Review Type |
Outcome |
Est. Completion Date |
Completed |
Traffic Review
|
No Comments
|
06/24/2013
|
06/20/2013
|
|
Chris Hughey
|
|
|
Fire Review
|
Approved with Conditions
|
06/24/2013
|
06/20/2013
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
|
Planning Review
|
No Comments
|
06/24/2013
|
06/19/2013
|
|
Chris Hughey
|
|
|
Engineering Review
|
Approved with Conditions
|
06/24/2013
|
06/19/2013
|
|
Gene Williams, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Planning Review
|
Corrections
|
04/23/2013
|
04/24/2013
|
|
Chris Hughey
|
|
Corrective Action Required
Sheet 1. Provide the color and materials of the overhead doors and service door. Please note the overhead doors need to be painted a comparable color to the surrounding facade.
|
|
Corrective Action Required
Site Plan / Grading Study. Will the overhead door on the north side of the building require a driveway connection to the parking lot? If so, please delineate this drive.
|
|
Corrective Action Required
Site Plan / Grading Study. It is our understanding the dashed in parking area will be added at a later date. If this is still correct please add a note to the site plan / grading study stating this.
|
|
Corrective Action Required
Site Plan / Grading Study. Add a north arrow to the site plan / grading study sheet.
|
|
|
Fire Review
|
Approved with Conditions
|
04/23/2013
|
04/23/2013
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
|
Engineering Review
|
Corrections
|
04/23/2013
|
04/23/2013
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
The sheet entitled "Grading Study" dated April 5, 2013 appears to show a drainage system behind the proposed building. Please show a plan view and a profile view of the proposed drainage system.
|
|
Corrective Action Required
Please add a north arrow to the "Grading Study" dated April 5, 2012.
|
|
Corrective Action Required
Will the parking lot shown as a dashed line to the northeast of the new building be constructed during this phase of construction? If not, then please note that this will not be constructed.
|
|
Corrective Action Required
Will the building be sprinklered? If so, then a fire line will need to be designed and installed.
|
|
Corrective Action Required
It appears the building may be too low. For instance, the rear contours show no allowance for freeboard during a storm event, and it would appear that stormwater may enter the building.
|
|
Corrective Action Required
A sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate and calculated as 3% of the total. Items to include on the estimate should include all items necessary to construct the improvements excluding the actual storage building itself. This would include grading activities to achieve proper drainage, drainage structures and pipe, erosion and sediment control, drive and parking lot construction, sanitary sewer, and water lines.
|
|
|
Traffic Review
|
No Comments
|
04/23/2013
|
04/15/2013
|
|
Michael Park
|
|
|