Planning Application Status

PL2016123




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2016123
Summit Orchard Sanitary Sewer
Engineering Plan Review
Engineering Plan Review
Approved
06/16/2016
TOWNSEND SUMMIT LLC
Locations
Contacts
THHINC MCCLURE ENGINEERING CO, Address:1901 PENNSYLVANIA DRIVE, Phone:(573) 814-1568  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 07/28/2016 07/27/2016
Gene Williams, P.E.
Engineering Review Corrections 07/08/2016 07/07/2016
Gene Williams, P.E.
Corrective Action Required
07/07/2016

Normal alignment of public sanitary sewers would be within the right of way rather than through the project. Is there a reason that the public sanitary sewer cannot be aligned within the Donovan Street right of way? It would appear that all buildings would be serviceable if aligned in this fashion.
Corrective Action Required
07/07/2016

Off-site easements will be required prior to approval of the Final Development Plan. It appears that easements will need to be obtained from Union Pacific Railroad, and the property to the east of Union Pacific Railroad. The property to the east of Union Pacific Railroad would appear to require a 30 foot wide easement, based on the depth.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
07/07/2016 Letter PW-Comment Letter (Engineering Plans)
07/28/2016 Plans C001 - Cover Sheet
07/28/2016 Plans C002 - Standard Notes/Legend
07/28/2016 Plans C400 - Sanitary Overall Plan
07/28/2016 Plans C401 - Sanitary A Plan/Profile
07/28/2016 Plans C402 - Sanitary A Plan/Profile
07/28/2016 Plans C403 - Sanitary B Plan/Profile
07/28/2016 Plans C501 - Details
07/28/2016 Plans C502 - Details
08/30/2016 Letter PW-Engineering Approval Letter
10/31/2017 Activity Document FeeWorksheetSANSummitOrchard
10/31/2017 Activity Document MDNRConcurrence
02/14/2022 Approved Plans Summit Orchard Lot 4 Public Water and Sanitary Record Drawings
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home