Summary
PL2020157
CHASE ATM
Commercial Final Development Plan
Commercial Final Development Plan
Approved
05/21/2020
PINE TREE PLAZA LLC
Locations
Contacts
PINE TREE PLAZA LLC, Address:601 E SOUTH ST  
Not shown for privacy reasons.
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review No Comments 07/14/2020 07/13/2020
Jim Eden
Building Codes Review Approved with Conditions 07/14/2020 07/10/2020
Joe Frogge
Corrective Action Required
07/10/2020

Building permits will be required. Complete electrical design will be required at that point.
Engineering Review Approved with Conditions 07/14/2020 07/10/2020
Loic Nguinguiri, E.I.
DE Engineers Estimate
Corrective Action Required
07/10/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $900.00
DE C&O #11 Pavement Thickness
Corrective Action Required
07/10/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
07/10/2020

Please contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
Planning Review No Comments 07/14/2020 07/08/2020
Shannon McGuire
Traffic Review No Comments 07/14/2020 07/07/2020
Michael Park
Planning Review Corrections 06/29/2020 06/22/2020
Shannon McGuire
Corrective Action Required
06/22/2020

The previous comment letter request that Type CG-1 curb & gutter be added. While the curb has been, there is no reference that it is the required CG-1 type nor was a standard detail included. Please revise the plans to reflect the required curb type and include a standard detail.
Engineering Review Corrections 06/29/2020 06/22/2020
Sue Pyles, P.E.
Corrective Action Required
06/22/2020

As previously requested - Please provide an EOOPCC sheet (cost estimate).
Building Codes Review Approved with Conditions 06/29/2020 06/22/2020
Shannon McGuire
Corrective Action Required
06/22/2020

Building permits will be required. Complete electrical design will be required at that point.
Traffic Review No Comments 06/29/2020 06/22/2020
Shannon McGuire
Fire Review No Comments 06/29/2020 06/22/2020
Shannon McGuire
Planning Review Corrections 06/05/2020 06/05/2020
Shannon McGuire
Corrective Action Required
06/05/2020

Please label the height of the proposed light poles.
Corrective Action Required
06/05/2020

Please provide the manufacturer’s specification sheets for proposed exterior lighting.
Corrective Action Required
06/05/2020

CG-1 concrete curbing required around all parking areas and access drives in office, commercial and industrial districts. Please show a curb around the area currently shown as being striped south of the proposed ATM drive lane.
Corrective Action Required
06/05/2020

All signs must comply with the sign requirements as outlined in the sign section of the ordinance. The canopy elevation sheet depicts what looks like a Chase Logo sign on the roof of the ATM canopy. This would be a prohibited roof sign and cannot be approved by staff.
Fire Review No Comments 06/05/2020 06/04/2020
Jim Eden
Engineering Review Corrections 06/05/2020 06/04/2020
Loic Nguinguiri, E.I.
Corrective Action Required
06/04/2020

Please provide an EOOPCC sheet (cost estimate).
Corrective Action Required
06/04/2020

The proposed pavement section specified in key note 11 doesn’t meet City requirements. It appears that the required 4” of aggregate base is missing. Please revise. Feel free to provide a pavement cross sectional view for illustration.
Traffic Review No Comments 06/05/2020 06/02/2020
Michael Park
Building Codes Review Approved with Conditions 06/05/2020 05/29/2020
Joe Frogge
Corrective Action Required
05/29/2020

Building permits will be required. Complete electrical design will be required at that point.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $1,000.00 $1,000.00 Paid 06/01/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: