Summary
PL2021087
Hook Farms Subdivision Amenities
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/08/2021
HUNT MIDWEST REAL ESTATE DEV INC
Subdivision amenities and monument sign.
Locations
Contacts
HUNT MIDWEST REAL ESTATE DEV INC, Address:8300 UNDERGROUND DR STE 200  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
HUNT MIDWEST REAL EST DEV INC, Address:8300 NE UNDERGROUND DR  
Julie Sellers, Address:Olsson Associates, Phone:(816) 361-1177  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 10/12/2021 10/08/2021
Loic Nguinguiri, E.I.
DE Engineers Estimate
Corrective Action Required
10/08/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $19,063.64
DE Future Repair Work
Corrective Action Required
10/08/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #11 Pavement Thickness
Corrective Action Required
10/08/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
10/08/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
Corrective Action Required
10/08/2021

Stamp and sign the set of plans, submitted on 10/01/2021.
Building Codes Review No Comments 10/12/2021 10/05/2021
Mike Weisenborn
Traffic Review No Comments 10/12/2021 10/05/2021
Mike Weisenborn
Fire Review Approved with Conditions 10/12/2021 10/05/2021
Mike Weisenborn
Code Statement
Informational
10/12/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Planning Review No Comments 10/12/2021 10/05/2021
Mike Weisenborn
Engineering Review Corrections 09/24/2021 09/23/2021
Loic Nguinguiri, E.I.
Corrective Action Required
09/23/2021

Include a general note stating that all construction shall follow City of Lee’s Summit’s Design and Construction manual.
Corrective Action Required
09/23/2021

Label/indicate the location of the existing 16” water main running parallel to the eastern property line on sheet C04.
Corrective Action Required
09/23/2021

Is the walking trail traveling north-south, as shown on sheet C05, intended to be made of asphalt or concrete? If asphalt, then no revision is needed, make sure to provide a cross-sectional pavement detail of the asphalt walking trail. If concrete, revise the hatching and leader number accordingly.
Corrective Action Required
09/23/2021

On sheet C09A, label/include MH 1-4 and NS 1-1 information in profile view, as well.
Corrective Action Required
09/23/2021

On sheet C09C, label/include profile view information (i.e. NS 1-4, bend with cleanout) in plan view, as well, like previously done on sheet C09B.
Corrective Action Required
09/23/2021

The City requires a 6”-thick minimum layer of granular bedding (aggregate fill) under utility pipe. Revise the trenching and backfill (bedding) construction detail accordingly.
Planning Review No Comments 09/24/2021 09/21/2021
Shannon McGuire
Fire Review Approved with Conditions 09/24/2021 09/20/2021
Jim Eden
Code Statement
Informational
09/17/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review No Comments 09/24/2021 09/17/2021
Mike Weisenborn
Traffic Review No Comments 09/24/2021 09/17/2021
Mike Weisenborn
Planning Review Corrections 06/18/2021 06/16/2021
Shannon McGuire
Corrective Action Required
06/16/2021

Deciduous trees shall be a minimum of three-inch caliper, measured at a point 6 inches above the ground or top of the root ball, at planting. Evergreen trees shall be a minimum height of eight feet at planting. Please update the plan sheets to meet this UDO requirement.
Corrective Action Required
06/16/2021

Light fixtures on properties within residential districts shall not exceed 15’. Please update the plan sheets to meet this UDO requirement.
Engineering Review Corrections 06/18/2021 06/15/2021
Loic Nguinguiri, E.I.
Corrective Action Required
06/15/2021

The trail that connects Wheatfield court to the proposed private sidewalk was previously shown as proposed, but appears to be shown as existing on the most recent site plan sheet. Revise/clarify as applicable.
Corrective Action Required
06/15/2021

Inflow elevation at Drain Basin 1-3, from the western direction, must be at least 0.5’ higher than the outflow elevation at the storm structure. Revise accordingly on the two (2) storm sewer profile views.
Corrective Action Required
06/15/2021

