Planning Application Status

PL2011113




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2011113
SAINT LUKES EAST HOSPITAL SURGICENTER ADDITION SHELL
Commercial Final Development Plan
Commercial Final Development Plan
Approved
08/26/2011
SAINT LUKES EAST HOSPITAL
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
ACI BOLAND, Address:11229 NALL, SUITE 140  
SHAFER KLINE & WARREN INC, Address:11250 CORPORATE AVE, Phone:(913) 888-7800  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 10/06/2011 10/06/2011
Gene Williams, P.E.
Fire Review Complete 10/06/2011 10/06/2011
Jim Eden
Code Statement
Corrective Action Required
10/06/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Traffic Review No Comments 10/06/2011 10/06/2011
Michael Park
Planning Review No Comments 09/28/2011 09/29/2011
Hector Soto Jr.
Fire Review Complete 09/28/2011 09/28/2011
Jim Eden
Code Statement
Corrective Action Required
09/28/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Engineering Review No Comments 09/28/2011 09/28/2011
Gene Williams, P.E.
Traffic Review No Comments 09/28/2011 09/28/2011
Michael Park
Engineering Review Corrections 09/12/2011 09/12/2011
Gene Williams, P.E.
Corrective Action Required
09/12/2011

Please add a note to sheet C2.0 which clearly states that the sanitary sewer and the storm sewer are private.
Corrective Action Required
09/12/2011

A sealed Engineer’s Opinion of Probable Construction Costs should accompany your final submittal copies. Public Works’ review and inspection fee is based on that cost. The following items, both materials and installation, should be included in the itemized estimate • Any water line larger than 2” in diameter, valves, hydrants, and backflow preventer with vault, if outside the building • All storm water piping 6” or larger, structures, and detention/retention facilities • All grading for detention/retention ponds • All sanitary sewer manholes and piping between manholes, including private mains • The connection of the building sewer stub to the public main • All public infrastructure, both onsite and offsite • All private street construction, excluding parking lots, drive approaches and sidewalks • All erosion control devices
Corrective Action Required
09/12/2011

Please add a note to Sheet 6.0, Sanitary Sewer profile and Storm Sewer Profiles which clearly states that these lines are private.
Planning Review Corrections 09/12/2011 09/12/2011
Hector Soto Jr.
Planning Correction
Corrective Action Required
09/08/2011

EASEMENT. The northwest corner of the building addition encroaches into a platted 10' utility easement. A vacation of easement application shall be required to be filed and approved by the Planning Commission and City Council prior to approval of this final development plan application.
Planning Correction
Corrective Action Required
09/08/2011

PARKING LOT SIGNAGE. "DO NOT ENTER" signage facing the outer ring road shall be provided at the exit of the one-way parking lot on the east side of the building addition.
Planning Correction
Corrective Action Required
09/08/2011

PARKING LOT. If desired, curb blocks may be used at the head of the parking spaces that abut the sidewalk with no raised curb. However, they may not be used for any spaces which have a raised curb at the head of the space.
Fire Review Complete 09/12/2011 09/12/2011
Jim Eden
Code Statement
Corrective Action Required
09/12/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Traffic Review No Comments 09/12/2011 09/09/2011
Michael Park
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 08/26/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
08/26/2011 Letter Admin Route Sheet FDP
09/13/2011 Letter Applicant Letter (FDP)
09/21/2011 Letter Admin Re-Route FDP
09/28/2011 Letter Approval Letter (Administrative)
09/28/2011 Fee Worksheet.xlsx
09/29/2011 Letter Admin Re-Route FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home