Permit Application Status

PRSUBD20241096


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20241096
Public Infrastructure
Final Acceptance
John Davis
DEVELOPMENT COMPLETE
Public sanitary sewer extension for Lot 10C, Summit Fair as part of the concurrent Minor Plat to subdivide the lot.
03/08/2024
07/08/2024
11/06/2024
Locations
Contacts
Daniel Finn, Address:1270 N. Winchester, Phone:(913) 393-1155  
John Davis, Address:PO Box 299, Phone:(816) 918-1612  
  
Dan Finn, Address:Phelps Engineering, Inc., Phone:(913) 393-1155  
Fleshman Construction Inc, Address:16a Westwoods Drive, Phone:(816) 421-0052  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Record Drawing Review - Sanitary Accepted 10/22/2024 10/22/2024
Susan Nelson, P.E.
Engineering Review - Sanitary No Comments 04/26/2024 04/24/2024
Susan Nelson, P.E.
Engineering Review - Sanitary Corrections 04/18/2024 04/15/2024
Susan Nelson, P.E.
Misc
Corrective Action Required
04/15/2024

Please update the estimate to include the CLSM added to the plans.
Engineer Review - Grading Corrections 04/18/2024 04/15/2024
Susan Nelson, P.E.
Engineer Review - Grading Corrections 03/22/2024 03/22/2024
Susan Nelson, P.E.
Miscellaneous Correction
Corrective Action Required
03/22/2024

Please remove from these plans the water line easement that has been vacated. This easement vacation is shown for reference in the plat but could cause confusion in these development plans. Update all plans with any changes to the sanitary sewer easement in the plat, if necessary.
Engineering Review - Sanitary Corrections 03/22/2024 03/22/2024
Susan Nelson, P.E.
Miscellaneous Correction
Corrective Action Required
03/22/2024

Please remove from these plans the water line easement that has been vacated. This easement vacation is shown for reference in the plat but could cause confusion in these development plans. Update all plans with any changes to the sanitary sewer easement in the plat, if necessary.
Miscellaneous Correction
Corrective Action Required
03/22/2024

Label the existing manhole with the City’s manhole number (22-141) where the sanitary sewer extension begins. Note that that the connection to the existing manhole does not meet the minimum 0.2’ drop requirement, revise as appropriate.
Miscellaneous Correction
Corrective Action Required
03/22/2024

A cut in wye connection must be used for the building sewer stubs, as tees are not permitted. Stubs are not allowed directly from a manhole. Extend the proposed sanitary line and relocate the last manhole so that a cut-in wye connection at least 4’ from the manhole can be utilized for Lot 10F. Show the stub locations in the profile.
Miscellaneous Correction
Corrective Action Required
03/22/2024

Add a note to plans that flowable fill is required around all structures.
Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Insp Fees $1,424.70 $1,424.70 Paid 07/02/2024
Site Grading Fee $67.31 $67.31 Paid 07/02/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer - Air Test Passed 09/30/2024
Misc
Informational
09/30/2024
09/23/24 Monday JMJ (Fleshman Construction) The air system passed from SSMH A2 to A3, A2 to A1, & A1 to Existing.
Sanitary Sewer - Mandrel Passed 09/30/2024
Misc
Informational
09/30/2024
09/23/24 Monday JMJ Mandrel test for all project the sewer main.
Sanitary Sewer - Vacuum Passed 09/30/2024
Misc
Informational
09/30/2024
09/23/24 Monday JMJ ( Fleshman Construction ) Vacuum test passed for SSMH-A1, A2, & ,A3.
Sanitary Sewer Construction Inspection Passed 09/30/2024
Misc
Informational
09/30/2024
08/14/24 Wednesday JMJ (Fleshman Construction) Contractor began the installation of the 8" SDR-26 sanitary main starting from the exist MH that was cored in last week. Approximately 63' of sanitary main was installed today. 08/15/24 Thursday JMJ (Fleshman Construction) Contractor continued the installation of the 8" SDR-26 sanitary main stacking MH A1 and beginning. the construction MH A2. 08/16/24 Friday JMJ (Fleshman Construction) Contractor continued to install approximately 375' of 8" SDR-26 sanitary main. Contractor plans to pour inverts and collars at 1:30PM today for MHs. 08/19/24 Monday JMJ (Fleshman Construction) Contractor plans to use backflow around sanitary MHs (ground stabilization) and stack out the MHs.
Misc
Informational
09/30/2024
08/14/24 Wednesday JMJ (Fleshman Construction) Contractor began the installation of the 8" SDR-26 sanitary main starting from the exist MH that was cored in last week. Approximately 63' of sanitary main was installed today. 08/15/24 Thursday JMJ (Fleshman Construction) Contractor continued the installation of the 8" SDR-26 sanitary main stacking MH A1 and beginning. the construction MH A2. 08/16/24 Friday JMJ (Fleshman Construction) Contractor continued to install approximately 375' of 8" SDR-26 sanitary main. Contractor plans to pour inverts and collars at 1:30PM today for MHs. 08/19/24 Monday JMJ (Fleshman Construction) Contractor plans to use backflow around sanitary MHs (ground stabilization) and stack out the MHs.
Sanitary Sewer - Camera Test Passed 10/30/2024 10/15/2024
Documents & Images
Date Uploaded File Type Document Name
03/08/2024 Plans Civil Plan_Rev 0_PRSUBD20241096
03/14/2024 Engineers Estimate Engineers Estimate of Cost_Rev 0_PRSUBD20241096
04/04/2024 Letter Comment Response Letter_Rev 0_PRSUBD20241096
04/04/2024 Plans Civil Plan_Rev 1_PRSUBD20241096
04/04/2024 Engineers Estimate Engineers Estimate of Cost_Rev 1_PRSUBD20241096
04/18/2024 Letter SUBD Comment Letter
04/18/2024 Engineers Estimate Engineers Estimate of Cost_Rev 2_PRSUBD20241096
04/24/2024 Activity Document PRSUBD20241096 Summit Orchard Sanitary CV Fee Worksheet FY24
07/02/2024 Receipt Receipt for transaction:2024-005440
07/08/2024 Letter SUBD Building Permit
07/09/2024 Approved Plans Approved Summit Fair Lot 10D-10F - Public Sewer
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter SUBD Building Permit
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter DE-Certificate of Substantial Completion Single Lot
10/14/2024 Letter DE-Punch List
10/15/2024 Plans Public Sewer - As-Built_Rev 0_PRSUBD20241096
10/23/2024 Letter INSPECTION SUMMARY
11/05/2024 Accepted Record Drawings Summit Fair Lot 10D-10F - Public Sewer - As-Built Record Drawing
11/06/2024 Bond and Affidavit
11/06/2024 Bond and Affidavit
11/06/2024 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home