Summary
PL2021145
Ground Roots - Chapel Ridge Business Park - Out Building
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Expired
04/23/2021
VAAP CHAPEL RIDGE LLC
Locations
Contacts
VAAP CHAPEL RIDGE LLC, Address:5007 W 147TH ST  
THE GAMBLE COMPANY, LLC, Address:3500 S MIZE RIDGE CT, Phone:(816) 809-8748  
VAAP CHAPEL RIDGE LLC, Address:5007 W 147TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 06/07/2021 06/07/2021
Hector Soto Jr.
Corrective Action Required
06/07/2021

PARKING LOT CIRCULATION. The following comment is provided for your information and requires no action at this time: - Should this preliminary development plan application be approved by City Council, additional detailed information regarding pavement markings and traffic signage (e.g. "one-way", "do not enter") managing the one-way traffic circulation around the new building shall be required to be provided as part of the final development plan submittal.
Corrective Action Required
06/07/2021

LIGHTING. - All exterior lighting shall comply with the applicable lighting standards found under UDO Section 8.220, 8.250, 8.260, 8.270 and 8.280. Cut sheets of all proposed exterior light fixtures shall be provided for review. No cut-sheet was submitted for the "up/down light fixture" called out on the building elevations. - A photometric plan shall be submitted in accordance with the requirements of UDO Section 8.230. No photometric plan was submitted as part of the resubmittal. - Cut-sheets of proposed light fixtures and a photometric plan shall be provided at the time of final development plan application submittal.
Engineering Review Approved with Conditions 06/01/2021 06/01/2021
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
06/01/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
06/01/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
06/01/2021

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
Planning Review Corrections 06/01/2021 05/31/2021
Hector Soto Jr.
Corrective Action Required
05/31/2021

SITE DATA TABLE. Revise the table to address the following: - List the lot area in sq. ft. (The lot area is 182,138 sq. ft. per the plat.) - Existing and proposed floor area ratio (FAR). (There is an error in your FAR calculation. With a total building area of 34,246 sq. ft. and the lot area as cited above, the total proposed FAR is 0.19 [or 1.9%], not 3.2% as you note on the plans.)
Corrective Action Required
05/31/2021

ADA PARKING SPACES. Remove the wheel stop at the head of the proposed ADA parking space. City ordinance does not allow the use of wheel stops, except for specific instances that are not present at this site. Protection for the pole on which the ADA parking sign is mounted can be provided by setting the pole mounted sign in a bollard at the head of the space.
Corrective Action Required
05/31/2021

PARKING LOT CIRCULATION. The following comment is provided for your information and requires no action at this time: - Should this preliminary development plan application be approved by City Council, additional detailed information regarding pavement markings and traffic signage (e.g. "one-way", "do not enter") managing the one-way traffic circulation around the new building shall be required to be provided as part of the final development plan submittal.
Corrective Action Required
05/31/2021

LIGHTING. - All exterior lighting shall comply with the applicable lighting standards found under UDO Section 8.220, 8.250, 8.260, 8.270 and 8.280. Cut sheets of all proposed exterior light fixtures shall be provided for review. No cut-sheet was submitted for the "up/down light fixture" called out on the building elevations. - A photometric plan shall be submitted in accordance with the requirements of UDO Section 8.230. No photometric plan was submitted as part of the resubmittal.
Corrective Action Required
05/31/2021

MISCELLANEOUS. - The property address is incorrectly labeled as 368 NE Akin Dr. under the legal description on Sheet A1 and on the title block of each plan sheet. The correct address is 3680 NE Akin Dr. - The lot number is incorrectly labeled as Lot 15 under the legal description on Sheet A1 and next to the FAR % listed under the Site Data Table on Sheet A1. The correct lot number is Lot 17.
Traffic Review No Comments 06/01/2021 05/24/2021
Michael Park
Fire Review Approved with Conditions 06/01/2021 05/21/2021
Jim Eden
Code Statement
Informational
05/21/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Review Approved with Conditions 05/07/2021 05/10/2021
Mike Weisenborn
Code Statement
Corrective Action Required
05/10/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Planning Review Corrections 05/07/2021 05/07/2021
Hector Soto Jr.
Corrective Action Required
05/31/2021

SITE DATA TABLE. Provide a table that lists the following site information: - Lot area (sq. ft.) - Existing building area (in-line retail bldg) - Proposed building area (out-building) - Total building area - Existing and proposed floor area ratio (FAR) - Existing and proposed impervious site coverage (in sq. ft.) - Existing and proposed total number of parking spaces (Note the number of ADA and non-ADA spaces.) - Required number of parking spaces for existing building area (FYI: 166 spaces based on a retail center calculation of 5 spaces per 1,000 sq. ft. for the existing 33,150 sq. ft. building. Also, break out the number of required ADA spaces and non-ADA spaces.) - Required number of parking spaces for the proposed total building area (166 + 14 spaces per 1,000 gross sq. ft. of the new out-building. Also, break out the number of required ADA spaces and non-ADA spaces.)
Corrective Action Required
05/07/2021

DRIVE-THROUGH. - City ordinance requires a minimum 4 vehicle stacking from the pick-up window plus 4 vehicle stacking from the menu board. The proposed layout only has 3 vehicle stacking from the pick-up window. - As a matter of good planning practice, staff does not support required parking spaces being blocked in by the minimum queueing requirement for the drive-through.
Corrective Action Required
05/07/2021

