Planning Application Status

PL2017113




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017113
SUMMIT VILLAGE CORPORATE PARK, 1ST PLAT
Minor Plat
Final Plat
Minor Plat
Recorded
05/17/2017
UNITY REALTY LLC
Locations
Contacts
UNITY REALTY LLC, Address:1901 NW BLUE PKWY, Phone:(816) 251-3593  
NEWMARK ZIMMER, Address:1485 SW MARKET ST, Phone:(816) 679-4954  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review No Comments 06/02/2017 06/14/2018
Jim Eden
Planning Review Approved with Conditions 06/26/2017 06/27/2017
Hector Soto Jr.
Corrective Action Required
06/27/2017

PLAT TITLE. Relabel the plat type from a final plat to a minor plat.
Corrective Action Required
06/27/2017

SIGNATURE BLOCK. - Relocate the signature block on Sheet 1 to the lower right-hand side. - Replace the certification/approval language above the City signature lines to the following: "This is to certify that the minor plat of 'Summit Village Corporate Park, Lots 1 and 2' was submitted to and duly approved by the City of Lee's Summit, pursuant to the Unified Development Ordinance No. 5209." - Remove the signature lines for the Mayor and Planning Commission Secretary from both sheets, as these are not required for a minor plat.
Corrective Action Required
06/27/2017

ACCESS EASEMENT. Revise the beginning of the access easement dedication language with more specific language to read as follows, "The ACCESS EASEMENT to provide vehicular access to and from Lots 1 and 2 is hereby reserved...."
Corrective Action Required
06/27/2017

SIDEWALK. Add back and label the existing sidewalk, including its width, along both NW Blue Pkwy and NW Colbern Rd.
Engineering Review No Comments 06/26/2017 06/27/2017
Sue Pyles, P.E.
Traffic Review No Comments 06/26/2017 06/26/2017
Dawn Bell
Fire Review No Comments 06/26/2017 06/26/2017
Dawn Bell
Fire Review No Comments 06/01/2017 06/07/2017
Jim Eden
Traffic Review No Comments 06/01/2017 06/05/2017
Michael Park
Planning Review Corrections 06/01/2017 06/01/2017
Hector Soto Jr.
Corrective Action Required
06/01/2017

RIGHT-OF-WAY. - Label all right-of-way widths and identify the right-of-way centerlines. - As a final plat, the right-of-way for NW Rosemary Court may be dedicated as part of this plat as opposed to dedication by separate document. If the right-of-way will be dedicated as part of this plat, then the City's standard streets dedication paragraph shall be included on the plat.
Corrective Action Required
06/01/2017

LINE WEIGHT. Use a heavier line weight to more easily distinguish the interior lot and tract boundaries as property lines.
Corrective Action Required
06/01/2017

PLAT TITLE. Amend the plat title to include the lot numbers and tract so it reads, Summit Village Corporate Park, Lots 1, 2 and Tract A. Reflect this change throughout the plat as necessary.
Corrective Action Required
06/01/2017

SIGNATURE BLOCK. - Replace the name of Fred DeMoro (Planning Commission Secretary) with Donnie Funk. - Include a City signature block to the lower left-hand corner of Sheet 1.
Corrective Action Required
06/01/2017

LEGAL DESCRIPTION. - The initial tangent bearing referenced in Line 9 of the legal description doesn't match the ITB labeled on the drawing. - Colbern Road is misspelled as "Colburn" in Line 23 of the legal description. Correct. - Add the total plat acreage to the end of the legal description.
Corrective Action Required
06/01/2017

SIDEWALK. A 5' sidewalk shall be added and labeled along the entire plat frontage of NW Rosemary Court.
Corrective Action Required
06/01/2017

ADDRESSES. The following addresses shall be labeled on their respective lots: - Lot 1 - 1601 NW Blue Pkwy; - Lot 2 - 1641 NW Blue Pkwy; and - Tract A - 1000 NW Rosemary Ct
Corrective Action Required
06/01/2017

EASEMENTS. There are two easements shown with notes stating they are "to be released by separate document". Vacation of public easements, whether dedicated via plat or separate document, require submittal of an application for vacation of easement. The application is taken before both the Planning Commission and City Council for consideration.
Engineering Review Corrections 06/01/2017 06/01/2017
Hector Soto Jr.
Corrective Action Required
06/01/2017

It appears that SDE #2 is no longer required. If not, please vacate the easement.
Corrective Action Required
06/01/2017

Please revise the 10 ft WE along the south plat line to be a 10 ft general utility easement.
Corrective Action Required
06/01/2017

Please revise the 15 ft SWME to be a 15 ft drainage easement. Because the easement isn't adjacent to a plat boundary, please identify it by including lengths and bearings for each side of the easement rather than by a distance from centerline.
Corrective Action Required
06/01/2017

Please clarify the ROW dedication for NW Rosemary Court. Verify the entire 100 ft ROW is dedicated at this time.
Corrective Action Required
06/01/2017

Delete "as shown on the Master Drainage Plan" from the drainage note on Sheet 2.
Planning Review Corrections 06/01/2017 06/01/2017
Hector Soto Jr.
Corrective Action Required
06/01/2017

RIGHT-OF-WAY. Label all right-of-way widths and identify the right-of-way centerlines.
Corrective Action Required
06/01/2017

LINE WEIGHT. Use a heavier line weight to more easily distinguish the interior lot and tract boundaries as property lines.
Corrective Action Required
06/01/2017

PLAT TITLE. Amend the plat title to include the lot numbers and tract so it reads, Summit Village Corporate Park, Lots 1, 2 and Tract A. Reflect this change throughout the plat as necessary.
Engineering Review Corrections 06/01/2017 05/23/2017
Sue Pyles, P.E.
Corrective Action Required
05/23/2017

