Summary
PL2019121
SUMMIT AVENUE ADDITION, LOTS 1 & 2
Residential Preliminary Development Plan
Residential Preliminary Development Plan
Approved
03/29/2019
NIE GEORGE H & PEGGY J
Locations
Contacts
NIE GEORGE H & PEGGY J, Address:30 SHOREVIEW DR  
NIE PEGGY J & GEORGE H, Address:30 NE SHOREVIEW DR  
HG CONSULT, INC, Address:9007 PINE ST, Phone:(816) 759-2285  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 08/16/2019 08/15/2019
Michael Park
Fire Review No Comments 08/16/2019 08/15/2019
Jim Eden
Planning Review Approved with Conditions 08/16/2019 08/15/2019
Jennifer Thompson
Engineering Review Approved with Conditions 08/13/2019 08/14/2019
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
08/14/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #02 Master Drainage Plan
Corrective Action Required
08/14/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
08/14/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
08/14/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
08/14/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
08/14/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
08/14/2019

All permanent off-site easements, or temporary construction easements for grading of the downstream swale, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to approval of any Final Development Plan or prior to issuance of any building permit. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
08/14/2019

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
DE C&O #12 Cut & Fill
Corrective Action Required
08/14/2019

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Planning Review Corrections 07/24/2019 07/25/2019
Jennifer Thompson
Corrective Action Required
07/25/2019

Staff is requesting a continuance of this project to a date certain of August 22, 2019. Additional information regarding the site and surrounding neighborhood is needed and revisions to the elevations are being requested.
Corrective Action Required
07/25/2019

Please complete a residential compatibility form for this site and in relationship to the surrounding properties. Staff feels this can help to better understand the context of this proposal and how it fits within the neighborhood. Include approximate heights of the surrounding structures.
Corrective Action Required
07/25/2019

Can the roof pitch be lowered for this structure? The neighboring homes are single story ranch style homes. A lower roof line would be more compatible with the immediate neighboring homes.
Corrective Action Required
07/25/2019

Staff is concerned the duplex too closely resembles a "snout house". Can the front entry area be extended forward to better balance the appearance of the front elevation? Could a pergola or another feature be added to better connect this areas? What is the projection depth of the proposed pillar feature compared to the door area. Can a front porch element be incorporated within the front entry?
Corrective Action Required
07/25/2019

Staff suggests additional detail be added to the side entry doors. Can this have a landing or small porch area or perhaps a roof covering element?
Engineering Review Approved with Conditions 07/24/2019 07/24/2019
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
07/17/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #02 Master Drainage Plan
Corrective Action Required
07/17/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
07/17/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
07/17/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
07/17/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
07/17/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
07/17/2019

All permanent off-site easements, or temporary construction easements for grading of the downstream swale, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to approval of any Final Development Plan or prior to issuance of any building permit. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
07/17/2019

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
DE C&O #12 Cut & Fill
Corrective Action Required
07/17/2019

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Traffic Review No Comments 07/24/2019 07/18/2019
Michael Park
Fire Review No Comments 07/24/2019 07/18/2019
Jim Eden
Planning Review Corrections 07/12/2019 07/01/2019
Sharon Clay
Corrective Action Required
07/12/2019

FYI. A fee for the cost of the sidewalk construction will be required prior to the release of occupancy for any of the units. The sidewalk is referenced as 6-foot on the pdp and 5-foot on the minor plat. Please reconcile. Standard sidewalk width is 5-foot.
Corrective Action Required
07/12/2019

Revise the 15-foot UE reference to 15-feet (not inches).
Corrective Action Required
07/12/2019

Clearly label lot dimensions on the pdp plan.
Corrective Action Required
07/12/2019

On the pdp the site information for the current legal description is missing the reference of Lot 22, please revise. The density seems to be 2.8 not .355?
Corrective Action Required
07/12/2019

Since the request is to seek a modification for the minimum lot width required for a duplex in the RP-2 zoning district. Please provide in narrative form the justification for the request. Staff would suggest accompanied documentation of the surrounding characteristics of the neighborhood, comparable lot widths, housing styles (1 or 2 family?). Staff would also like to know what the approximate building heights are in the surrounding neighborhood.
Corrective Action Required
07/12/2019

Please provide the building height for the proposed duplexes. Staff is aware the elevations indicate the building height, however the UDO's definition of building height is different than how the height has been depicted. Please refer to the UDO, Article 15.
Corrective Action Required
07/12/2019

Staff requests the building elevations incorporate additional exterior building materials (at least on the front elevation). This could be a wainscoting of stone similar to the adjacent homes to the north, or perhaps a front porch or side/back covered patio area? More articulation along the front facade is needed. What are the proposed projection depths of the windows, entry ways and garages? Provide sample colors of the homes, is a color drawing available?
Corrective Action Required
07/12/2019

Currently this item is on the August 8 Planning Commission Schedule, to stay on that schedule please resubmit revised drawings by July 18th.
Corrective Action Required
07/12/2019

Trees proposed within easements shall be required to be of an ornamental variety.
Corrective Action Required
07/12/2019