ADA PARKING SPACES. No designation of any ADA parking spaces is shown near the proposed new building. The nearest ADA parking space on the existing site is approximately 100'. An accessible path needs to be provided between the ADA parking spaces and the proposed ADA ramps accessing the new building. Show the location of the ADA spaces and access aisles.
Corrective Action Required
05/07/2021

PARKING LOT. - Label the type of new curbing used to border the proposed development. The curbing shall be CG-1 (straight-back). - The circulation for the drive aisle adjacent to the new building needs to be made one-way so as not to create a conflict between drive-through and on-coming traffic.
Corrective Action Required
05/07/2021

BUILDING ELEVATIONS. - Elevations for all four sides of the building shall be provided. - Horizontal and vertical elements shall be incorporated on all sides of the building to provide architectural relief for each of the wall planes. In particular, the two long sides require some type of horizontal and verticular feature (e.g. pilaster, canopy, etc.) to break up the long flat walls. - Show the location of all RTUs on the elevations using dashed lines to ensure that the building parapets of a sufficient height to full screen the RTUs from view. Ground-mounted mechanical equipment shall be shown on the site plan and shall be fully screened from view using masonry walls or evergreen landscaping.
Corrective Action Required
05/07/2021

LIGHTING. - All exterior lighting shall comply with the applicable lighting standards found under UDO Section 8.220, 8.250, 8.260, 8.270 and 8.280. Cut sheets of all proposed exterior light fixtures shall be provided for review. No cut-sheet was submitted for the "up/down light fixture" called out on the building elevations. - A photometric plan shall be submitted in accordance with the requirements of UDO Section 8.230. No photometric plan was submitted as part of the resubmittal.
Engineering Review Corrections 05/07/2021 05/07/2021
Sue Pyles, P.E.
Corrective Action Required
05/07/2021

Please label street names.
Corrective Action Required
05/07/2021

Please label the type of curb.
Corrective Action Required
05/07/2021

Is there any proposed grading? Please clarify.
Corrective Action Required
05/07/2021

What does “Curb Box” represent?
Corrective Action Required
05/07/2021

How is the grate inlet proposed to be blocked?
Corrective Action Required
05/07/2021

Show and label the existing storm sewer structure at the NE corner of the parking lot. Is it being removed? The existing drainage is directed into the storm sewer system. This should not be changed by allowing it to flow into traffic through a proposed flume.
Traffic Review Corrections 05/07/2021 05/06/2021
Michael Park
Corrective Action Required
05/06/2021

The proposed use (described in the narrative) and size of building exceeds the code threshold of trip generation for traffic impact study. The applicant had proposed/discussed a 700 s.f. building at the pre-application meeting; which did not require a traffic impact study. Any building of this use over 1100 s.f. will require a traffic impact study as part of the application to comply with code requirements. Either reduce the building area accordingly or submit a traffic impact study by a qualified traffic engineer.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Preliminary Development Plan fee $1,800.00 $1,800.00 Paid 04/23/2021
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 04/23/2021
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 04/23/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 06/24/2021 05:00 PM Council Chambers 06/24/2021 05:00 PM
Public Hearing Review
Approved
06/24/2021
City Council Public Hearing 07/20/2021 06:00 PM Council Chambers 07/20/2021 06:15 PM
Public Hearing Review
Approved
07/20/2021
City Council Ordinance 2nd Reading 08/03/2021 06:00 PM Council Chambers 08/03/2021 06:00 PM
Public Hearing Review
Approved
Documents & Images
Date Uploaded File Type Document Name
04/23/2021 Application Form APPLICATION-042221
04/23/2021 Application Form AFFIDAVIT-042321
04/23/2021 Plans CHAPEL RIDGE PLANS SEALED-042321
04/23/2021 Plans NARRATIVE-042321
04/23/2021 Plans PARKING-STUDY-042321
04/23/2021 Receipt Receipt for transaction: 2021-002194
05/07/2021 Letter Applicant Letter - Dev. Apps (DRCP)
05/21/2021 Plans CHAPEL RIDGE SEALED-052121
05/21/2021 Letter RESUBMISSION REPORT-052121
06/01/2021 Letter Applicant Letter - Dev. Apps (DRCP)
06/01/2021 Public Notice Document Chapel Ridge Business Park - Out Building - Mailing List
06/04/2021 Public Notice Document CHAPEL RIDGE AFFIDAVIT-060321
06/04/2021 Letter CHAPEL RIDGE NARRATIVE-060321
06/04/2021 Plans CHAPEL RIDGE OUTBUILDING-060321
06/04/2021 Public Notice Document Posting Photo
06/14/2021 Public Notice Document LEGAL PL2021-145 PDP
06/15/2021 Public Notice Document Affidavit of Publication
06/17/2021 Letter Chapel Ridge Center tenants and hours
06/17/2021 Drawing Location Map
06/21/2021 Engineer Report/Study PL2021145 Chapel Ridge Outbuilding TIA
06/21/2021 Letter Staff Report
07/22/2021 Public Notice Document LEGAL PL2021-145 PDP
07/22/2021 Public Notice Document DOC072221-004
08/16/2021 Ordinance Executed Ordinance 9202
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home