It appears that SDE #2 is no longer required. If not, please vacate the easement.
Corrective Action Required
05/23/2017

Please revise the 10 ft WE along the south plat line to be a 10 ft general utility easement.
Corrective Action Required
05/23/2017

Please revise the 15 ft SWME to be a 15 ft drainage easement. Because the easement isn't adjacent to a plat boundary, please identify it by including lengths and bearings for each side of the easement rather than by a distance from centerline.
Corrective Action Required
05/23/2017

Please clarify the ROW dedication for NW Rosemary Court. Verify the entire 100 ft ROW is dedicated at this time.
Corrective Action Required
05/23/2017

Delete "as shown on the Master Drainage Plan" from the drainage note on Sheet 2.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Minor Plat fee $600.00 $600.00 Paid 05/17/2017
9110077-Final Plat fee $0.00 $0.00 $0.00 N/A
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
05/17/2017 Letter Routing Sheet - MP
05/17/2017 Letter Routing Sheet - MP
05/17/2017 Receipt Receipt for transaction: 2017-002554
06/01/2017 Letter Routing Sheet
06/27/2017 Letter Applicant Letter - MP (DRCL)
07/12/2017 Drawing Final Plat - Sheet 1
07/12/2017 Drawing Final Plat - Sheet 2
08/16/2017 Plans C401 C_TTL01_63182 - COVER SHEET
08/16/2017 Plans C402 C_GEN01_63182 - GENERAL NOTES
08/16/2017 Plans C403 C_GEN02_63182 - GENERAL LAYOUT
08/16/2017 Plans C404 C_GEO01_63182 - GEOMETRIC PLAN
08/16/2017 Plans C405 C_TYP01_63182 - TYPICAL SECTIONS
08/16/2017 Plans C406 C_GRD01_63182 - GRADING PLAN
08/16/2017 Plans C407 C_RPP01_63182 - ROADWAY PLAN & PROFILE
08/16/2017 Plans C408 C_SPT01_63182 - INTERSECTION DETAILS
08/16/2017 Plans C409 C_SPT02_63182 - INTERSECTION DETAILS
08/16/2017 Plans C410 C_STM01_63182 - STORM SEWER PLAN & PROFILE
08/16/2017 Plans C411 C_STM02_63182 - STORM SEWER PLAN & PROFILE
08/16/2017 Plans C412 C_DRN01_63182 - DRAINAGE PLAN
08/16/2017 Plans C413 C_TAB01_63182 - DRAINAGE TABLES
08/16/2017 Plans C414 C_DTL01_63182 - STORM SEWER DETAILS
08/16/2017 Plans C415 C_DTL01_63182 - STORM SEWER DETAILS 2
08/16/2017 Plans C416 C_DTL01_63182 - SIGN DETAILS
08/16/2017 Plans C417 C_DTL01_63182 - SIGN AND TTC
08/16/2017 Plans C418 C_DTL01_63182 - PVMT MARKING
08/16/2017 Plans C419 C_DTL01_63182 - ADA DETAILS
08/16/2017 Plans C420 C_DTL01_63182 - ADA DETAILS 2
08/16/2017 Plans C502 C_SAN01_63182 - SANITARY SEWER PLAN & PROFILE
08/16/2017 Plans C503 C_DTL01_63182 - SANITARY SEWER DETAIL SHEET
08/16/2017 Plans C504 C_DTL02_63182 - SANITARY SEWER DETAIL SHEET
08/16/2017 Plans C601 C_GEN02_63182 - WATER MAIN GENERAL LAYOUT
08/16/2017 Plans C602 C_WAT01_63182 - WATER MAIN PLAN & PROFILE
08/16/2017 Plans C603 C_DTL01_63182 - WATER MAIN DETAIL SHEET
08/16/2017 Plans C101 C_TTL01_63182 - COVER SHEET
08/16/2017 Plans C102 C_GEN01_63182 - GENERAL NOTES
08/16/2017 Plans C103 C_EXC01_63182 - EXISTING CONDITIONS
08/16/2017 Plans C104 C_GEN02_63182 - GENERAL LAYOUT
08/16/2017 Plans C105 C_SIT01_63182 - SITE PLAN IMPROVEMENTS
08/16/2017 Plans C106 C_GRD01_63182 - GRADING PLAN
08/16/2017 Plans C107 C_SWL01_63182 - SWALE PLAN & PROFILE
08/16/2017 Plans C108 C_SWL01_63182 - SWALE PLAN & PROFILE 2
08/16/2017 Plans C109 C_ERC01_63182 - SITE DISTRUBANCE PLAN - PHASE 1
08/16/2017 Plans C110 C_ERC02_63182 - SITE DISTRUBANCE PLAN - PHASE 2
08/16/2017 Plans C111 C_ERC03_63182 - SITE DISTRUBANCE PLAN - PHASE 3
08/16/2017 Plans C112 C_STM01_63182 - STORM SEWER PLAN & PROFILE
08/16/2017 Plans C113 C_STM01_63182 - DETENTION BASIN PLAN
08/16/2017 Plans C114 C_DRN01_63182 - DRAINAGE PLAN
08/16/2017 Plans C115 C_TAB01_63182 - DRAINAGE TABLES
08/16/2017 Plans C116 C_DTL01_63182 - DETAIL SHEET
08/16/2017 Plans C117 C_DTL02_63182 - DETAIL SHEET
08/16/2017 Plans C118 C_DTL02_63182 - DETAIL SHEET 2
08/16/2017 Plans C119 C_DTL02_63182 - DETAIL SHEET 3
09/05/2019 Blue Pkwy - Colbern
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home