ATTIC STORAGE OF LEES SUMMIT
Commercial Final Development Plan
Commercial Final Development Plan
Approved
07/15/2019
ER PROPERTIES LLC
Locations
Contacts
ER PROPERTIES LLC, Address:720 S ROGERS RD  
STRICKLAND CONSTRUCTION CO INC, Address:720 S ROGERS RD STE B, Phone:(913) 764-7000  
HG CONSULT, INC, Address:9007 PINE ST, Phone:(816) 759-2285  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 09/18/2019 09/12/2019
Sharon Clay
DE C&O #11 Pavement Thickness
Corrective Action Required
09/11/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
09/11/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
09/11/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $11,041.78
DE Future Repair Work
Corrective Action Required
09/11/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review No Comments 09/18/2019 09/12/2019
Sharon Clay
Fire Review Approved with Conditions 09/18/2019 09/11/2019
Jim Eden
Code Statement
Informational
09/11/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Informational
09/11/2019

Standpipes are required for this project.
Planning Review Corrections 09/06/2019 09/06/2019
Jennifer Thompson
Corrective Action Required
09/06/2019

Please reconcile the building permit plan sheets for the mechanical/architectural as it relates to the roof top units and have those match the architectural drawings as submitted in the final development plan. Also, as part of the preliminary development plan approval there was a requirement that: "the RTU screening material (those views not screened by parapet), shall be of the same color, material as the proposed stucco finished wall panels".
Fire Review Approved with Conditions 09/06/2019 09/06/2019
Jim Eden
Code Statement
Informational
08/29/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Informational
08/29/2019

Standpipes are required for this project.
Engineering Review Approved with Conditions 09/06/2019 09/05/2019
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
08/29/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
08/29/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
08/29/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $11,041.78
DE Future Repair Work
Corrective Action Required
08/29/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Building Codes Review No Comments 09/06/2019 09/05/2019
Joe Frogge
Traffic Review No Comments 09/06/2019 09/03/2019
Michael Park
Building Codes Review No Comments 08/22/2019 08/27/2019
Joe Frogge
Planning Review Corrections 08/22/2019 08/26/2019
Jennifer Thompson
Corrective Action Required
08/23/2019

Elevations were not received on the first submittal or the second submittal. Additional comments will be forthcoming once the submittal is received.
Corrective Action Required
08/23/2019

Refer to comments #2, #3, #7, #12 from original staff comment letter, these relate to the elevations.
Corrective Action Required
08/23/2019

Revise the accessible sign detail to require the minimum distance from the bottom of the sign at a minimum of 60 inches above the floor of the parking space, measured to the bottom of the sign.
Corrective Action Required
08/23/2019

The UDO requires trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. The pad and approach shall be improved with a minimum six inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of four inches of granular base course. Please revise site plan to indicate this.
Corrective Action Required
08/26/2019

In the landscape schedule it seems the red maple label is still showing up, please remove for clarity.
Engineering Review Approved with Conditions 08/22/2019 08/22/2019
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
08/22/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
08/22/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
08/22/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $11,041.78
DE Future Repair Work
Corrective Action Required
08/22/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 08/22/2019 08/15/2019
Michael Park
Fire Review Approved with Conditions 08/22/2019 08/15/2019
Jim Eden
Code Statement
Informational
08/15/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Imposed Loads
Corrective Action Required
08/15/2019

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.` Action required: The fire lanes shall all be heavy duty pavement.
Misc.
Informational
08/15/2019

Standpipes are required for this project.
Engineering Review Corrections 07/30/2019 07/30/2019
Sue Pyles, P.E.
Corrective Action Required
07/30/2019

General: • Submit an Engineer's Estimate of Probable Construction Costs. • Include Fire Hydrant and Flared End Section standard details.
Corrective Action Required
07/30/2019

Sheet 3: • Revise Note 10, the lot is within the floodplain (as shown in Plan view). • Remove reference to KCAPWA in Note 12, the City’s details are requirements govern. • Revise the anticipated completion date in the Site Information section. • Clearly indicate regular and heavy duty pavement areas in Plan view. • Revise the “Pavement Section” for clarity. Include separate details for asphalt and concrete sections.
Corrective Action Required
07/30/2019

Sheet 6: Delineate drainage area boundaries.
Corrective Action Required
07/30/2019

Sheet 8: • Sanitary sewer service line connection to main shall be by cut-in wye. Please include requirement in connection label. • The water meter is not located as required in Section 6901.L.1.a in the City’s Design and Construction Manual. • Water service connection to the main shall be by corporation stop, not tee. Please revise.
Planning Review Corrections 07/30/2019 07/30/2019
Jennifer Thompson
Corrective Action Required
07/29/2019

