Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
11/07/2016
|
12/01/2016
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
Corrections
|
11/07/2016
|
11/07/2016
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Sheet 23A of 34: It appears a grade change in the arch pipe is being proposed without a junction box. Even though this is a private stormwater system, an 87" by 54" arch pipe being constructed in this manner would appear questionable in terms of long-term reliability. How are these pipe sections going to be joined?
|
|
Corrective Action Required
A revised Engineer's Estimate of Probable Construction Costs should be provided.
|
|
|
Traffic Review
|
No Comments
|
11/07/2016
|
11/07/2016
|
|
Michael Park
|
|
|
Fire Review
|
Approved with Conditions
|
11/07/2016
|
11/03/2016
|
|
Jim Eden
|
|
Fire Lanes
Corrective Action Required
IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm).
D105.2 Width.
Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof.
Action required:
A. Approved turf blocks used to complete the 26 foot width of the fire lane shall be installed per manufacturers instructions with documentation of special inspections by an approved third party during installation.
For information only.
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
|
|
|
Planning Review
|
No Comments
|
05/25/2016
|
05/26/2016
|
|
Ron Seyl
|
|
|
Engineering Review
|
Approved with Conditions
|
05/25/2016
|
05/25/2016
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs must be revised to reflect what is being constructed under the Final Development Plan. It was difficult to separate the items shown in the estimate from the items covered under the separate engineering plans. The Engineering Plan Review and Inspection Fee is based on this estimate, and will be calculated following submittal of a revised estimate. The fee must be paid prior to approval of the plans, and prior to obtaining a building permit.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
|
|
DE Contact ROW Inspector
Corrective Action Required
Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
PW Submit Land Disturbance (DELETE)
Corrective Action Required
If ground breaking will take place prior to the issuance of a building permit, please submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
|
Fire Review
|
Approved with Conditions
|
05/25/2016
|
05/24/2016
|
|
Jim Eden
|
|
Fire Lanes
Corrective Action Required
IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm).
D105.2 Width.
Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof.
Action required:
A. Approved turf blocks used to complete the 26 foot width of the fire lane shall be installed per manufacturers instructions with documentation of special inspections by an approved third party during installation.
B. Provide a detail for the cnstruction of the fire lanes with the Geo (turf) blocks.
5/23/20016- Action required: Provide the specifications or a more specific installation detail with the plans submitted for building permit review.
unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm)
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
|
|
|
Traffic Review
|
No Comments
|
05/25/2016
|
05/24/2016
|
|
Michael Park
|
|
|
Fire Review
|
Corrections
|
03/17/2016
|
05/04/2016
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
04/22/2016
|
04/28/2016
|
|
Ron Seyl
|
|
Corrective Action Required
The elevations labeled as "color" were submitted in black and white. Please provide color copies of the elevations, or provide black and white copies with all exterior building material colors labeled.
|
|
|
Traffic Review
|
No Comments
|
04/22/2016
|
04/26/2016
|
|
Michael Park
|
|
|
Engineering Review
|
Corrections
|
04/22/2016
|
04/25/2016
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Water line comments, including private water lines, shall be submitted to the applicant separately.
|
|
Corrective Action Required
Sanitary sewer comments, including the private sanitary sewer, shall be submitted to the applicant separately.
|
|
Corrective Action Required
It did not appear that the two (2) 60" HDPE pipes were called-out as private. It may be better to call-out all of these interior storm lines as private on the profile views. If not, please clearly show that the two (2) 60" HDPE storm lines and end section are private on the plan view.
|
|
Corrective Action Required
Grouted rip rap is not allowed in the City of Lee's Summit. Non-grouted rip rap in accordance with the Design and Construction Manual, along with the dragon's teeth energy dissipation, would appear adequate.
|
|
Corrective Action Required
The Engineer's Estimate of Probable Construction Costs was missing from the submittal package. It is understood that this is being prepared by the applicant.
|
|
|
Fire Review
|
Corrections
|
04/22/2016
|
04/20/2016
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
For information only.
|
|
Fire Lanes - Marking
IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Action required: Signs indicating the outer edges of the Geo block shall also be provided.
|
|
Fire Lanes
Corrective Action Required
IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm).
Action required:
A. Approved turf blocks used to complete the 26 foot width of the fire lane shall be installed per manufacturers instructions with documentation of special inspections by an approved third party during installation.
