Planning Application Status

PL2015098




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2015098
I-470 Business and Technology Center, Lot 12A
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/30/2015
MARION RIDGE SAFETY STORAGE LLC
Locations
Contacts
MARION RIDGE SAFETY STORAGE LLC, Address:1101 C NW PAMELA BLVD  
WARD DEVELOPMENT & INVESTMENT, Address:1101 C NW PAMELA BLVD, Phone:(816) 918-6416  
HG CONSULT, INC, Address:9007 PINE ST, Phone:(816) 759-2285  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 08/10/2015 08/10/2015
Michael Park
Engineering Review Approved with Conditions 08/10/2015 08/10/2015
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
08/10/2015

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $9,978.56 (which is based on 3% of the total infrastructure cost plus two (2) water test inspection fees) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact Field Eng. Inspector
Corrective Action Required
08/10/2015

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
08/10/2015

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE C&O #12 Cut & Fill
Corrective Action Required
08/10/2015

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE Future Repair Work
Corrective Action Required
08/10/2015

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
08/10/2015

If groundbreaking is planned to take place prior to the issuance of a building permit, submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities.
Corrective Action Required
08/10/2015

The Final Development Plan is amended to include an ADA-accessible ramp on the north side of the new commercial entrance at McBaine Drive.
Corrective Action Required
08/10/2015

The Final Development Plan is amended to exclude a gutter buddy on the curb inlet on Independence Ave., and further amended to exclude the filter basket installation at this location.
Fire Review Approved with Conditions 08/10/2015 08/06/2015
Jim Eden
Code Statement
Corrective Action Required
08/03/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Imposed Loads
Corrective Action Required
08/03/2015

IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Planning Review Approved with Conditions 08/10/2015 08/05/2015
Jennifer Thompson
Corrective Action Required
08/05/2015

FYI--A building permit cannot be issued until the minor plat has been approved, recorded with Jackson County Recorder's office, and an original mylar returned to the City.
Corrective Action Required
08/05/2015

All paving specifications shall meet the Unified Development Ordinance, Article 12, Section 12.120.
Corrective Action Required
08/05/2015

FYI-Sign permits shall be obtained prior to installation of any signs through the Department of Planning and Codes Administration. All proposed signs must comply with the sign requirements of Article 13 of the UDO.
Corrective Action Required
08/10/2015

According to our calculations, one tree is missing from the street tree requirement along NE Independence Ave. Additional revised drawings are not requested, however upon field inspection, staff will be looking for the additional tree.
Planning Review Corrections 07/16/2015 07/16/2015
Jennifer Thompson
Corrective Action Required
07/15/2015

Provide a paving detail for the proposed paved surfaces. Please refer to the Unified Development Ordinance, Article 12, Section 12.120. Also, just to confirm, CG-1 curbing is required for this project. CG-2 curbing was hand-written on the set of review plans, on Sheet 2 in the note section.
Corrective Action Required
07/15/2015

The drive aisle widths where the island bump-outs are located does not meet the minimum 24' (foot) requirement. The islands could be shortened to gain the extra width needed. The current widths range from 19'-23' in width.
Corrective Action Required
07/15/2015

FYI--A Building permit cannot be issued until the minor plat has been approved, recorded with Jackson County Recorder's office, and an original mylar returned to the City.
Corrective Action Required
07/15/2015

Provide a Handicap detail. The note on Sheet 2 referencing the type of sign is correct.
Corrective Action Required
07/15/2015

Label the existing sidewalk (and width) along NE Independence Ave.
Corrective Action Required
07/15/2015

Label the surrounding property information (i.e. zoning, property ownership).
Corrective Action Required
07/15/2015

Indicate the location, size, and type of material to be used in all screening of ground mounted and/or roof mounted mechanical equipment. Also, provide the specification sheets for proposed mechanical equipment to be used to ensure that the proposed screening will adequately screen the proposed equipment. The requirements for screening can be found in the Unified Development Ordinance, Article 7.180. If roof-top equipment is proposed, provide a dashed line indicating the roof line and rooftop mechanical equipment.
Corrective Action Required
07/15/2015

Sign permits shall be obtained prior to installation of any signs through the Department of Planning and Codes Administration. All proposed signs must comply with the sign requirements of Article 13 of the UDO.
Corrective Action Required
07/16/2015

A few revisions are needed for the landscaping calculations. -The length of street frontage for NE McBaine Drive is 661-feet and NE Independence is 574-feet. This requires 22 trees on McBaine and 19 on NE Independence. -Within the Landscape Worksheet on Sheet 7, it indicates 58 trees are provided, however in the Landscape Schedule 55 Crape Myrtle trees are listed. Technically, 62 trees are required to meet street and open yard tree requirements. -In the Landscape worksheet on Sheet 7, it indicates 306 shrubs are proposed for the parking lot screening. This isn't reflected in the Landscape schedule or on the plan, please clarify. Keep in mind a berm could be proposed along the street frontage to lessen the number of shrub requirements. We can discuss in more detail if needed.
Corrective Action Required
07/16/2015

Please provide the manufacturer's specification sheets for proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used.
Corrective Action Required
07/16/2015

On sheet A3.1, indicate the color of the flashing.
Corrective Action Required
07/16/2015