Elevations were not received for the proposed building. Additional comments will be forthcoming once the submittal is received.
Corrective Action Required
07/29/2019

The pilaster located on the northeast corner of the building shall incorporate more architectural detail, adding depth and interest as it wraps around towards the interior of the building. (Ordinance condition)
Corrective Action Required
07/29/2019

The glass windows on the second and third stories shall be opaque. Please confirm this will be the case. (Ordinance condition)
Corrective Action Required
07/29/2019

The shared private driveway shall be designated as a fire lane in accordance with City Ordinances. (Ordinance condition)
Corrective Action Required
07/29/2019

Sign permits shall be obtained prior to installation of any signs throughout the Development Services Department.
Corrective Action Required
07/29/2019

Are any existing parking lot pole lighting anticipated to e relocated to this site? If so, the parking lot pole lighting shall meet the requirements of the UDO.
Corrective Action Required
07/29/2019

Please indicate on the elevations the location of the RTU's.
Corrective Action Required
07/29/2019

On Sheet 3 revise the note stating the anticipated completion date.
Corrective Action Required
07/29/2019

Clearly indicate the heavy duty pavement sections and the regular pavement sections. The parking space area is the only area that doesn't require heavy duty pavement. Revise the pavement details to comply with UDO standards.
Corrective Action Required
07/29/2019

In the landscape worksheet revise the 14 Austrian Pines to dogwood as labeled on the site plan.
Corrective Action Required
07/29/2019

Include in the landscape worksheet the high impact buffer quantity requirements (along the east side of the property) and what is provided. The labeling for this area doesn't match what is being "called out" as provided. Proposed tree species will need to be revised, ornamental's and skyrocket junipers should replace the maple and Austrian pine species. Revise the Landscape note that refers to Article 14 of the UDO, replace it with Article 8.
Corrective Action Required
07/29/2019

The mounting height of the wall pak lighting is limited to a total height of 15' within the perimeter area adjacent to the residential district. The distance of the perimeter area is measured 100-feet from the adjoined district. All remaining fixtures are required to be at a 20' maximum mounting height to meet UDO restrictions.
Corrective Action Required
07/30/2019

Provide the full wall-pak lighting specification sheet. Please include the maximum wattage proposed for each fixture. Is 58 Lum. Watts the total maximum wattage proposed?
Corrective Action Required
07/30/2019

Revise note number 10 on Sheet 3.
Corrective Action Required
07/30/2019

Traffic Review No Comments 07/30/2019 07/29/2019
Michael Park
Building Codes Review Corrections 07/30/2019 07/25/2019
Joe Frogge
Corrective Action Required
07/25/2019

Domestic water tap and meter is not designed per published standards. Actions required: - Specify corp tap in lieu of cut-in tee - Specify copper piping from main to meter and an additional 10' towards building.
Fire Review Corrections 07/30/2019 07/18/2019
Jim Eden
Code Statement
Informational
07/18/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Imposed Loads
Resolved
08/15/2019

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.` Action required: The fire lanes shall all be heavy duty pavement.
Misc.
Informational
07/18/2019

Standpipes are required for this project.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 07/15/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
07/15/2019 Receipt Receipt for transaction: 2019-004788
07/15/2019 Letter Routing Sheet - FDP
07/30/2019 Letter Applicant Letter - FDP (DFDP)
08/13/2019 Plans WP1 Spec Sheet
08/13/2019 Plans ATTIC STORAGE COST ESTIMATE 080919
08/13/2019 Plans Attic Storage-FDP-Revised 8-6-19
08/13/2019 Plans Response to city comments 073019
08/13/2019 Letter Resubmittal Routing Sheet - FDP
08/15/2019 Letter Resubmittal Routing Sheet - FDP
08/28/2019 Letter Applicant Letter - FDP (DFDP)
08/29/2019 Letter Resubmittal Routing Sheet - FDP
08/29/2019 Plans Combined Set
08/29/2019 Plans Pages from ARCH - Attic Storage - Lee's Summit 291 - 8.8.2019 - Signed & Sealed
09/06/2019 Letter Applicant Letter - FDP (DFDP)
09/11/2019 Plans 383sjzfsv3kfdsa4cf0ur3vr3qc15507103112019041030216
09/11/2019 Plans ER Properties - 9.10.2019
09/11/2019 Letter Resubmittal Routing Sheet - FDP
09/12/2019 Activity Document Fees PL2019238 Attic Storage FDP
09/12/2019 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home