B. Provide a detail for the cnstruction of the fire lanes with the Geo (turf) blocks.
5/23/20016- Action required: Provide the specifications or a more specific installation detail with the plans submitted for building permit review.
|
|
FDC
IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required: Provide hydrants within 100 feet of all FDC's. Move the FDC to wing B to a more accessible location. Show the location of the FDC and fire main for the north 3-story building Wing A.
|
|
Hydrants
IFC 507.5.1- Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Action required: Provide a hydrant plan that meets this section of the code and IFC Table C105. When possible, hydrants shallbe located on the building side of the fire lane. Contact Prevention at (816) 969-1303 to discuss placement.
|
|
Misc.
There shall be no vertical construction with combustible materials until the fire lanes (base layer of pavement)and hydrants are installed.
|
|
|
Traffic Review
|
Corrections
|
03/17/2016
|
03/21/2016
|
|
Michael Park
|
|
Corrective Action Required
Add a "Cross Street Traffic Does Not Stop" standard sign below the existing stop sign on the northbound appoach to Shamrock at O'Brien. Advise if there's any question to sign detail/dimensions.
|
|
|
Engineering Review
|
Corrections
|
03/17/2016
|
03/17/2016
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Separate engineering plans will be required for the public sanitary sewer. Please add the private line (i.e., sanitary line 2) to the public set, but be sure to clearly label this line as PRIVATE.
|
|
Corrective Action Required
Tapping sleeves are called-out for a portion of the new fire lines. These will need to be specified as cut-in tees, and it may be necessary to perform the work at night. Please make a note of this on the plans.
|
|
Corrective Action Required
Please review the locations of existing valves in relation to the new fire lines. If a valve is greater than 500 feet from a new fire line, a new valve is required to be installed on the main near the tee.
|
|
Corrective Action Required
Sheet 25 of 37: As discussed earlier, separate engineering plans will be required for the public sanitary sewer line. Please include the private sanitary sewer line 2 in this plan set. As-builts will still be required for the private sanitary sewer line 2.
|
|
Corrective Action Required
Please call-out SDR-26 rather than SDR-35 for the sanitary sewer line.
|
|
Corrective Action Required
Separate public water line plans shall be required.
|
|
Corrective Action Required
It appears a portion of the backflow vaults for the fire lines are within easements. These are considered private, and should be located outside the right of way and outside any public easement.
|
|
Corrective Action Required
KCMMB concrete mix (Kansas City Metropolitan Materials Board granite aggregate mix) commercial approaches shall be required at all commercial entrances connected to public right of way. The minimum distance is measured from the joint at the existing pavement to the right of way line. This would include all entrances off of O'Brien Rd., and Moore St. It will be sufficient to provide a note stating "8" thick KCMMB concrete mix".
|
|
Corrective Action Required
Please ensure that retaining walls are outside any public easement or right of way.
|
|
Corrective Action Required
Sheet 11 of 37: The pavement detail shows the old standard for pavement design. The new standard which took effect in 2015 may be better and more cost-effective than the old standard. Please see the Unified Development Ordinance (UDO) Article 12 "Parking" for new pavement and subgrade standards. In general, pavement has been thinned, but subgrade requirements have been increased.
|
|
Corrective Action Required
Sheet 12 of 37: Please change note 6 to read "1.5%" to allow for construction tolerance.
|
|
Corrective Action Required
Please be aware that a separate Land Distrubance Permit from the City will be required for this project. This is in addition to the MDNR Land Disturbance Permit.
|
|
Corrective Action Required
Please be aware that confirmation will need to be obtained that all United States Army Corps of Engineers (USACE) requirements, if any, have been met.
|
|
Corrective Action Required
Landscaping Plan: Please ensure that all trees are a minimum of five (5) feet from any public water or public sanitary sewer line. This distance is measured from the outside of the pipe to the outside of the mature tree trunk. Shrubs and small ornamentals are exempt from this requirement, contingent upon the applicant understanding that the City will not replace these due to future maintenance activities.
|
|
Corrective Action Required
All profile sheets for stormwater: Please indicate the design storm for the hydraulic grade line.
|
|
Corrective Action Required
It is unclear what is being proposed for Line A. In one part of the plans, it states "60" RCB", while other parts show 60" HDPE.
|
|
Corrective Action Required
Sheet 19 of 37: One of the dimensions shows 60" HDPE near the end of pipe. It appears this dimension is shown incorrectly because it appears to be referencing the middle of the two (2) 60" HDPE pipes.
|
|
Corrective Action Required
What are the plans for energy dissipation at the end of Storm Line A?
|
|
Corrective Action Required
Sheet 19 of 37: Existing storm lines and curb inlets are shown near the intersection of Shamrock Ave. (private street) and O'Brien Rd. Will these storm lines and curb inlets remain as-is? Will the storm lines be connected to the new storm system?
|
|
Corrective Action Required
Sheet 24 of 37: It appears the water line is being extended parallel to the new public sanitary sewer. What is the purpose of this extension? It appears to end as a dead end plug.
|
|
Corrective Action Required
Please provide a note stating that all sanitary sewer connections to the public and private sanitary sewer main shall be a cut-in wye connection.
|
|
Corrective Action Required
An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total, plus a $100 per trip fee for the observation and collection of water samples. Items to include in the estimate are: 1) storm lines greater than 6" diameter, 2) stormwater inlets, junction boxes, manholes, curb inlets, grated inlets, wyes, flared end sections, concrete headwall end sections, and other items associated with the stormwater system, 3) sanitary sewer wye connections to the main, 4) water lines greater than 2" diameter, 5) backflow vaults and backflow assemblies, 6) fire hydrant assemblies, 7) valves, tees, fittings, valve boxes, and valve covers, 8) site grading to establish proper drainage, 9) energy dissipation measures, 10) poor subgrade removal and replacement, 11) parking lot grading and compaction, including the area one (1) foot beyond the back of curb, 12) subgrade stabilization or geogrid, including the area one (1) foot beyond the back of curb, 13) aggregate for parking lot, including the area one (1) foot beyond the back of curb, 14) parking lot pavement, 15) KCMMB commercial entrances, 16) sidewalk, 17) ADA-accessible ramps, 18) curb and gutter, 19) fire access paving blocks and base, 20) removal of existing storm lines, 21) erosion and sediment control measures and devices, 22) final restoration, including sodding, seeding, fertilizer, mulch, turf reinforcment mat, and topsoil. Please be aware a separate estimate will be necessary for the public sanitary sewer relocation and private sanitary sewer line plans, as well as the public water line relocation plans.
|
|
|
Planning Review
|
Corrections
|
03/17/2016
|
03/17/2016
|
|
Ron Seyl
|
|
Corrective Action Required
Easements shall be provided for the relocated water and sanitary sewer lines prior to issuance of Certificates of Substantial Completion.
|
|
Corrective Action Required
Portions of the sanitary sewer easements, affected by the conversion from public to private sanitary sewers, shall be vacated prior to the issuance of building permits.
|
|
Corrective Action Required
Portions of the general utility easements, affected by the relocation of water lines, shall be vacated prior to the issuance of building permits.
|
|
Corrective Action Required
Display the location of all gas/oil wells within the subject property. If none exist, please note that fact. Also, please note the source of informations regarding the wells.
|
|
Corrective Action Required
Any retaining or screening wall greater than 4 feet shall be engineered and shall require a separate building permit.
|
|
Corrective Action Required
Sign permits shall be obtained prior to installation of any signs through the Department of Planning and Development. All signs proposed must comply with the sign requirements as outlined in the sign section of the UDO.
|
|
Corrective Action Required
For projects abutting or adjacent to residential properties, a photometric plan providing the as-constructed lighting levels shall be provided to the Department of Planning and Codes Administration prior to the issuance of a Final Certificate of Occupancy. The as-constructed photometric plan shall indicate the footcandle levels on a 10-foot by 10-foot grid.
|
|
Corrective Action Required
Label the materials that will be used for the roofing on all building elevations.
|
|
Corrective Action Required
Provide spec sheets for all proposed mechanical units.
|
|
Corrective Action Required
Will any ground-mounted mechanical units be proposed as part of the project. If so, provide locations and methods of screening. Per the City's development ordinace, ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
|
|
Corrective Action Required
Per Unified Development Ordinance (UDO) requirements, all roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units.
Show dashed line indicating the roof line and rooftop mechanical equipment.
Detail #3 on Sheet A19 shows a parapet section that is called out as being higher than the height of the tallest roof-mounted mechanical unit. Please clarify that this is the proposed method of screening for all roof-mounted equipment on all proposed buildings.
|
|
Corrective Action Required
Label the radii of all adjacent public streets on the Site Plan.
|
|
Corrective Action Required
Label the parking lot and building setbacks from the property lines on the Site Plan.
|
|
Corrective Action Required
On the Site Plan, label the location of the service yard wall that is shown as Detail 4 on Sheet A19.
|
|
Corrective Action Required
Label the location of all proposed monument or freestanding signs on the Site Plan.
|
|
Corrective Action Required
Provide the size and type of material of all proposed monument or freestanding signs.
|
|
Corrective Action Required
Label the proposed width of the proposed sidewalks north of the Commons Building.
|
|
Corrective Action Required
Display the location and limits of the 1% Annual Chance Flood, as set forth on the current FEMA maps with reference to the panel number. If the subject property is located outside the limits, provide a note on the Site Plan indicating this.
|
|
Corrective Action Required
Is the divided entrance/exit to the 33 space parking lot south of the Commons Building proposed to be one-way? If so, one-way traffic aisles must be clearly marked with directional arrows on the pavement at each intersection with another aisle.
|
|
Corrective Action Required
It appears that the accessible ramps extend into the accessible spaces. This does not match the ADA parking stall and ramp detail on page 27. Per the UDO, accessible ramps shall be designed and constructed so as to be integrated into the sidewalk. Ramps shall not be located within or extend into an accessible space, access aisle or any other portion of the parking lot.
|
|
Corrective Action Required
Please relocate the 19' parking space depth notation located on the 33 space parking lot south of the Commons Building so that it does not conflict with the ADA parking space notation on the Site Plan and Dimension Control Plan.
|
|
Corrective Action Required
Accessible parking spaces shall have an adjacent aisle 5 feet wide, and one in every 8 accessible spaces (but no less than one) shall be adjacent to an aisle 8 feet wide and the space shall be clearly marked with a sign indicating that the space is “van accessible.” Please designate one of the ADA designated parking spaces as "van accessible".
|
|
Corrective Action Required
Accessible spaces shall be located at the nearest point to the front building entry and/or accessible ramp. Such spaces separated by a drive aisle shall have clearly discernable cross walks. Include this notation for the ADA designated parking spaces located in the parking lot south of Wing C of the Independent Living Building.
|
|
Corrective Action Required
Provide sufficient dimensions to indicate relationship between buildings, property lines, parking areas and other elements of the project on the plans.
|
|
Corrective Action Required
Provide detail on all proposed lightpoles and lightpole bases. Concrete pedestals/bases shall not exceed three (3) feet in height and shall be included in the maximum overall fixture height.
|
|
Corrective Action Required
Label the location and height of proposed wall-mounted lighting on the building elevations. All wall-mounted fixtures shall be metal halide and not exceed 150-Watts. Also, the mounting height of these fixtures shall not exceed 15 feet measured from the top of the fixture to grade.
|
|
Corrective Action Required
Provide specification sheets for a proposed wall-mounted lighting.
|
|
Corrective Action Required
Provide the wattage levels for all proposed wall and pole-mounted light fixtures.
|
|
Corrective Action Required
In the lighting legend on sheet E1.0, what does OA refer to?
|
|
Corrective Action Required
Provide the specification sheets for fixture PL1 as listed in the lighting legend.
|
|
Corrective Action Required
Are there currently 30' parking lot pole lights on the subject property? Per the City's development ordinance, all light fixtures on properties within or adjoining residential uses and/or districts shall not exceed 15' in height.
However, under the terms of the PMIX development agreement for the subject property, replacement fixtures may exceed the 15' maximum height limitation if they match the height of pole-mounted fixtures currently on-site.
|
|
Corrective Action Required
All pole and wall-mounted lights shall utilize full cut-off fixtures
|
|
Corrective Action Required
On Sheet L2.0, within the landscaping worksheet, the total number of trees required for the NW Moore Street frontage is 9 trees, this requirement has been met. The total number of street trees required for the O’Brien frontage is 21 trees, it appears only 17 street trees are proposed. Please add 4 additional trees to meet the street frontage requirement along O’Brien Street.
|
|
Corrective Action Required
According to Sheet L2.1, additional open yard shrubs are proposed but are not reflected in the Landscape worksheet (Sheet L2.0). Revise the landscape worksheet to reflect the proposed number of shrubs as reflected on the plan.
|
|
Corrective Action Required
The open yard tree requirement has not been met, 73 trees are required. If existing trees are proposed to meet this requirement indicate this in the landscape worksheet, also list the approximate caliper size and species within the landscape worksheet for reference.
|
|
Corrective Action Required
The parking lot screening shrub requirement has not been met. The required number of shrubs for the NW Moore Street frontage is 57 shrubs. The NW O’Brien frontage requirement is 81 shrubs. Revise the landscape sheets accordingly. A combination of hedge, berm or wall that effectively provides a visual screen of the parking lot may also be an option.
|
|
Corrective Action Required
Within the Plant Material List (Sheet L2.0), update the River Birch to reflect a 3” caliper in size and the Autumn Brilliance Serviceberry also needs to be updated to a 3” caliper in size.
|
|
|