Label the height of the retaining wall. FYI, a building permit is required for retaining walls over 4-foot in height (measured from the bottom of the footing).
Engineering Review Corrections 07/16/2015 07/16/2015
Gene Williams, P.E.
Corrective Action Required
07/16/2015

Sheet 5 of 7: What type of grated trench drain will be used? Please call-out the specific foundry or foundries, along with the specific model number. Please be aware that the grated trench drain will need to be rated for traffic loads.
Corrective Action Required
07/16/2015

Sheet 5 of 7: Please specify that a cut-in tee will be used rather than a tapping sleeve for the fire line.
Corrective Action Required
07/16/2015

Sheet 5 of 7: Water lines 2" in diameter and smaller should be connected to the water main via a threaded connection (i.e., corporation stop), and not a tapping sleeve. Please correct.
Corrective Action Required
07/16/2015

Corrective Action Required
07/16/2015

Sheet 4 of 7: What is the plan for grading around the existing field inlet located on the southwest portion of the site?
Corrective Action Required
07/16/2015

Sheet 5 of 7: It is not clear how the existing curb inlet will be converted into a grated inlet. It would appear a better solution would be to remove and replace the existing curb inlet with a pre-cast structure.
Corrective Action Required
07/16/2015

Please label all interior storm lines and structures as private.
Corrective Action Required
07/16/2015

Sheet 3 of 7: The public curb inlets shown on the west commercial entrance show a permanent "flex storm" or approved equal being installed. Please delete this since this is a public system. All BMP measures installed on the site should be installed within private stormwater structures.
Corrective Action Required
07/16/2015

Please be aware that CG-1 curb will be required within the parking lot. There seemed to be a discrepancy between different copies of the plans.
Corrective Action Required
07/16/2015

Sheet 7 of 7: It appears large trees are shown less than five (5) feet from the existing public sanitary sewer. Please ensure that trees are located a minimum distance of five (5) feet from the sanitary sewer or water lines as measured from the outside of the mature tree trunk to the outside of the pipe.
Corrective Action Required
07/16/2015

Please add a note to the commercial entrances that tactile warning devices shall not be installed at the ADA-accessible ramps. The City only requires these at public intersections.
Corrective Action Required
07/16/2015

Please show the location of the 5 foot sidewalk on McBaine Drive on all sheets. As shown, it appears it is shown only on the dimension plan sheet.
Corrective Action Required
07/16/2015

The ADA-accessible ramp at the intersection of McBaine Drive and Independence Avenue does not appear to comply with City standards. McBaine Drive will ultimately have sidewalks on both sides of the street, and it is not clear how the ramps will be constructed. Please provide a detail showing how the ramp will be constructed at this location.
Corrective Action Required
07/16/2015

It did not appear that a paving plan was presented within the plans. Please be aware that the Unified Development Ordinance (UDO) Article 12 has specific requirements concerning pavement thickness, and subgrade. If a geotechnical report is used to justify a different design than shown in the UDO, then the report should specify that the proposed design is equal to or exceeds the standard design provided in the UDO.
Corrective Action Required
07/16/2015

Please specify KCMMB mix for the commercial approaches, with a minimum thickness of 8". The commercial approaches must be constructed from the edge of existing pavement to the right of way line. Where sidewalks intersect the commercial approach, a maximum cross-slope of 2.00% (i.e., not 2%) must be maintained, with a minimum width of 4.00 feet (i.e., not 4 feet). It is recommended that a range be provided of 1.50% to 2.00% since the City will not accept any cross-slope greater than 2.00%. Please provide notes or a typical section showing this standard.
Corrective Action Required
07/16/2015

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total sitework cost. Items to include in the estimate are: 1) water lines greater than 2" diameter, 2) valve boxes, covers, valves, and fittings, 3) thrust blocks, 4) cut-in tees, 5) sanitary sewer connection to the existiing sanitary sewer line, 6) storm lines greater than 6" in diameter, 7) storm structures, including field inlets, junction boxes, grated inlets, special design inlets, and curb inlets, 8) grading for the site to achieve proposed grades, 9) grading for parking lot, 10) parking lot pavement, 11) subgrade for pavement, including the area one (1) foot behind the back of curb, 12) curb and gutter, 13) sidewalks, 14) ADA-accessible ramps, 15) commercial drive approaches (KCMMB), 16) storm line connections to existing structures, 17) erosion and sediment control, 18) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil.
Traffic Review No Comments 07/16/2015 07/15/2015
Michael Park
Fire Review Approved with Conditions 07/16/2015 07/07/2015
Jim Eden
Code Statement
Corrective Action Required
07/07/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Imposed Loads
Corrective Action Required
07/07/2015

IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 06/30/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
06/30/2015 Receipt Receipt for transaction: 2015-003693
07/01/2015 Letter Routing Sheet - FDP
07/17/2015 Letter Applicant Letter - FDP (DFDP)
08/03/2015 Letter Resubmittal Routing Sheet - FDP
01/14/2017 Letter Applicant Letter - FDP (DFDP)
01/14/2017 Letter Applicant Letter - FDP (DFDP)
11/02/2017 Activity Document Fee Worksheet
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home