W1 leader appears to be pointing at the wrong location on the utility plan view. Relocate to the right location.
Corrective Action Required
06/15/2021

Revise < 8”X2” TEE > to < 2” TAP CONNECTION >, on the utility plan view. (Connections 2" and smaller are performed by a corporation valve installed in the main by the Water Department.)
Corrective Action Required
06/15/2021

J-hooks along the eastern silt fence barrier must face uphill in order to trap sediments during heavy rain events. Revise accordingly on the ESC plan sheet.
Corrective Action Required
06/15/2021

Regarding landscape, staff recommends maintaining a 5 -7 feet minimum horizontal separation between the edge of overstory tree and the edge of storm line in order to prevent tree roots from growing into the utility pipe.
Corrective Action Required
06/15/2021

Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet, for the civil site work expected to occur on-site.
Fire Review Approved with Conditions 06/18/2021 06/11/2021
Jim Eden
Code Statement
Informational
06/11/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review No Comments 06/18/2021 06/11/2021
Joe Frogge
Miscellaneous Correction
Resolved
06/11/2021

Site lighting design is incomplete. Action required: Provide complete lighting design including all circuitry and light pole bases. (light pole base shown is not sufficient) 6/11/21 - deferred to building permit submittals
Miscellaneous Correction
Resolved
06/11/2021

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (new building has pitched roof that will not allow roof mounted and parapet protected hvac so the assumption is their will be ground mounted condensing units) 6/11/21 - per Olsson - pool equipment will be interior & there is no A/C for building.
Traffic Review No Comments 06/18/2021 06/11/2021
Mike Weisenborn
Planning Review Corrections 03/22/2021 03/22/2021
Mike Weisenborn
Corrective Action Required
03/19/2021

Please add a north arrow to the vicinity map on sheet C01.
Corrective Action Required
03/19/2021

Please label the parking lot set back from the ROW along SW 26th Ter. as well as the setbacks from the residential lots 43 & 44.
Corrective Action Required
03/19/2021

Please show the location of all oil and/or gas wells within the subject property. If none are present please cite the source of your information.
Corrective Action Required
03/19/2021

The photometric diagram needs to indicate the foot candle levels at the property lines.
Corrective Action Required
03/19/2021

All light fixtures on properties within or adjoining residential uses and/or districts shall not exceed 15 feet in height within the perimeter area. For purpose of this standard, the perimeter area shall be measured 100 feet from the property line closest to the residential use and/or district. Outside the perimeter area, the overall height may be increased to 20 feet, measured to the top of the fixture from grade. Sheet E01 shows the pole height as 22’. Please update the proposed lighting to meet UDO requirements. Please update the photometric diagram as needed.
Corrective Action Required
03/19/2021

Will there be any ground mounted mechanical equipment? If there will be please show the location, size, and type of material to be used in all screening of ground mounted mechanical equipment. Additionally, please provide the manufacturer’s specification sheets for proposed mechanical equipment to be used.
Corrective Action Required
03/19/2021

The elevations of all sides of proposed buildings shall include notation indicating building materials to be used on exteriors and roofs.
Corrective Action Required
03/19/2021

Please label the width of the required sidewalk along SW 26th Ter.
Corrective Action Required
03/19/2021

A review of the proposed landscaping was not able to be completed as the provided landscaping plan (sheet L2) depicts the area of the subdivision entrance at the intersection off Hook Rd. Please provide a landscaping plan the shows the subject site.
Corrective Action Required
03/19/2021

Parking stalls shall be 9’ wide x 19’ deep. A 9’ wide x 17’ deep parking spaces shall be permitted when the parking space abuts a 6’ wide sidewalk or when abutting a curbed open green/landscaped space. Please provide a 6’ sidewalk parallel to the northern parking stall to meets this requirement.
Corrective Action Required
03/19/2021

