Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
01/20/2021
|
01/20/2021
|
|
Jennifer Thompson
|
|
|
Engineering Review
|
Approved with Conditions
|
01/20/2021
|
01/20/2021
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $166,262.20
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Fire Review
|
No Comments
|
01/20/2021
|
01/15/2021
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Water Supply
IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
|
|
|
Traffic Review
|
No Comments
|
01/20/2021
|
01/15/2021
|
|
Michael Park
|
|
|
Building Codes Review
|
No Comments
|
01/20/2021
|
01/12/2021
|
|
Mike Weisenborn
|
|
|
Planning Review
|
No Comments
|
12/22/2020
|
12/22/2020
|
|
Sue Pyles, P.E.
|
|
|
Engineering Review
|
Corrections
|
12/22/2020
|
12/22/2020
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Sheet 1: I apologize, I overlooked these items on my previous review.
• Please revise the LS Water Utilities contact phone number to 816-969-1900 in the Sanitary Sewer and Water contacts.
• Revise “Public” to “Private” in the project title.
|
|
Corrective Action Required
Sheet 16: Please include domestic water line, fire line, and water meter sizes in this set of plans.
|
|
Corrective Action Required
ADA Note: Please note that 2.00% cross slope and 8.33% running slope shown are the maximum slopes allowed by ADA, and do not include a construction tolerance. Slopes that exceed the maximum in the field will not be accepted. This is an informational comment.
|
|
Corrective Action Required
|
|
|
Traffic Review
|
No Comments
|
12/22/2020
|
12/22/2020
|
|
Michael Park
|
|
|
Fire Review
|
Approved with Conditions
|
12/22/2020
|
12/16/2020
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Water Supply
Corrective Action Required
IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
|
|
FDC
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required: The locations of the FDC's are not shown on the buildings. Additional hydrants may be needed.
|
|
|
Building Codes Review
|
No Comments
|
12/22/2020
|
12/15/2020
|
|
Joe Frogge
|
|
Water
|
Fire Review
|
Corrections
|
12/01/2020
|
12/02/2020
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Water Supply
Corrective Action Required
IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required: The locations of the FDC's are not shown on the buildings. Additional hydrants may be needed.
|
|
|
Planning Review
|
Corrections
|
12/01/2020
|
12/02/2020
|
|
Mike Weisenborn
|
|
Corrective Action Required
Provide a dimension sheet or add to an existing sheet the parking stall dimensions width and length. Also the street/drive width. Also label both sidewalks width. I apologize if I have overlooked this within the plan set.
|
|
Miscellaneous Correction
Corrective Action Required
The application fee of $600.00 has not yet been paid.
|
|
|
Engineering Review
|
Corrections
|
12/01/2020
|
12/01/2020
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Sheet 1: Remove the approval signature block for the City. A stamp will be provided electronically when approved.
|
|
Corrective Action Required
Sheet 2: Please coordinate the hatching used with the hatching in the Legend.
|
|
Corrective Action Required
Sheet 5: The 100-year WSE shown does not match the 100-year WSE shown on the West Bridge plans. Please revise as needed.
|
|
Corrective Action Required
Sheet 6: The 100-year WSE shown does not match the 100-year WSE shown on the East Bridge plans. Please revise as needed.
|
|
Corrective Action Required
Please show the ADA Accessible Path on this plan set. Slope requirements will be reviewed when the path has been shown.
|
|
Corrective Action Required
Sheet 14:
• Sanitary sewer Construction Note S9 doesn’t seem to be used. Please remove or add to the Plan view.
• All connections to public sanitary sewer shall be by cut-in wye only. Please show and label accordingly.
• Label the bend between S25 and S26 in Enlargement #1.
• Why do some of the storm sewer lines have a solid line down the middle in addition to the hatching, south of Structure 5602 as one example, but most do not?
• Include “Public” in utility labels as appropriate.
|
|
Corrective Action Required
Sheet 15:
• Please dimension the riprap on this sheet or elsewhere in the plan set for correct construction.
• Label the west water line connection.
• Water meters are not allowed in parking spaces. In this type of completely paved area, the vaults are typically located in the sidewalk.
• The storm sewer between Structures 5600 & 5601 is labeled as by separate plan. Please delete, as this is included in this set of plans.
• The leader for the irrigation sleeve just to the west of Structure 4302 isn’t pointing to anything.
|
|
Corrective Action Required
Sheet 16: The Structure 5600 label shows the wrong size. Please revise.
|
|
Corrective Action Required
Sheet 19: Please review the pavement sections, and only include what is being used in this project. Verify that the pavement information throughout the plan set is consistent and meets City requirements.
|
|
|
Traffic Review
|
Approved with Conditions
|
12/01/2020
|
12/01/2020
|
|
Michael Park
|
|
Corrective Action Required
Street Name Signs for Paragon Pkwy and River Road shall include the "Private Street" Tag per Standard Detail.
|
|
|