Planning Application Status

PL2019107




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019107
PRESENTATION SCHOOL ADDITION AND RENOVATION
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/15/2019
DIOCESE OF KC-ST JOE REAL ESTATE CORP
Locations
Contacts
DIOCESE OF KC-ST JOE REAL ESTATE CORP, Address:20 W NINTH ST  
CATHOLIC DIOCESE OF KC-ST JOE, Address:130 NE MURRAY RD  
HG CONSULT, INC, Address:9007 PINE ST, Phone:(816) 759-2285  
HOLLIS & MILLER ARCHITECTS, Address:1828 Walnut, Ste. 920, Phone:(816) 442-7700  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 05/06/2019 05/06/2019
Sue Pyles, P.E.
DE Contact ROW Inspector
Corrective Action Required
05/06/2019

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
DE Engineers Estimate
Corrective Action Required
05/06/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $2,581.44 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
DE Future Repair Work
Corrective Action Required
05/06/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 05/06/2019 05/06/2019
Mike Weisenborn
Code Statement
Informational
04/29/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code and local amendments.
Knox Locks
Corrective Action Required
04/29/2019

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required: If the gate is going to be locked a Knox padlock will be required.
Misc.
Corrective Action Required
04/29/2019

Any impairments to fire suppreesion and fire department access shall be coordinated through the Fire Prevention Division.
Building Codes Review No Comments 05/06/2019 05/06/2019
Mike Weisenborn
Planning Review No Comments 05/06/2019 05/06/2019
Shannon McGuire
Traffic Review No Comments 05/06/2019 05/06/2019
Michael Park
Engineering Review Corrections 04/26/2019 04/26/2019
Sue Pyles, P.E.
Corrective Action Required
04/26/2019

The pavement detail shows both geogrid and stabilized subgrade, although the stabilized subgrade does not include a dimension. City standards require geogrid or stabilized subgrade, but not both. Designing a higher standard than the City requires is acceptable. Please verify this was the intent or revise accordingly.
Corrective Action Required
04/26/2019

Sheet C007: Inlet A-1 is dimensioned differently in Plan and Profile views. Please revise accordingly.
Corrective Action Required
04/26/2019

Add Geogrid, Stabilized Subgrade, or both to the estimate. Revise the Crushed Stone quantity to include the 1' beyond curb dimension. The Geogrid/Stabilized subgrade quantity should match the Crushed Stone quantity.
Fire Review Approved with Conditions 04/26/2019 04/26/2019
Mike Weisenborn
Code Statement
Informational
04/19/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code and local amendments.
Knox Locks
Corrective Action Required
04/19/2019

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required: If the gate is going to be locked a Knox padlock will be required.
Misc.
Corrective Action Required
04/19/2019

Any impairments to fire suppreesion and fire department access shall be coordinated through the Fire Prevention Division.
Traffic Review No Comments 04/26/2019 04/25/2019
Michael Park
Planning Review No Comments 04/26/2019 04/22/2019
Shannon McGuire
Building Codes Review No Comments 04/26/2019 04/22/2019
Joe Frogge
Engineering Review Corrections 03/29/2019 03/29/2019
Sue Pyles, P.E.
Corrective Action Required
03/29/2019

General: • Show location of all oil/gas wells, or indicate none are present, and cite the source. • Include floodplain information. • Include an Erosion and Sediment Control plan. • Submit an Engineer's Estimate of Probable Construction Costs. • Revise plans to eliminate “Alternate” storm sewer option. Plans shall show the design that will be constructed.
Corrective Action Required
03/29/2019

Sheet C002: General Note 12 seems to have an extra word, “MAINS”, in the section title. Please revise.
Corrective Action Required
03/29/2019

Sheet C004: • Revise General Note 1 to refer to City of Lee’s Summit specifications only. • Revise General Note 3 to refer to Development Engineering Inspection at 816-969-1200.
Corrective Action Required
03/29/2019

Sheet C006: The pavement section shown does not meet the requirements shown in Section 8.620 of the Unified Development Ordinance. Please revise.
Corrective Action Required
03/29/2019

Sheet C007: • Show HGL in the Profile view. • Verify the size of Existing Inlet A-1 and revise as required.
Traffic Review No Comments 03/29/2019 03/28/2019
Michael Park
Planning Review Corrections 03/29/2019 03/28/2019
Shannon McGuire
Corrective Action Required
03/28/2019

EFIS should be limited to no greater than 30% of any single façade. Please provide information showing the total area of each proposed façade material. Should the EFIS be over the maximum allowed, please reduce the overall amount to meet the 30% requirement.
Corrective Action Required
03/28/2019

All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. The use of a unit mounted screening system would require a modification granted by the governing body at the Preliminary Development Plan process. An “inboard” parapet wall would meet the requirements of the UDO. Please updated the plans to comply with this requirement. Please ensure to include a dashed line indicating the rooftop mechanical equipment’s relationship with the screening wall.
Corrective Action Required
03/28/2019

Please provide a land use table that include the existing and proposed information for the following: • Total floor area • Land area • Number of required and proposed parking spaces • Impervious coverage • Floor Area Ratio (FAR)
Corrective Action Required
03/28/2019

Is the applicant proposing any new lighting? If so, please provide information for the location, height, intensity and type of fixtures. Also, provide a photometric diagram indicating the foot candle levels throughout the site and at the property lines. Additionally, please provide the manufacturer’s specification sheets for proposed exterior lighting. The specification sheets shall indicate the exact fixture to be used.
Building Codes Review No Comments 03/20/2019
Joe Frogge
Fire Review Approved with Conditions 03/29/2019 03/20/2019
Jim Eden
Code Statement
Informational
03/20/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code and local amendments.
Knox Locks
Corrective Action Required
03/20/2019

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required: If the gate is going to be locked a Knox padlock will be required.
Misc.
Corrective Action Required
03/20/2019

Any impairments to fire suppreesion and fire department access shall be coordinated through the Fire Prevention Division.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 03/15/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home