Summary
PL2019155
PERGOLA PARK 4TH PLAT - SANITARY MAIN EXTENSION
Engineering Plan Review
Engineering Plan Review
Approved
04/19/2019
NLV PERGOLA PARK LLC
Locations
Contacts
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
NLV PERGOLA PARK LLC, Address:4400 STATE LINE RD STE 170  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 07/15/2019 07/08/2019
Sue Pyles, P.E.
Engineering Review Corrections 07/01/2019 06/25/2019
Sue Pyles, P.E.
Corrective Action Required
06/25/2019

Do the easements shown in this plan set match the final plat moving through the approval process? If not, how will this all be coordinated? An email responce to this question is fine.
Corrective Action Required
06/25/2019

Due to lack of adequate horizontal separation, remove the existing pipe upstream of Ex MH A4 in the vicinity of the structure and replace with Class 50 ductile with zinc coated exterior and 401 super coat interior.
Corrective Action Required
06/25/2019

Remove RCE from the Engineer's Estimate of Probable Construction Costs and replace with Zinc Coated DIP.
Engineering Review Corrections 05/03/2019 05/06/2019
Sue Pyles, P.E.
Corrective Action Required
05/06/2019

Sheet 1: • Revise the phone number in General Note 14 to 816-969-1200. • Delete General Note 15, the City’s process has changed. • Revise the Water Utility contact to City of Lee’s Summit Water Utilities, 1200 SE Hamblen Road, 64081.
Corrective Action Required
05/06/2019

Sheet 2: Show and label all Utility Easements on this sheet and throughout the plan set to match the plat.
Corrective Action Required
05/06/2019

Sheet 4: • It is recommended that all service stubs be completely extended through the utility easement to avoid conflicts. • Existing sanitary sewer information shown varies from the record drawing slightly in pipe length, slope, pipe material class, etc. Please revise as needed or indicate field surveyed information (as shown on existing MH top elevations). • The Ex. Line A profile does not need to extend downstream beyond Ex MH A2, but if it does please revise the existing grade gap downstream of EX MH A1. • Please reduce the font on Lots 99 & 109 for clarity. • All service line connections must be made with a cut-in tee. Please revise Lot 103 accordingly. • Is the RCE shown upstream of Ex MH A4 existing or proposed? If proposed, why? There is adequate separation between sanitary and storm sewers. Revise the RCE to be shown more clearly in the Profile view. Show and label the RCE in the Plan view. • Revise the proposed grade line to tie back into the existing grade line at each end.
Corrective Action Required
05/06/2019

Sheet 5: • It is recommended that all service stubs be completely extended through the utility easement to avoid conflicts. • The drop through MH B2 does not meet the 0.5’ minimum. Please revise. • Include Line B stationing at Ex MH A4 in the Profile view. • Label the separation between the sanitary and storm sewers upstream of MH B1. Why is RCE shown rather than meeting separation requirements? • Revise the RCE to be shown more clearly in the profile view. Show and label the RCE in the Plan view.
Corrective Action Required
05/06/2019

Sheet 6: • Revise the Profile view to include Line C stationing. • Record drawings indicate a stub of 8” PVC-SDR 35 was installed at Ex MH A6. Please include this information in the plans and indicate if the existing stub will be used or not. If not, include removal of the stub in the plan set.
Corrective Action Required
05/06/2019

Submit an Engineer's Estimate of Probable Construction Costs.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents