Permit Application Status

PRSUBD20221130


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20221130
Public Infrastructure
Final Acceptance
CITY OF LEES SUMMIT
DEVELOPMENT COMPLETE
LOT 9 STREETS OF WEST PRYOR - PUBLIC SANITARY
03/25/2022
03/31/2022
01/24/2023
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/25/2022 03/31/2022
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $604.20 $604.20 Paid 03/25/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Partial 04/04/2022
Misc
Informational
04/04/2022
Tyler’s crew core cut existing manhole A-1 and set manhole A-2. They also laid 155 feet of sanitary pipe. RP 4-4-22
Sanitary - Material Verification Passed 04/04/2022
Misc
Informational
04/04/2022
Wyes and sanitary pipe is SDR 26 material. Talked with Tyler about using MAX Adapters for cutting wyes into the main line. RP 4-4-22
Sanitary Sewer Construction Inspection Partial 4/5/2022 4/5/2022 04/05/2022
Misc
Informational
04/05/2022
Tyler’s crew poured invert for manhole A-2. They also laid all sanitary laterals, clean outs and grease interceptor. RP 4-5-22
Site Visit Partial 04/06/2022
Misc
Informational
04/06/2022
No utility work or grading being done today. RP 4-6-22
Sanitary Sewer Construction Inspection Passed 4/8/2022 4/6/2022 04/08/2022
Misc
Informational
04/08/2022
Tyler’s crew cut into the sanitary main line and set a wye for lot 9A. They used max adapters to attach the wye. They also ran the service lateral to lot 9A. RP 4-8-22
Sanitary Sewer Construction Inspection Passed 04/08/2022
Site Visit Partial 4/7/2022 4/7/2022 05/18/2022
Misc
Informational
04/06/2022
No utility work or grading being done today. RP 4-6-22 Electrical contractors an building pad contractors working. 5/17/22 ES
Site Visit Partial 5/27/2022 05/27/2022
Misc
Informational
05/18/2022
No utility work or grading being done today. RP 4-6-22 Electrical contractors an building pad contractors working. 5/17/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES
Site Visit Partial 05/31/2022
Misc
Informational
05/27/2022
No utility work or grading being done today. RP 4-6-22 Electrical contractors an building pad contractors working. 5/17/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES Not able to perform sanitary testing today as too wet with rainfall. 5/31/22 ES
Sanitary Sewer - Mandrel Passed 5/31/2022 6/6/2022 06/06/2022
Misc
Informational
06/06/2022
Jeremiah performed mandrel testing with a 7.37” plate. Mandrel passed through section without issue. 6/4/22 ES
Sanitary Sewer - Air Test Passed 5/31/2022 6/6/2022 06/06/2022
Misc
Informational
06/06/2022
Jeremiah performed air test on line A, line passed test without dropping pressure. 6/6/22 ES
Sanitary Sewer - Vacuum Passed 5/31/2022 6/6/2022 06/06/2022
Misc
Informational
06/06/2022
Jeremiah performed vacuum test on MH A-2, manhole passed. 6/6/22 ES
Site Visit Partial 06/06/2022
Misc
Informational
05/31/2022
No utility work or grading being done today. RP 4-6-22 Electrical contractors an building pad contractors working. 5/17/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES Not able to perform sanitary testing today as too wet with rainfall. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES
Grading/Excavation/Fill Inspection Partial 06/06/2022
Misc
Informational
06/06/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES
Site Visit Partial 06/06/2022
Misc
Informational
06/06/2022
No utility work or grading being done today. RP 4-6-22 Electrical contractors an building pad contractors working. 5/17/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES Not able to perform sanitary testing today as too wet with rainfall. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES
Sanitary Sewer - Camera Test Partial 6/3/2022 06/07/2022
Misc
Informational
06/07/2022
Email sent to water to get this section camera’d. 6/7/22 ES
Site Visit Partial 06/16/2022
Misc
Informational
06/06/2022
No utility work or grading being done today. RP 4-6-22 Electrical contractors an building pad contractors working. 5/17/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES Not able to perform sanitary testing today as too wet with rainfall. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES Water was onsite today performing camera testing. 6/16/22 ES
Sanitary Sewer - Camera Test Partial 7/7/2022 06/16/2022
Misc
Informational
06/16/2022
Water was onsite today performing camera testing. 6/16/22 ES
Sanitary Sewer - Camera Test Partial 7/18/2022 06/20/2022
Misc
Informational
06/16/2022
Water was onsite today performing camera testing. 6/16/22 ES Water on site finishing sewer bond inspections. 6/17/22 ES
Site Visit Partial 06/20/2022
Misc
Informational
06/16/2022
No utility work or grading being done today. RP 4-6-22 Electrical contractors an building pad contractors working. 5/17/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES Not able to perform sanitary testing today as too wet with rainfall. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES Water was onsite today performing camera testing. 6/16/22 ES Water onsite finishing bond inspection. 6/17/22 ES
Sanitary Sewer - Camera Test Passed 7/20/2022 08/01/2022
Misc
Informational
06/20/2022
Water was onsite today performing camera testing. 6/16/22 ES Water on site finishing sewer bond inspections. 6/17/22 ES ESS fixed invert issue. Spoke with Matt, water approved of Sanitary Sewers. 8/1/22 ES
Grading/Excavation/Fill Inspection Passed 08/25/2022
Misc
Informational
06/06/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES All grading/fill for this permit completed. 8/25/22 ES
Record Drawing Review Passed 9/22/2022 09/27/2022
Misc
Informational
09/27/2022
Looked at record drawings. They appeared to be accurate to what was installed and put into the ground for public utilities. 9/16/22 ES
Documents & Images
Date Uploaded File Type Document Name
03/25/2022 Receipt Receipt for transaction:2022-001663
03/31/2022 Approved Plans Streets of West Pryor Lot 9 Sanitary Approved 3.31.22
03/31/2022 Letter DE-Permit
04/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Wye cut into main with max adapters
05/18/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter DE-Certificate of Substantial Completion Single Lot
08/26/2022 Letter DE-Punch List
08/26/2022 Streets of West Pryor Lot 9 Public Sanitary Sewer Substantial Completion
08/26/2022 Streets of West Pryor Lot 9 Public Sanitary Sewer Punch List
09/01/2022 Streets of West Pryor Lot 9 Public Sanitary Sewer Substantial Completion
09/13/2022 Sanitary Sewer Easement - SWP Lot 9 [2022E0044731] [RECORDED 05-10-2022]
09/15/2022 Streets of W Pryor Lot 9 - Public Sanitary Sewer Record Drawings (as-builts) 9_14_22
09/27/2022 Letter INSPECTION SUMMARY
10/31/2022 MAINTENANCE BOND - SOWP Lot 9 - Public Sanitary Sewer 9.1.22
10/31/2022 SOWP Lot 9 Affidavit 9.1.22
01/24/2023 Letter DE-Certificate of Final Acceptance (Commercial)
01/24/2023 Streets of West Pryor Lot 9 Public Sanitary Sewer Final Acceptance
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home