Planning Application Status

PL2018206




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2018206
SPRINT MASSIVE MIMO UPGRADES KC13XC327
Commercial Final Development Plan
Commercial Final Development Plan
Approved
11/20/2018
GALE COMMUNITES INC
Locations
Contacts
SCC, INC., Address:7171 W 95TH ST, SUITE 600, Phone:(913) 438-7700  
GALE COMMUNITES INC, Address:400 SW LONGVIEW BLVD STE 210  
SCC, INC., Address:7171 W 95TH ST, SUITE 600, Phone:(913) 438-7700  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 04/24/2019 04/22/2019
Hector Soto Jr.
Engineering Review No Comments 11/26/2018 11/30/2018
Mike Weisenborn
Planning Review Corrections 11/26/2018 11/30/2018
Hector Soto Jr.
Corrective Action Required
11/30/2018

SECTION 106 REVIEW. Due to the water tower being located within Longview Farm, which is a listed property on the National Register of Historic Places, the proposed equipment improvements are subject to a Section 106 review under the National Historic Preservation Act prior to approval of the proposed improvements. Please use the following link to see the Section 106 Review information under the Missouri Department of Natural Resources website to undergo said review process: https://dnr.mo.gov/shpo/sectionrev.htm.
Corrective Action Required
11/30/2018

PROOF OF INSURANCE. Provide proof of general liability insurance for claims from injury or death and property damage in an amount approved by the City, but not less than $2,000,000.00 per occurrence for personal injury and $2,000,000.00 per occurrence for property damage with the City listed as an additional insured.
Corrective Action Required
11/30/2018

INSPECTION REPORT. Provide a copy of a physical inspection report for the water tower current within the last three years.
Building Codes Review Approved with Conditions 11/26/2018 11/28/2018
Joe Frogge
Corrective Action Required
11/28/2018

Permit is required for electrical portion of work at PPC. Action required: Comment is for informational purposes.
Fire Review No Comments 12/06/2018 11/27/2018
Jim Eden
Traffic Review No Comments 11/26/2018 11/26/2018
Michael Park
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 11/20/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home