All signs must comply with the sign requirements as outlined in the sign section of the ordinance and will be reviewed/permitted by separate application.
Engineering Review Corrections 03/22/2021 03/22/2021
Loic Nguinguiri, E.I.
Corrective Action Required
03/22/2021

Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
Corrective Action Required
03/22/2021

Please provide, or make sure to upload, a SWPPP report and Missouri DNR permit.
Corrective Action Required
03/22/2021

Please include a note stating that “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with an inspector prior to any land disturbance work at (816) 969-1200”.
Corrective Action Required
03/22/2021

Is the construction of western sidewalk extension, as shown on sheet C04, supposed to match the standard duty asphalt pavement section instead of concrete sidewalk? If so, please clarify or revise.
Corrective Action Required
03/22/2021

Please add construction note(s) for leader number 13 and 14, on sheet C04.
Corrective Action Required
03/22/2021

Please revise (general) note 3 on sheet C07 to state “shall not have a design slope greater than 1.5%.”
Corrective Action Required
03/22/2021

Please make sure to include a final ESC restoration plan. Also, there is no need to extend the silt fence barrier all the way to the west for this project. Please revise the linear footage as necessary.
Corrective Action Required
03/22/2021

As shown in ESC-03, J-hooks are required within the ESC plan. Given the silt fence 100’ maximum runs for J-hooks, please locate the needed J-hooks on the ESC sheet.
Corrective Action Required
03/22/2021

Please provide ESC inlet protection to drain basin 1-3, as well.
Corrective Action Required
03/22/2021

The City of Lee’s Summit now requires 12 inches of aggregate over the top of pipe rather than 6 inches. Please revise applicable standard detail.
Corrective Action Required
03/22/2021

Please include the proposed 2” tap connection size within the construction note for leader W4 on sheet C08D.
Corrective Action Required
03/22/2021

Please show/label the hydraulic grade line on to the storm sewer profile views.
Corrective Action Required
03/22/2021

Please set a 0.2’ minimum elevation drop within the sanitary structures if the angle between the incoming and outgoing pipe is less than 45 degree. If the angle is equal or above 45 degree, please set a 0.5’ minimum elevation drop.
Fire Review Approved with Conditions 03/22/2021 03/18/2021
Jim Eden
Code Statement
Corrective Action Required
03/22/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review Corrections 03/22/2021 03/18/2021
Joe Frogge
Corrective Action Required
03/18/2021

Site lighting design is incomplete. Action required: Provide complete lighting design including all circuitry and light pole bases. (light pole base shown is not sufficient)
Corrective Action Required
03/18/2021

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (new building has pitched roof that will not allow roof mounted and parapet protected hvac so the assumption is their will be ground mounted condensing units)
Traffic Review No Comments 03/22/2021 03/15/2021
Michael Park
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 06/22/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
03/08/2021 Application Form HookFarms.Final Development PlanApplication
03/22/2021 Letter Applicant Letter - FDP (DFDP)
06/10/2021 Letter 21-03-24_GNCV_Comment Response Letter
06/15/2020 Activity Document Hook DNR Permit
06/16/2021 Letter Applicant Letter - FDP (DFDP)
06/22/2021 Receipt Receipt for transaction:2021-004814
09/17/2021 Letter 2021_09_08_Hook_Farms_Pool_Comment Response Letter
09/17/2021 Engineers Estimate 2021_09_08_Hook_Farms_Pool_Cost_Estimate_Rev2
09/26/2021 Letter Applicant Letter - FDP (DFDP)
10/04/2021 Letter 2021_10_01_Hook_Farms_Pool_Comment Response Letter
10/04/2021 Engineers Estimate 2021_10_01_Hook_Farms_Pool_Cost_Estimate_Rev3
10/08/2021 Activity Document Fee Worksheet PL2021-087
10/12/2021 Letter Applicant Letter - FDP (DFDP)
02/23/2022 Approved Plans Appoved PL2021087 Civil Plan Set
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home