The square footage isn't accurate that was calculated for the west property line for the low impact buffer. Please revise.
Engineering Review Corrections 07/12/2019 07/01/2019
Sharon Clay
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
07/01/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #02 Master Drainage Plan
Corrective Action Required
07/01/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
07/01/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
07/01/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
07/01/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
07/01/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
07/01/2019

All permanent off-site easements, or temporary construction easements for grading of the downstream swale, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to approval of any Final Development Plan or prior to issuance of any building permit. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
07/01/2019

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
DE C&O #12 Cut & Fill
Corrective Action Required
07/01/2019

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Traffic Review No Comments 06/28/2019 06/27/2019
Michael Park
Fire Review No Comments 06/28/2019 06/25/2019
Jim Eden
Traffic Review Corrections 04/12/2019 04/12/2019
Michael Park
Corrective Action Required
04/12/2019

Sidewalk payment in lieu of construction would be supported considering the area and absence of curbs. Sidewalk as shown adjacent to pavement or curb must be 6' wide, not 5' wide.
Engineering Review Corrections 04/12/2019 04/10/2019
Gene Williams, P.E.
Corrective Action Required
04/12/2019

The upstream drainage area is greater than 2 acres, and a swale currently exists along the rear of the proposed lots. As such, a stormwater study is required to determine what measures and what infrastructure needs to be constructed to support the development. This may include the installation of new storm lines, grading, or a combination thereof. Of particular concern is the duplex that currently exists on Lot 17A, Replat of Lowe's Addition, Lots 15, 16, and 17.
Corrective Action Required
04/12/2019

An engineered channel will not be supported for this new development. it would be too close to the rear of the new structures.
Corrective Action Required
04/12/2019

New grading activities are shown immediately adjacent to Block 2 Lowe's Addition. This grading is not allowed unless an agreement can be obtained from the owner of this property, or if the grading can be altered to direct all diverted stormwater along the new berm, and fully-contained on Lot 1.
Corrective Action Required
04/12/2019

An off-site easment will likely need to be obtained by the applicant to place new stormwater infrastructure (i.e., storm lines, junction boxes, inlets, etc.) across the above-referenced property (i.e., where the duplex is located).
Corrective Action Required
04/12/2019

Since the packet was missing the required stormwater report, the application shall be considered incomplete until such time that the report is submitted, and a concept plan of how the stormwater problem will be managed for the proposed development. This will affect the schedule for placement on the Planning Commission agenda.
Planning Review Corrections 04/12/2019 04/10/2019
Jennifer Thompson
Legal Description
Corrective Action Required
04/09/2019

Please submit an electronic copy of the legal description. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
Corrective Action Required
04/09/2019

Please submit an electronic copy of the site plan.
Corrective Action Required
04/09/2019

Staff suggests the 5' sidewalk not be built at this time as this general area has no curbs and will be identified at a future time to be improved. In lieu of constructing the sidewalk. A fee for the cost of the sidewalk construction will be required prior to the release of occupancy for any of the units.
Corrective Action Required
04/09/2019

Revise the building line (if desired to 20-feet), which is what is allowed in the RP-2 zoning district. Garages are required to meet a 25-foot building line.
Corrective Action Required
04/09/2019

On Lot 2 provide additional dimensions (from the rear of the structure), to the sanitary line. A 15-foot setback is required.
Corrective Action Required
04/09/2019

A low impact buffer is required between Lot 1 and the property to the south. The property to the south is zoned R-1. A medium impact buffer is required between Lot 1 and Lot 2 on the rear of the property line. Please refer to Article 8 of the UDO for specific requirements for the impact buffers.
Corrective Action Required
04/09/2019

Lot widths do not meet the minimum of 80-feet for a duplex in the RP-2 zoning district. Additional discussion is needed to discuss if this should move forward with modifications or if the duplex are revised to a single-family structure.
Corrective Action Required
04/09/2019

Revise the 15-foot UE references to 15-feet not inches.
Corrective Action Required
04/09/2019

A dimension was missing on the front p/l for Lot 2. Please clarify where the two dimensions end/begin.
Corrective Action Required
04/09/2019

In the site information table, update the zoning district to RP-2. Remove the reference to FAR and revise the data to reflect the proposed density for each lot.
Corrective Action Required
04/09/2019

Revise note #1 to reference the density rather than FAR.
Corrective Action Required
04/09/2019

Elevations were not received, submit elevations for the proposed structures, as required by the UDO.
Corrective Action Required
04/09/2019

Provide a vicinity map, with a north arrow.
Fire Review No Comments 04/12/2019 04/03/2019
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
Residential Preliminary Development Plan fee $1,600.00 $1,600.00 Paid 03/29/2019
Legal Notice Publishing Charge $165.00 $165.00 Paid 03/29/2019
Legal Notice Publishing Charge $165.00 $165.00 Paid 03/29/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 08/22/2019 05:00 PM Council Chambers 08/22/2019 05:00 PM
Public Hearing Review
Approved
08/22/2019
City Council Public Hearing 09/17/2019 06:15 PM Council Chambers 09/17/2019 06:15 PM
Public Hearing Review
Approved
09/17/2019
City Council Ordinance 10/01/2019 06:15 PM Council Chambers 10/01/2019 06:15 PM
Public Hearing Review
Approved
10/01/2019
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.