Planning Application Status

PL2020028




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020028
THE SUMMIT CHURCH
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/11/2020
THE UNITED METHODIST CHURCH OF LEES SUMM
Locations
Contacts
THE UNITED METHODIST CHURCH OF LEES SUMM, Address:3381 NW CHIPMAN RD  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Codes Review No Comments 03/26/2020 03/24/2020
Joe Frogge
Fire Review Approved with Conditions 03/26/2020 03/24/2020
Jim Eden
Code Statement
Informational
03/19/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review Approved with Conditions 03/26/2020 03/24/2020
Michael Park
Miscellaneous Correction
Informational
03/24/2020

Requires DA amendement to revise timing of offsite public transportation improvements. Study supporting the deferred improvements to a future phase has been submitted and accepted. KCMO is still reviewing the proposal/study for concurrance.
Engineering Review Approved with Conditions 03/26/2020 03/23/2020
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
03/23/2020

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
03/23/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $849.37
Planning Review No Comments 03/26/2020 03/23/2020
Hector Soto Jr.
Building Codes Review No Comments 03/18/2020 03/18/2020
Joe Frogge
Engineering Review Corrections 03/18/2020 03/16/2020
Loic Nguinguiri, E.I.
Corrective Action Required
03/16/2020

• General : On the cover sheet, please add the developer’s contact information.
Corrective Action Required
03/16/2020

• General : On the cover sheet, please revise the hatchings of the map legend to “Existing Phase 1 Building” and “New Phase 1A Building”. Make sure that the update matches the rest of the plans.
Corrective Action Required
03/16/2020

• General : On the cover sheet, please label “NW View High Dr” within vicinity map.
Corrective Action Required
03/16/2020

• General : On the EOOPCC sheet (cost estimate), please add the following cost items: o Grading (Cut/Fill) o Bends + Tees (HDPE pipe) o Removal of existing storm pipes (Demolition)
Corrective Action Required
03/16/2020

• General : On the EOOPCC sheet, please edit “5’ sidewalk” item to “sidewalk” since it includes both 5’ and 8’ sidewalks.
Corrective Action Required
03/16/2020

• General : Both the terms “nyoplast” and “nyloplast” appear on the plans. Please revise all to “nyloplast”.
Corrective Action Required
03/16/2020

• Sheet C.100 : As partially shown on page C.201, please revise to show (using a leader line) the (2) two new 8’ sidewalks connected to the new phase 1A building.
Corrective Action Required
03/16/2020

• Sheet C.100 : Even though the City allows 2%, the maximum slope across sidewalk listed on the plans should be 1.5%. Please revise.
Corrective Action Required
03/16/2020

• Sheet C.200 : Regarding contour elevations on the grading sheet, please tie back proposed contours into existing contours.
Corrective Action Required
03/16/2020

• Sheet C.201 : On the southwest corner of the new phase 1A building, Please make sure that the 12” Nyloplast Inlet leader points at the actual structure. Add a similar leader for the 12” inlet structure right above.
Corrective Action Required
03/16/2020

• Sheet C.300 : As previously mentioned, the plans call for an existing tee (at STA 0+00) to be plugged to the north for future connection. Is it not currently capped? Please clarify/revise.
Corrective Action Required
03/16/2020

• Sheet C.301 : On the plan view, please revise the leader note to “12” 45° Bend” around STA 0+55.
Traffic Review Approved with Conditions 03/18/2020 03/13/2020
Michael Park
Miscellaneous Correction
Corrective Action Required
03/11/2020

Ordinanced conditions of PDP approval for required access/turn lane along View High associated with Phase 2 need be modified, or improvements completed prior to occupancy of this phase (considered a portion of Phase 2 development).
Fire Review Approved with Conditions 03/18/2020 03/12/2020
Jim Eden
Code Statement
Informational
03/11/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Planning Review No Comments 03/18/2020 03/11/2020
Hector Soto Jr.
Traffic Review Approved with Conditions 02/26/2020 02/26/2020
Michael Park
Miscellaneous Correction
Corrective Action Required
02/28/2020

