Summary
PL2014007
Abundant Life Baptist Church Public Street Improvements
Engineering Plan Review
Engineering Plan Review
Approved
01/21/2014
ABUNDANT LIFE BAPTIST CHURCH OF LS MO
Locations
Contacts
Not shown for privacy reasons.
ABUNDANT LIFE BAPTIST CHURCH OF LS MO, Address:414 SW PERSELS  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 03/07/2014 03/06/2014
Gene Williams, P.E.
Engineering Review Corrections 02/11/2014 02/11/2014
Gene Williams, P.E.
Corrective Action Required
02/11/2014

Please add a note stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813."
Corrective Action Required
02/11/2014

Due to questions concerning the drainage between the landscape berm and road, cross-sections will be required from station 78+26 to station 81+36 at 25 foot intervals. The cross-sections should, at a minimum, extend from the edge of existing pavement to 5 feet beyond the right of way.
Corrective Action Required
02/11/2014

The proposed storm inlet at station 79+25 (+/-) appears to be impossible to build without a significant drop-off along several tens of feet along the sidewalk. The Final Development Plan shows a 2 foot drop from the top of the sidewalk to the throat of the east-facing inlet, and this will require a different design than shown on the plans. Please be aware that all earthen grades are limited to 3:1 slope, and this constraint will likely require a significantly different design than shown.
Corrective Action Required
02/11/2014

A grading plan was not shown in the area between the proposed landscape berm and the street. The drainage plan should be of sufficient size to clearly show existing and proposed contours, including any localized sump(s) around proposed inlet(s), and should clearly show the existing and proposed elevations and contour interval. Public Works recommends a separate sheet due to the critical nature of this area.
Corrective Action Required
02/11/2014

An erosion and sediment control plan was absent.
Corrective Action Required
02/11/2014

A traffic control plan was absent.
Corrective Action Required
02/11/2014

A street repair plan for utility work (i.e., domestic water, sanitary sewer, and fire line) was absent from the plans.
Corrective Action Required
02/11/2014

Please label the ADA-accessible ramp with a note stating that truncated domes will not be allowed on the commercial entrance.
Corrective Action Required
02/11/2014

A plan and profile of the new private culvert beneath the driveway will be required.
Corrective Action Required
02/11/2014

The plans call for an extension to the existing 18" CMP pipe with a like material, but it is unclear what the finish slope from the roadway will be. In addition, CMP pipe must be aluminized as per City specifications. Please provide a plan and profile of the extension unless a different design is presented to manage stormwater in the area between the sidewalk and the road.
Corrective Action Required
02/11/2014

The 18" CMP extension proposed on the plans should be re-evaluated since there are questions concerning the ability to achieve proper grading and drainage in this area. It may be necessary to install a field inlet between the sidewalk and the roadway, and providing a junction at the 18" CMP rather than an extension of the CMP.
Corrective Action Required
02/11/2014

The existing slope of the 18" CMP was not called-out. If the plan can accommodate the 18" CMP extension without a change in grade (i.e., the pipe should be extended with a slope equal to the prevailing pipe slope), it would only be allowed if the end of pipe section is in good condition. It will be necessary to evaluate the condition of the end of pipe section to determine whether corrosion has rendered the section unsuitable for the extension. Coupling bands must meet the City specifications.
Corrective Action Required
02/11/2014

Where stormwater structures such as junction boxes, field inlets, curb inlets or the like are shown on the plans, the specific City detail for the structure should be called-out (e.g., FI-1, GI-1, etc.).
Corrective Action Required
02/11/2014

The typical cross-section for the road widening should be changed to reflect the City standards for aggregate base (6" MoDOT Type 5) and subgrade stablization or geogrid installation.
Corrective Action Required
02/11/2014

The Engineer's Estimate of Probable Construction Costs will need to be adjusted based on the final design.
Corrective Action Required
02/11/2014

General comment: The proposed storm drainage system does not appear able to function as intended. Public Works recommends a complete re-design of the system to manage the stormwater within the area bounded by the landscape berm and the street.
Corrective Action Required
02/11/2014

Comment concerning inlet structures within sidewalk: Structures within sidewalk such as inlets and manholes are not allowed when suitable alternatives exist; however, if they are allowed, castings such as frames and lids must be ADA-compliant, and the two (2) sidewalk panels adjacent to the structure must be constructed with a 6" thickened slab over compacted subgrade or aggregate base. If this design is used, please provide appropriate labeling on the plans.
Corrective Action Required
02/11/2014

Please provide a typical section for the sidewalk construction. Please note that welded wire fabric within City sidewalk is not allowed in the City of Lee's Summit.
Corrective Action Required
02/11/2014

Provide a note on the commercial entrance specifying that the ADA-accessible ramp shall extend across the entrance with a width of five (5) feet. This five (5) foot lane should line up with the sidewalk and have a transverse slope of 1.5%.
Corrective Action Required
02/11/2014

The backflow vault shown on the plans does not agree with that shown on the Final Development Plan. It is shown directly adjacent to the sidewalk with no provision for a gate valve to be installed prior to the backflow prevention assembly. Please revise as appropriate.
Traffic Review No Comments 02/11/2014 02/11/2014
Michael Park
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
02/11/2014 Letter PW-Comment Letter (Engineering Plans)
03/10/2014 Letter PW-Engineering Approval Letter
11/17/2017 Activity Document fee worksheet street improvements
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents