Planning Application Status

PL2020176




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020176
ARIA PUBLIC STREET AND STORM
Engineering Plan Review
Engineering Plan Review
Void
06/12/2020
UNITY SCHOOL OF CHRISTIANITY
Locations
Contacts
NICK HEISER, Address:OLSSON, PROJECT MANAGER, Phone:(816) 442-6056  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
UNITY SCHOOL OF CHRISTIANITY, Address:1901 NW BLUE PKWY  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 08/03/2020 03/08/2021
Sue Pyles, P.E.
Engineering Review No Comments 03/05/2021 03/05/2021
Sue Pyles, P.E.
Traffic Review No Comments 03/05/2021 02/22/2021
Michael Park
Traffic Review No Comments 08/03/2020 07/28/2020
Michael Park
Traffic Review Corrections 06/26/2020 06/29/2020
Michael Park
Corrective Action Required
06/29/2020

The bike lane markings should be removed considering the section of LSR north and south of the proposed improvements are existing paved shoulder and do not include bike lane markings at this time.
Corrective Action Required
06/29/2020

The ADA Sidewalk Ramps do not require detectable warning surface at driveway crossings; only at public street crossings and major intersections.
Corrective Action Required
06/29/2020

Plans shall note all longitudinal markings (e.g. lane lines) as High-Build Paint, and all symbols, diagonals, stop lines, etc. as Pre-Formed Thermoplastic material according to City Standards and Specifications.
Corrective Action Required
06/29/2020

Plans should detail a curb transition to existing grade at each end of the improvements. The curb should not be a vertical point of conflict or ramped edge adjacent to the existing shoulder that creates a safety issue for motorists or bicyclists.
Engineering Review Corrections 06/26/2020 06/26/2020
Sue Pyles, P.E.
Corrective Action Required
06/29/2020

General: • Clarify existing vs. proposed (with this project) vs. proposed (with future development project) contours throughout the plan set. • Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
06/29/2020

Sheet C1: Remove the City Review signature block, the City doesn’t sign plan sheets like that.
Corrective Action Required
06/29/2020

Sheet 8: Detectable warnings are not required at entrances. Please remove.
Corrective Action Required
06/29/2020

Sheet C12: • Label the horizontal separation between Structure A2 and the proposed water line, to verify it meets the City’s separation requirements. • Include dimensional information to facilitate field verification of location. Bearings are not helpful to field inspectors. • The City requires the design HGL to be contained within the pipe. Storm Line B does not meet this requirement. • Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” • Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity. • Include rip rap dimensions to ensure it can be constructed correctly.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.