Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Approved with Conditions
|
08/20/2013
|
08/22/2013
|
|
Chris Hughey
|
|
See attached PC Letter.
CHRIS HUGHEY 08/22/2013 12:04 PM
|
Engineering Review
|
No Comments
|
08/20/2013
|
08/20/2013
|
|
Gene Williams, P.E.
|
|
|
Traffic Review
|
No Comments
|
08/20/2013
|
08/13/2013
|
|
Michael Park
|
|
|
Fire Review
|
Approved with Conditions
|
08/20/2013
|
08/08/2013
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
|
Traffic Review
|
No Comments
|
07/19/2013
|
07/19/2013
|
|
Chris Hughey
|
|
|
Planning Review
|
Corrections
|
07/19/2013
|
07/19/2013
|
|
Chris Hughey
|
|
Corrective Action Required
Required Plan Sheets. Sheets E2.0, A1.0, and A3.0 are not required to be resubmitted for this Preliminary Development Plan application.
|
|
Corrective Action Required
Required Plan Sheets. The following sheets will be required for the resbummital:
- Photometric Plan, which shall include footcandle calculations based on all exterior wall mounted and pole lights (refer to Article 7 - Division v. of the UDO for reference)
- A preliminary site grading / contour plan.
The Unified Development Ordinance (UDO) is available on the City's website at:
http://cityofls.net/Development/Zoning/Unified-Development-Ordinance.aspx
|
|
Corrective Action Required
Lighting. In addition to the photometric plan please provide all manufacture's specification sheets for all exterior light fixture types.
|
|
Corrective Action Required
Title Page. Please update the drawing index on the title page to reflect the plan sheets that were submitted as part of the Preliminary Development Plan application.
|
|
Corrective Action Required
Site Calculations. Provide the following calculations on the site plan:
- Amount of required and proposed parking spaces based on Article 12 of the UDO
- Floor Area Ratio (FAR)
- Site area in acres or square feet
- Amount of existing impervious surface compared to the amount of proposed impervious surface.
|
|
Corrective Action Required
Landscaping. Show the plant symbols next to the respective plant in the plant/tree schedule or provide notes next to the samples detailing the plant types. In addition, show the proposed plant sizes next to each species. Please note all deciduous trees shall have a minimum caliper of 3 inches, all evergreen trees shall have a minimum height of 8 feet, and all shrubs shall have a minimum height of 18 inches at the time of planting.
|
|
Corrective Action Required
Landscaping. Provide an approximate number of mature trees along the south property line that will remain.
|
|
Corrective Action Required
Curbing. Provide a note or detail on the site plan or other details sheet specifying a parking lot curbing type of CG-1.
|
|
Legal Description
Corrective Action Required
Legal Description. Please add the legal description to the plan set and submit an electronic copy of the legal description. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
|
|
Corrective Action Required
Oil and Gas Wells. Add a note to state whether or not there are active, inactive or capped oil and gas wells located on or adjacent to the site. Reference information can be found in he "Environmental Impact Study of Abandoned Oil and Gas Wells in Lee's Summit, MO" by Edward Mat, PE from the University of Missouri - Rolla. Reference materials from this study has be included for your use.
|
|
Corrective Action Required
North Arrow. Please add a north arrow to sheet C1.0 and any additional site plans that may be resubmitted.
|
|
Corrective Action Required
Rezoning. This site is currently zoned CP-2 (Planned Community Commercial District) and given the proposed site design would be suitable to be zoned CBD (Central Business District). Rezoning the property will not be required. However, staff would like to discuss this concept further at the Applicant's Meeting.
|
|
Corrective Action Required
Downtown Design Standards. In the spring of 2013 the City adopted Downtown Design standards for the core areas of downtown. The following comments pertain to those standards which can be found in Article 7 of the UDO (page 27): http://cityofls.net/Development/Zoning/Unified-Development-Ordinance.aspx
|
|
Corrective Action Required
Awnings. Awnings are encouraged in the downtown core area. However, metal and convex/concave forms are prohibited.
