Summary
PL2018185
REECE NICHOLS PHASE 2
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Expired
10/19/2018
TUSTIN LLC
Locations
Contacts
TUSTIN LLC, Address:12650 S PFLUMM RD STE 201  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 12/03/2018 12/03/2018
Shannon McGuire
Corrective Action Required
12/03/2018

All exterior lighting shall be installed in accordance with Section 8.260.
Corrective Action Required
12/03/2018

In accordance with Section 8.180 all roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units.
Engineering Review Approved with Conditions 12/03/2018 12/03/2018
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
12/03/2018

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
12/03/2018

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
12/03/2018

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #06 Land Disturbance
Corrective Action Required
12/03/2018

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #12 Cut & Fill
Corrective Action Required
12/03/2018

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Traffic Review Corrections 12/03/2018 12/03/2018
Michael Park
Corrective Action Required
12/03/2018

Comments regarding the alley design have been sent to the engineer and copied to the assigned development project manager.
Fire Review Approved with Conditions 12/03/2018 11/26/2018
Jim Eden
Code Statement
Informational
11/26/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Corrective Action Required
11/19/2018

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type ffitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Dumpsters
Resolved
11/26/2018

IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. Will the building have its own enclosure or share with another building?
Fire Lanes
Resolved
11/26/2018

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm). The lanes of the split entrance to the alley need to be as wide as possible, with a drivable of no less than 10 feet. Recommend a rollback curb (CG-2) on the island.
Planning Review Corrections 11/01/2018 11/02/2018
Shannon McGuire
Corrective Action Required
11/01/2018

This application will be placed on hold prior to scheduling public hearings until such time as an alley design is submitted and approved by City staff.
Corrective Action Required
11/01/2018

Given the scale of this building Staff would like to see the façade be split into 2 distinct masses with architectural details. Additional meetings may need to be scheduled with the applicant and staff to further talk about this comment.
Corrective Action Required
11/01/2018

Electrical and gas meters, conduits, and other mechanical equipment shall comply with the Design Standards for the Downtown Core Area as outlined in SEC. 8.440. Please update the plans to show details of where the electrical/gas meters, conduits, and other mechanical equipment will be located.
Corrective Action Required
11/01/2018

Please show a continuation of the Downtown street scape in front of this building along SW Market St. For additional street scape design details please contact Scott Ward at 816/969-1849.
Corrective Action Required
11/01/2018

Please label all colors and building materials on the proposed building.
Corrective Action Required
11/01/2018

Please provide a street level rendering that depicts this building in relation to the surrounding area.
Corrective Action Required
11/01/2018

A modification will be required for relief from the UDO’s landscaping requirements. Please provide a written request seeking and justifying the modification.
Corrective Action Required
11/01/2018

Please add the total number of dwelling units and dwelling units per acre to the land use table.
Corrective Action Required
11/01/2018

Please provide details on all proposed exterior lighting. Please also include the manufacturer’s specification sheets for the exact fixtures to be used.
Corrective Action Required
11/01/2018

Are any signs being proposed? If so please provide details.
Corrective Action Required
11/01/2018

Please label the ground cover to be used on the area not covered by the building.
Traffic Review Corrections 11/01/2018 11/01/2018
Michael Park
Corrective Action Required
11/01/2018

The east-west alley should be designed with an alignment that remains straight and centered on the proposed island at Market Street, shifting the designed portion east of the island a few feet south so that the parking end caps can be larger, the traffic transition is evenly split and more gradual for east-west traffic and the operation is more efficient for vehicular movement. The entire alley improvement area would still remain within easement and should not overlap the sewer line leaving a portion of existing easement south of the alley improvement for potential vacation/relinquishment.
Corrective Action Required
11/01/2018

Use a mountable, e.g. CG-2, curbing around the island in the alley. Other curbs in the alley may be a flat/ribbon curb, CG-2, CG-1, or blended, depending on the location and transition to existing curb along Market Street.
Engineering Review Corrections 11/01/2018 11/01/2018
Gene Williams, P.E.
Corrective Action Required
11/01/2018

In addition to notes on the Preliminary Development Plan, please add appropriate notes (i.e., on the plan view) to the sanitary line to the north of existing building as being relocated as part of the first phase.
Corrective Action Required
11/01/2018

In addition to notes on the Preliminary Development Plan, please provide the same justification as shown in the first phase for stormwater detention. This may be in the form of a memorandum, as provided with the first phase of this project.
Fire Review Approved with Conditions 11/01/2018 10/24/2018
Jim Eden
Code Statement
Corrective Action Required
10/24/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Corrective Action Required
10/24/2018

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type ffitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Dumpsters
Corrective Action Required
10/24/2018

IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. Will the building have its own enclosure or share with another building?
Fire Lanes
Corrective Action Required
10/24/2018

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm). The lanes of the split entrance to the alley need to be as wide as possible, with a drivable of no less than 10 feet. Recommend a rollback curb (CG-2) on the island.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Preliminary Development Plan fee $1,800.00 $1,800.00 Paid 10/23/2018
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 10/23/2018
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 10/23/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 12/13/2018 5:00 PM 05:00 PM Council Chambers 12/13/2018 05:00 PM
Public Hearing Review
Complete
12/13/2018
City Council Public Hearing 01/08/2019 06:15 PM Council Chambers 01/08/2019 06:15 PM
Public Hearing Review
Complete
01/08/2019
City Council Ordinance 01/22/2019 06:15 PM Council Chambers 01/22/2019 06:15 PM
Public Hearing Review
Complete
01/22/2019
Documents & Images
Date Uploaded File Type Document Name
10/19/2018 Letter Routing Sheet
10/23/2018 Receipt Receipt for transaction: 2018-006961
11/02/2018 Letter Applicant Letter - Dev. Apps (DRCP)
11/19/2018 Drawing 207 SW Market Rendering
11/19/2018 Letter Resubmittal Routing Sheet
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home