Planning Application Status

PL2010002




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2010002
LA FUENTE MEXICAN RESTAURANT
Commercial Final Development Plan
Commercial Final Development Plan
Approved
11/09/2010
Maple Tree Plaza LLC
Locations
Contacts
Maple Tree Plaza LLC, Address:6333 Long 301  
SCHARHAG ARCHITECTS, Address:310 ARMOUR RD #202, Phone:(816) 221-9297  
HDR/ARCHER, Address:8404 INDIAN HILLS DR, Phone:(816) 347-1100  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 11/24/2010 11/01/2013
Jennifer Thompson
Fire Review Complete 06/20/2011 06/13/2011
Jim Eden
FDC's
Resolved
06/13/2011

Fire Department-A fire hydrant shall be located within 100 feet of the fire department connection (FDC).
Traffic Review No Comments 12/28/2010 01/07/2011
Michael Park
Engineering Review No Comments 12/28/2010 12/29/2010
Tony Reames
APPROVED
Fire Review Complete 12/28/2010 12/21/2010
Jim Eden
Corrective Action Required
12/21/2010

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Corrective Action Required
12/21/2010

Fire Department- The configuration of the FDC on the fire line shall meet the requirements of NFPA 13 and 24. Detail to be reviewed at Permit Review.
Engineering Review Corrections 11/24/2010 12/20/2010
Tony Reames
Corrective Action Required
11/22/2010

Final stormwater report shall include calculations for the 1-, 10-, and 100-year storms.
Corrective Action Required
11/23/2010

Recommend using HDPE pipe under the road.
Corrective Action Required
11/23/2010

The curb inlet near the southwest corner of the parking lot, labeled "by other", is shown as Phase 2 construction for the neighboring project. Additional coordination shall be had to construct this curb inlet needed for this project.
Corrective Action Required
11/23/2010

It is unclear whether the monument sign is located outside the utility easement. Clearly show the extent of the utility easements.
Corrective Action Required
11/23/2010

A sealed Engineer’s Opinion of Probable Construction Costs should accompany your final submittal copies. Public Works’ review and inspection fee is based on that cost. The following items, both materials and installation, should be included in the itemized estimate •Any water line larger than 2” in diameter, valves, hydrants, and backflow preventer with vault, if outside the building •All storm water piping 6” or larger, structures, and detention/retention facilities •All grading for detention/retention ponds •All sanitary sewer manholes and piping between manholes, including private mains •The connection of the building sewer stub to the public main •All public infrastructure, both onsite and offsite •All private street construction, excluding parking lots, drive approaches and sidewalks •All erosion control devices
Traffic Review No Comments 11/24/2010 11/24/2010
Michael Park
Fire Review Corrections 11/24/2010 11/22/2010
Jim Eden
Corrective Action Required
11/22/2010

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Fire Review Corrections 11/24/2010 11/15/2010
Jim Eden
Corrective Action Required
11/15/2010

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Corrective Action Required
11/15/2010

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 11/09/2010
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
11/09/2010 Letter Admin Route Sheet FDP
11/22/2010 Letter PW-Comments Letter
11/23/2010 Letter Applicant Letter (DFDP)
11/23/2010 Letter Applicant Letter (DFDP)
11/23/2010 PL2010-002 FDP LA FUENTA.doc
12/17/2010 Letter Admin Re-Route FDP
12/30/2010 Letter Approval Letter (Administrative)
12/30/2010 PL2010-002 FDP LA FUENTA_2.doc
05/26/2011 Letter Admin Route Sheet FDP
05/31/2011 Letter Approval Letter (Administrative)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home