Summary
PL2017090
The Grove at Lee's Summit LLC - Phase 1A - Sanitary Sewer - On-Site and Off-Site
Engineering Plan Review
Engineering Plan Review
Void
04/21/2017
THE GROVE AT LEES SUMMIT LLC
Locations
Contacts
BHC RHODES, Address:7101 COLLEGE BLVD, SUITE 400, Phone:(816) 898-6607  
THE GROVE AT LEES SUMMIT LLC, Address:2300 MAIN ST STE 900  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Corrections 08/02/2017 08/03/2017
Gene Williams, P.E.
Corrective Action Required
08/03/2017

A final review by Water Utilities revealed that the services for the individual businesses along 16th St. were omitted from the plans. Although the businesses need not be physically connected to sewer, the main should be installed with wyes and service lines to a point beyond the right of way, in accordance with the Design and Construction Manual.
Engineering Review Corrections 06/27/2017 06/29/2017
Gene Williams, P.E.
Corrective Action Required
06/29/2017

Please refer to comment #5 of the previous applicant letter dated May 19, 2017 (hereinafter referred to as "the comment letter"). The intent of this comment was to ask the question, "where are the sanitary sewer laterals for the lots associated with this development?" It appears only one (1) lateral is shown, and this lateral is not serving the new building to be constructed during Phase 1A. The other lots also do not appear to have any laterals. Finally, laterals are shown along the creek, where future development has not been planned. It is for this reason that these laterals should not be installed (i.e., the laterals along the creek). Please concentrate on the laterals to serve The Grove project and its associated lots.
Corrective Action Required
06/29/2017

Please provide a separate sheet showing the locations of the laterals, stationing, elevations, flowlines, slope, etc.
Corrective Action Required
06/29/2017

Please refer to comment #9 of the comment letter. It appears shallow manholes will be utilized for this project, but no detail was provided for a shallow manhole.
Corrective Action Required
06/29/2017

Please label the locations of shallow manholes on the profile view.
Corrective Action Required
06/29/2017

Manhole B-2 on Sheet 5 appears to be two (2) feet below proposed grade?
Engineering Review Corrections 05/19/2017 05/19/2017
Gene Williams, P.E.
Corrective Action Required
05/19/2017

Please add a note stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
Corrective Action Required
05/19/2017

Sheet 2: Ductile iron pipe is required at all stream crossings. This would appear to apply to three (3) separate locations shown on this sheet. Encasement is also required beneath stream crossings. The length of the ductile iron pipe shall extend from manhole to manhole, with restrained joints installed. The concrete encasement should extend a minimum of ten (10) feet behind the bank of the stream. Depth of the sanitary sewer line shall comply with Section 6500 of the Design and Construction Manual.
Corrective Action Required
05/19/2017

All Sheets Pertaining to the Existing Downstream Manhole: Please label the existing manhole on the extreme southern portion of the project as City Manhole No. 46-047.
Corrective Action Required
05/19/2017

Sheet 1: The maximum length between manholes is 500 feet in the City of Lee's Summit. As such, the following geometry change is recommended. Place a manhole on the west side of Decker St. approximately 490 feet south of A11, eliminate manhole A10 at the location shown and move it across the roundabout to the general location of manhole A8, but a few feet to the west of the proposed location of manhole A8. This will allow for a straight runto manhole A6 without an intervening manhole. It will also eliminate the sanitary sewer line beneath the splitter island.
Corrective Action Required
05/19/2017

Are private sanitary sewer laterals going to be installed as part of this project? If so, then please show their location on the plans. Laterals must be connected via a wye connection rather than a tee. Tracer wire and box must also be installed as per the City standard detail.
Corrective Action Required
05/19/2017

Sheet 3: Is there a particular reason that manhole A8 is shown one (1) foot above grade?
Corrective Action Required
05/19/2017

Sheet 4: Manhole A10 appears to be installed within a sump?
Corrective Action Required
05/19/2017

Off site easements shall be required for the portions of the sanitary sewer shown extending beyond the plat boundary. These easements shall be required prior to approval of the plans. The easements shall be in a form acceptable to the City, and shall use the standard template for sanitary sewer easements. This standard template can be requested at any time by the applicant.
Corrective Action Required
05/19/2017

Sheet 7: Please insert the City standard details for manholes, manhole connections, concrete encasement, wye connection and tracer wire connection to the main, frame and lid details (including City of Lee's Summit lettering requirements), and trench and backfill detail. Remove the details on this sheet since they are not correct.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
05/19/2017 Letter PW-Comment Letter (Engineering Plans)
06/29/2017 Letter PW-Comment Letter (Engineering Plans)
08/03/2017 Letter PW-Comment Letter (Engineering Plans)
10/30/2017 Activity Document Fee WorksheetSAN
10/30/2017 Activity Document TheGroveSanitaryMDNRConcurrence
02/09/2021 Letter Expiration Notice (Planning)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home