 8169691225  
RUSSELL PEARSON, Address:3152 GRANDSTAND CIR, Phone:(913) 735-9861  
O'REILLY BUILD LLC, Address:5051 S NATIONAL AVE STE 4-110, Phone:(417) 862-9500  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 04/01/2025 04/01/2025
Sue Pyles, P.E.
Engineering Review No Comments 10/29/2021 10/21/2021
Sue Pyles, P.E.
Traffic Review No Comments 10/29/2021 10/21/2021
Sue Pyles, P.E.
Engineering Review Corrections 08/12/2021 08/11/2021
Sue Pyles, P.E.
Corrective Action Required
08/11/2021

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
08/11/2021

As previously requested, please replace General Note 10 with the following: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
Corrective Action Required
08/11/2021

ADA-Ramps: • Detail 1 (S): Please review the slopes shown at the right and top edges of the “L” section, they appear to be in error. • Detail 3 (W): Please replace the ??? with slopes. • Detail 3 (W & E): Please review the slopes in the “L” sections. It appears that the diagonal slopes exceed the 1.5% maximum. Revise as needed. • Detail 4 (S): Please review the slopes in the “L” sections It appears that the diagonal slopes exceed the 1.5% maximum allowed. Revise as needed. • Detail 4 (N): The cross-slopes in the “L” section exceed the 1.5% maximum allowed. Please revise. • Detail 5 (W & E): Please review the slopes in the “L” sections. It appears that the diagonal slopes exceed the 1.5% maximum. Revise as needed.
Traffic Review No Comments 08/12/2021 08/10/2021
Brad Cooley, P.E., RSPI
Engineering Review Corrections 07/07/2021 07/07/2021
Sue Pyles, P.E.
Corrective Action Required
07/07/2021

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
07/07/2021

Sheet C401: • Please revise General Note 9 to reference the City’s Design and Construction Manual rather than the Public Works Department. • Please replace General Note 10 with the previously provided construction inspection notification note.
Corrective Action Required
07/07/2021

Sheets C404-C408: • Please revise all ADA-accessible ramp and sidewalk designs to meet maximum design slope requirements (1.50% cross-slope, 7.50% running slope, 1.50% slope all directions for a turning space). • Even though the proposed streets within the New Longview Townhome development are private, they will function like public streets. It is recommended that detectable warnings be used at both private and public roadway crossings.
Traffic Review No Comments 07/07/2021 07/01/2021
Brad Cooley, P.E., RSPI
Informational
07/01/2021

Stop signs shall be relocated in front of sidewalk at crossing (Longview and Curry) a minimum of 4 feet.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: