Planning Application Status

PL2020343




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020343
Paragon Star Village - Paragon Parkway (Private Street)
Commercial Final Development Plan
Commercial Final Development Plan
Approved
11/12/2020
HAPPY VALLEY PROPERTIES LLC
Locations
Contacts
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
GBA ARCHITECTS ENGINEERS , Address:9801 RENNER BLVD, Phone:(913) 492-0400  
GBA ARCHITECTS ENGINEERS , Address:9801 RENNER BLVD, Phone:(913) 492-0400  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 01/20/2021 01/20/2021
Jennifer Thompson
Engineering Review Approved with Conditions 01/20/2021 01/20/2021
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
01/20/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
01/20/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $166,262.20
DE Future Repair Work
Corrective Action Required
01/20/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review No Comments 01/20/2021 01/15/2021
Jim Eden
Code Statement
Informational
01/12/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Informational
01/20/2021

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
Traffic Review No Comments 01/20/2021 01/15/2021
Michael Park
Building Codes Review No Comments 01/20/2021 01/12/2021
Mike Weisenborn
Planning Review No Comments 12/22/2020 12/22/2020
Sue Pyles, P.E.
Engineering Review Corrections 12/22/2020 12/22/2020
Sue Pyles, P.E.
Corrective Action Required
12/21/2020

Sheet 1: I apologize, I overlooked these items on my previous review. • Please revise the LS Water Utilities contact phone number to 816-969-1900 in the Sanitary Sewer and Water contacts. • Revise “Public” to “Private” in the project title.
Corrective Action Required
12/21/2020

Sheet 16: Please include domestic water line, fire line, and water meter sizes in this set of plans.
Corrective Action Required
12/21/2020

ADA Note: Please note that 2.00% cross slope and 8.33% running slope shown are the maximum slopes allowed by ADA, and do not include a construction tolerance. Slopes that exceed the maximum in the field will not be accepted. This is an informational comment.
Corrective Action Required
12/21/2020

Traffic Review No Comments 12/22/2020 12/22/2020
Michael Park
Fire Review Approved with Conditions 12/22/2020 12/16/2020
Jim Eden
Code Statement
Informational
12/16/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
12/15/2020

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
FDC
Resolved
12/16/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: The locations of the FDC's are not shown on the buildings. Additional hydrants may be needed.
Building Codes Review No Comments 12/22/2020 12/15/2020
Joe Frogge
Water
Fire Review Corrections 12/01/2020 12/02/2020
Jim Eden
Code Statement
Corrective Action Required
12/01/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
12/02/2020

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
FDC
Corrective Action Required
12/02/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: The locations of the FDC's are not shown on the buildings. Additional hydrants may be needed.
Planning Review Corrections 12/01/2020 12/02/2020
Mike Weisenborn
Corrective Action Required
12/01/2020

Provide a dimension sheet or add to an existing sheet the parking stall dimensions width and length. Also the street/drive width. Also label both sidewalks width. I apologize if I have overlooked this within the plan set.
Miscellaneous Correction
Corrective Action Required
12/02/2020

The application fee of $600.00 has not yet been paid.
Engineering Review Corrections 12/01/2020 12/01/2020
Sue Pyles, P.E.
Corrective Action Required
12/01/2020

Sheet 1: Remove the approval signature block for the City. A stamp will be provided electronically when approved.
Corrective Action Required
12/01/2020

Sheet 2: Please coordinate the hatching used with the hatching in the Legend.
Corrective Action Required
12/01/2020

Sheet 5: The 100-year WSE shown does not match the 100-year WSE shown on the West Bridge plans. Please revise as needed.
Corrective Action Required
12/01/2020

Sheet 6: The 100-year WSE shown does not match the 100-year WSE shown on the East Bridge plans. Please revise as needed.
Corrective Action Required
12/01/2020

Please show the ADA Accessible Path on this plan set. Slope requirements will be reviewed when the path has been shown.
Corrective Action Required
12/01/2020

Sheet 14: • Sanitary sewer Construction Note S9 doesn’t seem to be used. Please remove or add to the Plan view. • All connections to public sanitary sewer shall be by cut-in wye only. Please show and label accordingly. • Label the bend between S25 and S26 in Enlargement #1. • Why do some of the storm sewer lines have a solid line down the middle in addition to the hatching, south of Structure 5602 as one example, but most do not? • Include “Public” in utility labels as appropriate.
Corrective Action Required
12/01/2020

Sheet 15: • Please dimension the riprap on this sheet or elsewhere in the plan set for correct construction. • Label the west water line connection. • Water meters are not allowed in parking spaces. In this type of completely paved area, the vaults are typically located in the sidewalk. • The storm sewer between Structures 5600 & 5601 is labeled as by separate plan. Please delete, as this is included in this set of plans. • The leader for the irrigation sleeve just to the west of Structure 4302 isn’t pointing to anything.
Corrective Action Required
12/01/2020

Sheet 16: The Structure 5600 label shows the wrong size. Please revise.
Corrective Action Required
12/01/2020

Sheet 19: Please review the pavement sections, and only include what is being used in this project. Verify that the pavement information throughout the plan set is consistent and meets City requirements.
Traffic Review Approved with Conditions 12/01/2020 12/01/2020
Michael Park
Corrective Action Required
12/01/2020

Street Name Signs for Paragon Pkwy and River Road shall include the "Private Street" Tag per Standard Detail.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 12/07/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
11/12/2020 Engineers Estimate 2020_11_4 Paragon Parkway Estimate
11/12/2020 Plans 2020_11_06_PARAGON PARKWAY
12/02/2020 Letter Applicant Letter - FDP (DFDP)
12/07/2020 Receipt Receipt for transaction:2020-007878
12/15/2020 Letter 2020_12_15 Paragon Parkway Comments Response
12/15/2020 Plans 2020_12_15_PARAGON PARKWAY
12/22/2020 Letter Applicant Letter - FDP (DFDP)
01/12/2021 Engineers Estimate 2021_1_12 Paragon Parkway Estimate
01/12/2021 Plans 2021_1_12 PARAGON PARKWAY
01/12/2021 Letter 2021_1_12 Paragon Parkway Comments Response
01/13/2021 Activity Document PL2020343 Paragon Star Village - Paragon Parkway FDP Estimate Review Comments
01/20/2021 Activity Document Fees PL2020343 Paragon Star Village Paragon Pkwy FDP
01/20/2021 Letter Applicant Letter - FDP (DFDP)
12/08/2022 Approved Plans Approved Village Private Street and Utilities
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home