Planning Application Status

PL2015086




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2015086
LEE'S SUMMIT HONDA ADDITION
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/05/2015
BFRE LLC
Locations
Contacts
BFRE LLC, Address:3200 S OUTER RD  
DAVIDSON ARCHITECTURE & ENGINEERING - PAUL MILLER, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 07/13/2015 07/14/2015
Hector Soto Jr.
Code Statement
Corrective Action Required
07/06/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Engineering Review No Comments 07/13/2015 07/13/2015
Gene Williams, P.E.
Planning Review No Comments 07/13/2015 07/13/2015
Hector Soto Jr.
Traffic Review No Comments 07/13/2015 07/07/2015
Michael Park
Planning Review Corrections 06/19/2015 06/19/2015
Hector Soto Jr.
Corrective Action Required
06/19/2015

SITE DATA TABLE. Provide a table that provides the following information: zoning (which is CP-2); total site area; total site impervious coverage; building area (broken down by existing, proposed and total); number of parking spaces (existing, number of spaces to be removed and number of remaining spaces).
Corrective Action Required
06/19/2015

LIGHT FIXTURES. - Are any wall-mounted exterior light fixtures proposed for either building addition? If so, show them on the building elevations. All wall-mounted light fixtures shall comply with the requirements of Section 7.260 under Article 7 of the Unified Development Ordinance (UDO). - Submit manufacturer specifications of any exterior light fixtures for review and approval.
Corrective Action Required
06/19/2015

MECHANICAL EQUIPMENT. - Is any new ground- or roof-mounted mechanical equipment proposed for the building additions? If so, show their location on the site plan or building elevations as is appropriate. - Any new roof-mounted equipment shall be screened entirely from view using parapet walls at the same height as the mechanical units. Any new ground-mounted equipment shall be screened entirely from view using evergreen landscaping or masonry walls up to a height of the units being screened. - Show and identify the method of screening for any new mechanical equipment, per above, on the site plan or building elevations as is appropriate.
Corrective Action Required
06/19/2015

ROOF PENETRATIONS. Show all proposed roof penetrations on the building elevations to the extent possible. All roof penetrations shall be placed in architecturally designed appurtenances. Small vent pipes may be painted to blend in with the roof to disguise their appearance.
Corrective Action Required
06/19/2015

BUILDING MATERIALS. The elevations call out the exterior materials as "CMU block w/ EIFS". However, it isn't clear on the drawings how and where the materials will be used. Is it a CMU block base with EIFS body, CMU wall with an EIFS exterior, etc. Please clarify.
Corrective Action Required
06/19/2015

SIGNAGE. The building elevations identify new Honda signage proposed for the north facade. Signage cannot be approved as part of a final development plan. Based on the number of existing signs on the facility, any increase to the number of signs on the building will require Planning Commission approval.
Engineering Review No Comments 06/19/2015 06/17/2015
Gene Williams, P.E.
Fire Review Approved with Conditions 06/19/2015 06/16/2015
Jim Eden
Code Statement
Corrective Action Required
06/16/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Traffic Review No Comments 06/19/2015 06/16/2015
Michael Park
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 06/05/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
06/05/2015 Receipt Receipt for transaction: 2015-002386
06/05/2015 Letter Routing Sheet - FDP
06/19/2015 Letter Applicant Letter - FDP (DFDP)
07/06/2015 Letter Resubmittal Routing Sheet - FDP
07/14/2015 Letter Applicant Letter - FDP (DFDP)
08/27/2015 Fee Worksheet
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: