Planning Application Status

PL2018216




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2018216
WOODSIDE RIDGE 1ST PLAT - SANITARY SEWER
Engineering Plan Review
Engineering Plan Review
Complete
12/03/2018
CLAYTON PROPERTIES GROUP INC
Locations
Contacts
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 04/22/2019 04/22/2019
Gene Williams, P.E.
Engineering Review Corrections 03/21/2019 03/21/2019
Gene Williams, P.E.
Corrective Action Required
03/21/2019

Please refer to comment #6 of the applicant letter dated Dec. 26, 2018. Although one of the manholes was eliminated, a wider easement is required. It appears an additional 12 feet would be sufficient, and would not encroach over the building line. Please revise on the plans, and ensure this is updated on the plat.
Corrective Action Required
03/21/2019

Please refer to comment #9 of the applicant letter dated Dec. 26, 2018. It appears the existing City manhole 28-103 is within the limits of the 100 year water surface elevation. Does this manhole currently have a watertight frame and lid with bolt-down assembly? Does this need to be specified as a retrofit?
Corrective Action Required
03/21/2019

Please refer to comment #14 of the applicant letter dated Dec. 26, 2018. In addition to length and diameter of the casing pipe, the wall thickness must be specified. For this particular casing pipe size, the minimum wall thickness is 3/16" (0.188 inches).
Corrective Action Required
03/21/2019

Water Utilities will not allow a public extension to the north "Village Care Center" shown on the plans. This should be shown as a private sanitary sewer lateral, with appropriate clean-outs and a wye connection to the public main along Ashurst Dr. A profile view should be provided for this long private lateral, as well as a plan view.
Engineering Review Corrections 12/26/2018 12/26/2018
Gene Williams, P.E.
Corrective Action Required
12/26/2018

Sheet C201: Please change the Utility Service Numbers as follows: remove the Public Works contact, and insert in its place "Development Services 816-969-1200".
Corrective Action Required
12/26/2018

Sheet C202: Plumbing notes should eliminate the comment concerning tees. The City of Lee's Summit requires a wye. Tees are not acceptable.
Corrective Action Required
12/26/2018

General Layout Plan: Is it possible to provide a general layout sheet with the entire sanitary sewer line on one sheet, followed by subsequent general layout sheets? This will greatly enhance the plans.
Corrective Action Required
12/26/2018

Sheet C203: The sanitary sewer alignment from manhole 1-6 to manhole 1-2 does not follow what was shown in the Preliminary Development Plan. The issue is that the sanitary sewer is now located partially along rear yards, which is not allowed by the Design and Construction Manual.
Corrective Action Required
12/26/2018

Sheet C2303: We are assuming the future sanitary sewer line to serve lots 198 and 184 are to be installed along a separate route, and not connected to any of the sanitary sewer within the 1st Plat? If not, the extension will need to occur during the 1st phase.
Corrective Action Required
12/26/2018

Sheet C.203: It would appear a manhole could be eliminated between mh #8-3 and #8-5.
Corrective Action Required
12/26/2018

Sheet C.204: Laterals are shown connecting to the main in the middle of the cul-de-sac on Grady Ct. and Joshua Dr. Please move the location of these wyes so they are either at the back of curb, or completely outside the limits of the pavement. The issue is future maintenance. Homeowners would incur excessive costs for maintenance of these laterals, due to the pavement repair requirements.
Corrective Action Required
12/26/2018

Sheet C.206: The same comment above applies to the wye connections within Kaylea Ct.
Corrective Action Required
12/26/2018

Sheet C.206: Please show the horizontal limits of the permenant pool in the pond, as well as the 100 year water surface elevation within the pond in graphic form (i.e, horizontal extent) and an elevation call-out. This may have a bearing on the design of the manholes.
Corrective Action Required
12/26/2018

Sheet C.207: Stream crossings also require ductile iron pipe in addition to concrete encasement. The ductile iron pipe should extend from manhole to manhole. Concrete encasement should be shown bank to bank. Be aware of the comments related to the discharge point for the detention basin. The City feels this discharge point has not been adequately designed for energy dissipation, and any additional design in this area will impact the sanitary sewer in terms of depth. Sufficient depth of cover is required for any change to the energy dissipation measures instituted for the detention basin.
Corrective Action Required
12/26/2018

Sheet C207: Is there an additional stream crossing between mh #1-5 and 1-6? If so, ductile iron pipe and encasement is required.
Corrective Action Required
12/26/2018

Sheet C208: Please call-out the minimum 18 inch vertical spacing at station 28+50.
Corrective Action Required
12/26/2018

Sheet C212: The sanitary sewer is too deep at station 12+25. The maximum depth of cover over the top of the pipe is 15 feet.
Corrective Action Required
12/26/2018

Sheet C213: No standard detail is referenced for the stainless steel casing. In addition, the standard detail contained in the Design and Construction Manual has specific requirements concerning material call-outs on the plans. Please include the standard detail for casing carrier pipe, and ensure that all information listed on the standard detail as to be placed on the plan view or profile view is included on the plan or profile view. Merely calling out "steel casing" is not sufficient.
Corrective Action Required
12/26/2018

Sheet C218: It appears the downstream pipe capacity has been exceeded for a few segments. This would appear to include the segments in the lower reaches of the project. What are the hydraulic grade lines associated with these exceedences? It is our assumption the hydraulic grade line will be above the crown of the pipe, but by how much?
Corrective Action Required
12/26/2018

Sheet C218: Please indicate the event on the sanitary sewer calculation table. We are assuming this is the 50 year event, in accordance with the Design and Construction Manual.
Corrective Action Required
12/26/2018

Are there any shallow manholes utilized on this project? If so, please provide a standard detail for the shallow manhole.
Corrective Action Required
12/26/2018

Please provide the standard detail for stainless steel casing carrier pipe.
Corrective Action Required
12/26/2018

Please provide the standard detail for concrete encasement.
Corrective Action Required
12/26/2018

Please show the 100 year water surface elevaton within all detention basin tracts. This may have a bearing on the design of the manholes. In general, manholes should include watertight, neoprene-gasketed lids with bolt-down assemblies if subject to the 100 year event.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
12/26/2018 Letter DE-Comment Letter (Engineering Plans)
01/11/2019 18-06-22_GNCV_Point A1 Waiver Request
01/11/2019 CVWaiver_DetentionA1
01/11/2019 DetentionDischargeArea
01/11/2019 WaiverWoodsideRidgeSignedPDP
01/11/2019 WoodsideRidgeSanAlignmentDetentionOutlet
03/21/2019 Letter DE-Comment Letter (Engineering Plans)
04/09/2019 Plans 2019.04.04.Sanitary
04/23/2019 Letter MDNRConcurrenceSanLine
04/24/2019 WoodsideRidgeFeeWorksheetSanitaryFY19
06/10/2019 Plans 2019.06.07.SanitaryPlans
06/18/2019 Letter DE-Engineering Plans Approval Letter
06/18/2019 Activity Document Sanitary Easement
06/18/2019 Letter 2019E0023734
11/26/2019 Plans C219 SANITARY SEWER TABLES
11/26/2019 Plans C215 SANITARY SEWER PLAN & PROFILE
11/02/2020 Plans 2020_11_01 Sanitary Sewer Asbuilt Plans
11/11/2022 Accepted Record Drawings Woodside Ridge 1st Sanitary AsBuilts Accepted RD
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home