|
|
Corrective Action Required
Material Colors. Provide color samples or notes on Sheets C2.0 and A2.0 regarding the color of the exterior building and trash enclosure materials
|
|
Corrective Action Required
Mechanical / HVAC equipment. Will there be any exterior roof mounted or ground mounted mechanical / HVAC equipment? If so please show them on the site plan. In addition, please note:
- Ground-mounted mechanical equipment and loading/service areas, including trash enclosures, shall be located out of public view whenever feasible and shall not front onto an arterial street. Ground-mounted mechanical equipment shall be located behind the building and screened from public view with fencing or landscaping or both.
- Rooftop mechanical equipment fully screened from view by using parapet walls of the same height as the mechanical units.
|
|
Corrective Action Required
Building Placement. The building should be shifted further north so that the front facade is adjacent to the property line as seen in the downtown core area. Plantings in that area may be shifted elsewhere on site. Further staff highly encourages shifting the placement of the building to the northeast corner of the property lines to "fill in the gap" of structures along the street frontage. The movement of the building to the street corner is not required but highly encouraged. If the building location is to remain as proposed a 3.5 to 4 foot high screening wall of brick to match the building should be placed at the property line east of the building and wrapping around the property corner to fill in the gap left by the proposed building location.
|
|
Corrective Action Required
Accessible (ADA) Parking Space. The provided accessible parking space shall have a minimum 8 foot wide hatched area adjacent to it. Show this hatching on the site plan. In addition the accessible parking space shall utilize the model #R7-8 accessible parking sign. Refer to Article 12 of the UDO.
|
|
Corrective Action Required
Parking Lot Screening. As stated in Article 14 - Landscaping and in the Downtown Design Standards Division of Article 7 in the UDO. Parking lots shall be screened from public right-of-way to a minimum height of 2.5 feet. A decorative brick/masonry wall is recommend for this screening. Alternatively, 12 evergreen shrubs per 40 linear feet (excluding driveways) of street frontage may also be considered.
|
|
|
Engineering Review
|
Corrections
|
07/19/2013
|
07/18/2013
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please note that 1/4 inch per foot for sidewalk cross slope is greater than 2% and will be rejected by Public Works for all public sidewalks. Public sidewalks should be called out as having no more than 1.5% cross slope. This should also be called out for all private sidewalks.
|
|
Corrective Action Required
A cut-in wye connection (i.e., not a saddle or insertatee) will be required for the new sanitary sewer connection. Please call this out on the plan.
|
|
Corrective Action Required
It appears the existing water meter is shown outside of the right of way. Is there an existing easement for the water meter? If not, an easement should be provided since water meters should be within the right of way or a public easement.
|
|
Corrective Action Required
A drainage plan or grading plan should be submitted showing contours for the finished grade and the direction of stormwater flow off the site. While there are spot elevations presented on the Preliminary Development Plan, it is not entirely clear how the site will drain.
|
|
Corrective Action Required
The pavement section shown on the Sheet C1.0 is not in compliance with the Unified Development Ordinance Article 12 "Parking". If asphaltic concrete will be used, then all parking aisles, loading areas and access drives not designated as "fire lanes" must have a minimum of 5 inch asphaltic concrete base overlaid with a minimum of 2 inch asphaltic concrete surface course constructed on a base of either: 1) 12 inches prepared soil, 2) 8 inches aggregate, or 3) 9 inches of fly ash treated soil. For designated fire lanes and delivery/freight truck access areas, all of the above are required with the exception of the asphaltic concrete base which shall be 6 inches rather than 5 inches.
|
|
Corrective Action Required
The locations of all public stormwater, public water lines, and public sanitary sewer lines must be shown on the site plan.
|
|
|
Fire Review
|
Approved with Conditions
|
07/19/2013
|
07/09/2013
|
|
Chris Hughey
|
|
Code Statement
Corrective Action Required
Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
|