PL2015176
3RD STREET SOCIAL
Commercial Final Development Plan
Commercial Final Development Plan
Approved
11/18/2015
3RD STREET RESTAURANT ASSOCIATES LLC
FULL PLAN SETS WERE NOT SUBMITTED UNTIL 11/23/15, THAT DATE WILL SERVE AS THE STARTING POINT FOR REVIEWS. CHRIS HUGHEY 11/23/2015 12:34 PM
Locations
Contacts
DRAW ARCHITECTURE - GRAHAM STILL, Address:214 W 21ST ST. SUITE 200, Phone:(816) 531-8303  
3RD STREET RESTAURANT ASSOCIATES LLC, Address:337 SE CHELSEA LN  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 01/08/2016 01/04/2016
Jim Eden
Code Statement
Corrective Action Required
12/31/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code . See Building Permit Plan Review for comments.
Traffic Review No Comments 01/08/2016 12/31/2015
Ron Seyl
Engineering Review No Comments 01/08/2016 12/31/2015
Ron Seyl
Planning Review No Comments 01/08/2016 12/31/2015
Ron Seyl
Planning Review Corrections 01/05/2016 12/28/2015
Chris Hughey
Corrective Action Required
12/28/2015

Provide an elevation of the trash enclosure screening for staff review. This will need to be approved prior to final development plan approval.
Corrective Action Required
12/28/2015

Provide manufactures specification sheets for all proposed windows and doors. These will need to be approved prior to final development plan approval.
Fire Review Approved with Conditions 01/05/2016 12/28/2015
Chris Hughey
Code Statement
Corrective Action Required
12/28/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code . See Building Permit Plan Review for comments.
Engineering Review No Comments 01/05/2016 12/28/2015
John Barker
Traffic Review No Comments 01/05/2016 12/28/2015
Ron Seyl
Traffic Review No Comments 12/09/2015 12/14/2015
Chris Hughey
Engineering Review Corrections 12/09/2015 12/14/2015
Chris Hughey
Corrective Action Required
12/14/2015

General Site Note 1 - Show locations of demolition in the plan
Corrective Action Required
12/14/2015

Utility Note under Descriptions - Note indicates that the utilities must "...be confirmed by the design professional prior to designing any inprovements..." Did the design professional do that?
Corrective Action Required
12/14/2015

Show and label all easements in the plan. Labels should be consistent with the easement names in the DESCRIPTION.
Corrective Action Required
12/14/2015

Show extents of Lots 1A and 2 that are referenced in the Cross Access and Sanitary Sewer Easements in the Description.
Corrective Action Required
12/14/2015

Show locations of existing storm sewer inlets.
Planning Review Corrections 12/09/2015 12/10/2015
Ron Seyl
Corrective Action Required
12/04/2015

Provide completed Ownership Affidavit Form.
Corrective Action Required
12/04/2015

Please submit a filing fee of $600 (0-5 acres) for the application. No further review by City staff will take place until this is completed.
Corrective Action Required
12/04/2015

Include a north arrow on the plan sheets. The plan shall be oriented so north is to the top or to the right side of the sheet.
Corrective Action Required
12/04/2015

Include a vicinity map with north arrow indicating the location of the property within the City on sheet A100.
Corrective Action Required
12/07/2015

Include the area of land for the project in square feet and acres, and include approximate dimensions of the lot.
Corrective Action Required
12/07/2015

Label the typical dimensions of all parking spaces, accessible spaces, drive aisles and driveways.
Corrective Action Required
12/07/2015

According to Sheet A200, a mural/painted wall sign is being proposed for the western building elevation. In order to clarify the difference between a mural and a painted wall sign per the City's sign ordinance, see the following definintions of each: Mural: A design or representation painted, drawn or sculpted on the exterior surface of a building or other structure. A mural does not identify an occupant of a premise or relate solely to the use, business, establishment, or profession conducted, or to a principal product or service sold, offered, provided, or produced. Painted wall sign: Any sign painted, drawn or sculpted on the exterior surface of a building or other structure depicting any business, service or product. The basic difference between the two is that a painted wall sign promotes the goods or services offered by a particular business (commercial), while a mural does not (non-commercial), and there are differing requirements that need to be met for each according to the ordinance. Will the proposed wall sign/mural be promoting the goods or services offered by the business? As a general note, the City is currently in the process of updating it's development ordinance dealing with murals and painted wall signs. Other signage may be approved by separate application, however the proposed mural/wall sign will not be able to be approved until after the subject ordinances are approved by the Lee's Summit City Council.
Corrective Action Required
12/07/2015

Provide manufactures specification sheets for all proposed windows and doors.
Corrective Action Required
12/07/2015

Provide an elevation of the eastern exterior of the building, and include any proposed modifications that will occur as a result of the proposed project. If no changes to this elevation, please note that.
Corrective Action Required
12/07/2015

Colors of all exteriors including walls, trim, accents, roofs, mechanical equipment, etc., shall be indicated on the final development plan. Provide this information.
Corrective Action Required
12/09/2015

All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Corrective Action Required
12/09/2015

The proposed ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
Corrective Action Required
12/09/2015

Where will the exterior trash enclosure(s) be placed, as I do not see them indicated on the plans? In order to meet UDO requirements, all exterior trash storage containers shall be screened so that they are not visible from off the property. Each trash enclosure shall be constructed of masonry walls with a steel gate painted to be compatible with the color of the masonry walls and building it is to serve.
Corrective Action Required
12/09/2015

A photometric plan shall be required for all new development, redevelopment, parking lot development or expansion where new outdoor lighting is proposed or when otherwise required by the Director. The photometric plan shall be prepared by a lighting professional that is certified by the National Council on Qualifications for the Lighting Professions (NCQLP), or a State licensed professional engineer, architect, landscape architect or land surveyor. Please refer to UDO Section 7.230 for plan requirements.
Corrective Action Required
12/09/2015

Is any new parking lot lighting being proposed? If so, please refer to UDO Section 7.250 for specific parking lot lighting requirments.
Corrective Action Required
12/09/2015

All proposed signage will need to be approved by separate application.
Corrective Action Required
12/09/2015

On Sheet A200, please label the height of the fence around the outdoor patio area. According to the UDO, outdoor patios/decks associated with stand-alone and pad site businesses shall be 4 foot high security fencing around the patio/deck area when no residential adjacent property exists.
Corrective Action Required
12/10/2015

The north ingress/egress has a metal frame bolted to the building and concrete steps that appear to have been installed to provide structural support. Is this going to be left in place or removed as part of the renovation?
Fire Review Approved with Conditions 12/09/2015 12/02/2015
Jim Eden
Code Statement
Corrective Action Required
12/02/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code . See Building Permit Plan Review for comments.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 12/15/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
11/23/2015 Letter Routing Sheet - FDP
12/14/2015 Letter Applicant Letter - FDP (DFDP)
12/15/2015 Receipt Receipt for transaction: 2015-006408
12/18/2015 Letter Resubmittal Routing Sheet - FDP
12/28/2015 Letter Applicant Letter - FDP (DFDP)
12/31/2015 Letter Applicant Letter - FDP (DFDP)
09/09/2019 3rd Street Social
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home