Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
06/04/2013
|
06/07/2013
|
|
Chris Hughey
|
|
|
Planning Review
|
Approved with Conditions
|
06/04/2013
|
06/04/2013
|
|
Chris Hughey
|
|
See attached PC letter.
CHRIS HUGHEY 06/04/2013 1:13 PM
|
Traffic Review
|
No Comments
|
06/04/2013
|
06/03/2013
|
|
Michael Park
|
|
|
Fire Review
|
Approved with Conditions
|
06/04/2013
|
05/24/2013
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
Hazardous Materials
Corrective Action Required
Fire Department- A Hazardous Materials Permit will be required for this project. Submit a completed permit application to the Fire Department for review.
The permit application shall include information on fuel storage/ dispensing and explosives storage. A detailed site plan and equipment specifications with product quantities needs to be provided.
To be completed prior to any site work requiring such materials.
|
|
Imposed Loads
Fire Department- IFC 503.2.3 Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
|
|
Misc.
Corrective Action Required
Provide a detailed map of the subterranean area and a Safety Plan for the area of operation.
|
|
|
Engineering Review
|
Corrections
|
05/03/2013
|
05/03/2013
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
The narrative discusses reclamation activities to the west of Sheet SUP2.0. It would appear that the erosion and sediment control plan does not extend to this area.
|
|
Corrective Action Required
What is the plan for the water line conflict near Lowenstein Road?
|
|
Corrective Action Required
A grading plan should be submitted showing how the site will be graded during and after reclamation activities.
|
|
Corrective Action Required
It is unclear what the finish grade will be in relation to Quarry Park Road. There is concern that the proposed operations will affect Quarry Park Road in a negative way.
|
|
Corrective Action Required
Sheets SUP1.0 and SUP2.0 do not really show what is being proposed. SUP2.0 in particular appears to be a land disturbance plan rather than a "Special Use Permit Development Plan" as indicated by the title in the lower right hand corner of the sheet. We would expect to see what is being proposed rather than a vague description contained within the narrative of what will be occurring on this site. Sheet SUP1.0 is entitled "Special Use Permit Area" but does not show in a clear and concise fashion what is being proposed.
|
|
Corrective Action Required
A legend must be provided on each sheet describing each symbol used on the sheets as well as any abbreviations on the sheets.
|
|
Corrective Action Required
What are the plans for Lowenstein Road? The narrative discusses reclamation activities in the first five (5) years extending to Lowenstein Road, then going beyond Lowenstein Road in the subsequent five (5) years. How is the adjacent grade going to be integrated into Lowenstein Road?
|
|
|
Planning Review
|
Corrections
|
05/03/2013
|
05/03/2013
|
|
Chris Hughey
|
|
Corrective Action Required
Provide a site plan delineating areas where the overburden will be piled during the reclamation process.
Additionally, Section 10.410.
D. states "An earthen berms shall be provided that shields all operations from ground level view along all property lines." How will this be addressed?
|
|
Corrective Action Required
On the Site plan sheet SUP 1.0 and SUP 2.0 show and label a 6 foot tall fence around the perimeter of the property pursuant to Section 10.410.C. of the UDO.
|
|
Corrective Action Required
On the site plan delineate the anticipated locations of the rock crusher and weigh station.
|
|
Corrective Action Required
Under Section 10.410.1.c. of the Unified Development Ordinance (UDO) states that open face quarry can only be granted a Special Use Permit for 5 years, and may be renewed after the 5 years. However, a modification can be granted to this time limitation, which staff would support.
|
|
Legal Description
Corrective Action Required
Please submit an electronic copy of the legal descriptions. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
|
|
Corrective Action Required
Please provide documentation of insurance and/or bonding capabilities for restoration of any potential damages to neighboring properties. Refer to Section 10.410.B.7. of the UDO.
|
|
Corrective Action Required
What is the anticipated number of vehicles and dump trucks that will enter and exit the site on a daily basis?
|
|
|
Traffic Review
|
Corrections
|
05/03/2013
|
04/30/2013
|
|
Michael Park
|
|
Corrective Action Required
Discuss some Special Use Permit conditions regarding private maintenance or private ownership of Quarry Park Road and any other roads impacted.
|
|
|
Fire Review
|
Approved with Conditions
|
05/03/2013
|
04/23/2013
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
Hazardous Materials
Corrective Action Required
Fire Department- A Hazardous Materials Permit will be required for this project. Submit a completed permit application to the Fire Department for review.
The permit application shall include information on fuel storage/ dispensing and explosives storage. A detailed site plan and equipment specifications with product quantities needs to be provided.
|
|
Imposed Loads
Corrective Action Required
Fire Department- IFC 503.2.3 Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
|
|
Misc.
Corrective Action Required
Provide a detailed map of the subterranean area and a Safety Plan for the area of operation.
|
|
|