Staff needs to review applicable ordinance conditions of PDP approval for required access/turn lane along View High associated with Phase 2 in consideration of the completed development, development proposed and whether or not that threshold has been reasonably determined met at this time. Those improvements may or may not be required.
Building Codes Review No Comments 02/26/2020 02/25/2020
Joe Frogge
Engineering Review Corrections 02/26/2020 02/21/2020
Sue Pyles, P.E.
Corrective Action Required
02/21/2020

General: • Add a cover sheet with all appropriate information to the plan set. • Submit an Engineer’s Estimate of Probable Construction Costs. • Pipe profiles are required for all pipes greater than 6” in diameter. • More clearly delineate between the existing and proposed roof drains. As drawn, they are both drawn the same. • Include a standard details for the proposed Nyloplast inlets and the sidewalk.
Corrective Action Required
02/21/2020

Sheet C.200: Clearly delineate existing and proposed contours from each other and the rest of the plan. Label all contours.
Corrective Action Required
02/21/2020

Sheet C.300: • The plans call for an existing tee to be plugged to the north for future connection. Is it not currently capped? • Include connection information for the proposed short section of roof drain where it connects to the existing system near the north end of the existing building. • The 6” roof drain connection label does not seem to be pointing to the correct location. Please revise. • Is the short section 6” or 12” in diameter? There appear to be conflicting labels. • Label the first two bends on the section being extended. • Both HDPE and PVC seem to be shown as pipe material. Please clarify.
Planning Review Corrections 02/26/2020 02/20/2020
Hector Soto Jr.
Corrective Action Required
02/20/2020

SIDEWALKS. - The sidewalk entering the building on the north side of the addition is labeled as 5' wide. However, it scales as 4' wide on all civil sheets. Revise. - The sidewalk entering the building near the northeast corner of the addition is labeled as 5' wide. However, it scales as 4.5' wide on all civil sheets. Revise.
Corrective Action Required
02/20/2020

TITLE BLOCK. Revise the phase number listed in the title block from Phase 2 to Phase 1A. The development agreement in place requiring certain road improvements are triggered by a defined building expansion identified as Phase 2. This proposed office expansion does not fall under the defined Phase 2 building expansion.
Corrective Action Required
02/20/2020

SITE DATA TABLE. Provide the following information: - Lot area; - Building area (existing, addition and total); - FAR (existing, addition and total); - Impervious coverage square footage and percentage (existing, addition and total); - Existing parking spaces
Corrective Action Required
02/20/2020

LIGHT FIXTURES. Provide cut-sheets for all proposed exterior light fixtures to review for compliance with Sections 8.220, 8.260 and 8.270 of the UDO.
Fire Review Approved with Conditions 02/26/2020 02/13/2020
Jim Eden
Code Statement
Informational
02/13/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 02/11/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/11/2020 Receipt Receipt for transaction: 2020-000557
02/11/2020 Letter Routing Sheet - FDP
02/11/2020 Plans C.300
02/11/2020 Plans 20-0207 The Summit Phase 2 - FDP Architectural Submittal
02/11/2020 Plans Binder1
02/11/2020 Plans C.100
02/11/2020 Plans C.200
02/11/2020 Plans C.201
02/28/2020 Letter Applicant Letter - FDP (DFDP)
03/11/2020 Plans C.200
03/11/2020 Plans C.201
03/11/2020 Plans C.300
03/11/2020 Plans C.301
03/11/2020 Plans Light fixture Submittal Exterior
03/11/2020 Plans Binder1
03/11/2020 Plans C.001
03/11/2020 Plans C.100
03/11/2020 Letter Resubmittal Routing Sheet - FDP
03/18/2020 Letter Applicant Letter - FDP (DFDP)
03/19/2020 C.200
03/19/2020 C.001
03/19/2020 C.100
03/19/2020 C.300
03/19/2020 C.201
03/19/2020 C.301
03/19/2020 Cost Estimate 3-19-2020
03/19/2020 SUBMITTAL LETTER 3-19-2020
03/23/2020 Activity Document Fees PL2020028 The Summit Church FDP
03/26/2020 Letter Applicant Letter - FDP (DFDP)
03/30/2020 Approved set FDP- Summit church addition
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home