Review Type |
Outcome |
Est. Completion Date |
Completed |
Traffic Review
|
No Comments
|
|
09/12/2018
|
|
Mike Weisenborn
|
|
|
Fire Review
|
No Comments
|
|
09/12/2018
|
|
Mike Weisenborn
|
|
|
Engineering Review
|
Approved with Conditions
|
|
09/12/2018
|
|
Mike Weisenborn
|
|
Corrective Action Required
|
|
|
Planning Review
|
Approved with Conditions
|
|
09/12/2018
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
Corrections
|
08/17/2018
|
08/16/2018
|
|
Michael Park
|
|
Corrective Action Required
Staff to provide traffic impact study. No comments regarding the site plan at this time and potential improvements associated with the traffic study recommendations should not impact the site plan.
|
|
|
Planning Review
|
Corrections
|
08/17/2018
|
08/15/2018
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide a rezoning map showing the following:
1. Boundaries of the property to be rezoned.
2. Legal Description
3. Existing and proposed zoning districts of the property to be rezoned.
4. Zoning, land use, and ownership of all parcels within 185 feet of the property to be rezoned.
|
|
Corrective Action Required
Please provide a copy of the preliminary development plan for the fire station lot and a conceptual plan for the remaining lots.
|
|
Corrective Action Required
Please provide a plan sheet that clearly identifies the boundaries of the PDP for Fire Station #3 and the conceptual plan area.
|
|
Corrective Action Required
Please provide a digital copy of the legal description that is in a format that can be copied and pasted into a word document.
|
|
Corrective Action Required
Please provide a narrative statement that explains the need for the modification of the applicable zoning district regulations to allow the required high impact buffer on the west property line to be located on the adjoining property. A modification will also be required to allow the fence for the high impact buffer to be located on the south property line.
|
|
Corrective Action Required
Please update the landscaping plan to show the offsite landscaping buffer on the west property line.
|
|
|
Engineering Review
|
Corrections
|
08/17/2018
|
08/15/2018
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please define what is covered under the Preliminary Development Plan, and what is covered by the Concept Plan. From the diagram, it appears the entire site is covered by the Concept Plan.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
|
|
DE C&O #14 Common Area Sidewalks
Corrective Action Required
All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
|
|
|
Fire Review
|
No Comments
|
08/17/2018
|
08/08/2018
|
|
Jim Eden
|
|
|