Review Type |
Outcome |
Est. Completion Date |
Completed |
Traffic Review
|
No Comments
|
07/19/2017
|
07/17/2017
|
|
Michael Park
|
|
|
Engineering Review
|
No Comments
|
07/19/2017
|
07/17/2017
|
|
Sue Pyles, P.E.
|
|
|
Traffic Review
|
Corrections
|
06/23/2017
|
06/27/2017
|
|
Michael Park
|
|
Corrective Action Required
The proposed 4" white line along Blue Pkwy shall be high build paint according to City specifications, not thermoplastic.
|
|
Corrective Action Required
The 4" white line along Blue Pkwy should be dimensioned on the plans.
|
|
Corrective Action Required
Include a plan note for pavement marking removal that requires removal procedures that do not scar the pavement.
|
|
|
Engineering Review
|
Corrections
|
06/23/2017
|
06/23/2017
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Sheet C409: Note 6 refers to the detail sheet for ADA ramp details. Please include the sheet number for the details in the note, as well.
|
|
Corrective Action Required
Sheet C409:Revise the intersection details to provide all information required by the Design & Construction Manual Section 5304.8 and Table LS-5.
|
|
Corrective Action Required
Sheet C410: Include the water and storm crossings near Sta. 15+00 in the Profile view to match the Plan view.
|
|
Corrective Action Required
Sheets C418 & C419: Revise the standard details to be project specific.
|
|
Corrective Action Required
Sheet C602: Include the sanitary crossing near 10+20 in the Profile view to match the Plan view.
|
|
Corrective Action Required
Please review all standard details in the plan set. Many details have been recently updated and are available online.
|
|
Corrective Action Required
Sheet C407: Include beginning and ending stations for the pavement marking on NW Blue Parkway.
|
|
Corrective Action Required
The quantities for Subrade Stabilization items and the Fine Grading item should be greater than the Asphalt quantity. The asphalt does not extend as far left and right of centerline as those items. Check and revise quantities in the Estimate of Quantities table on sheet C402 and on the Engineer's Estimate of Probable Construction Costs as needed.
|
|
|
Engineering Review
|
Corrections
|
06/06/2017
|
06/07/2017
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Revise all paving related details so the subgrade design meets the Design and Construction Manual Section 5200 requirements.
|
|
Corrective Action Required
Sheet C409: Revise the intersection details showing the ADA-accessible sidewalk ramps to meet the requirements of the Design and construction Manual Section 5304.8 and Table LS-5. Include project specific standard details in the plans.
|
|
Corrective Action Required
SheetC412: Revise structure labels and drainage area information for clarity. Much of the information is very hard to read.
|
|
|
Traffic Review
|
Corrections
|
06/06/2017
|
06/05/2017
|
|
Michael Park
|
|
Corrective Action Required
Provide pavement marking plans for the southbound left turn lane along Blue Pkwy.
|
|
|
Traffic Review
|
Corrections
|
05/02/2017
|
05/02/2017
|
|
Michael Park
|
|
Corrective Action Required
Refer to FDP comments pertaining to the roadway.
|
|
|
Engineering Review
|
Corrections
|
05/02/2017
|
05/01/2017
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
The water main and sanitary main extensions are short enough to be included in the street & storm plans. Please combine into one set of plans.
|
|
Corrective Action Required
Submit an Engineer’s Estimate of Probable Construction Costs.
|
|
Corrective Action Required
Sanitary Sheet C502: Include an item for Encasement in the “Estimate of Quantitiies” table.
|
|
Corrective Action Required
Sanitary Sheet C504: Revise the Ex MH 1-1 station equation to reference the existing sanitary main in the Profile view.
|
|
Corrective Action Required
Sanitary Sheet C504: Show cardinal directions for the inflow elevations at Ex MH 1-1 in the Profile view.
|
|
Corrective Action Required
Sanitary Sheet C504: The area requiring compacted backfill is shown in with a “See Note” label in the Profile view. There is no note included.
|
|
Corrective Action Required
Sanitary: Add the “Sanitary Pipe Encasement” detail to the plan set.
|
|
Corrective Action Required
Water Sheet C602: Revise the “Summary of Quantities” table to match the information in the plan set.
|
|
Corrective Action Required
Water Sheet C604: Coordinate water main stationing between Plan and Profile views.
|
|
Corrective Action Required
Water Sheet C604: Include the sanitary crossing near Sta 11+10 in the Profile view.
|
|
Corrective Action Required
Water: Include standard details in the plan set.
|
|
|