Permit Application Status

PRSUBD20192844


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20192844
Public Infrastructure
Final Acceptance
DEVELOPMENT COMPLETE
EXTENSION OF PUBLIC WATER MAIN
10/02/2019
10/26/2019
11/17/2022
Locations
Contacts
LITTLE DIXIE CONSTRUCTION LLC, Address:1431 CINNAMON HILL LN STE 209, Phone:(573) 449-7200  
KENZIE THORP, Address:LITTLE DIXIE CONSTRUCTION, Phone:(573) 864-4533  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/02/2019 10/02/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $699.00 $699.00 Paid 10/16/2019
9110072-Water Test Fee $200.00 $200.00 Paid 10/16/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Construction Inspection Partial 11/26/2019
Misc
Informational
11/25/2019
Misc
Informational
11/26/2019
Contractor caused a blow on water line while working on proposed water line 11/25/19 . Line was able to be isolated without putting customers out of water 3 Hydrants and two valves are out of service. Reactivate is set for approximately at 12:00 PM 11/26/19. Contractor continued to install 6” waterline .
Corrective Action Required
12/24/2019
12/18/20 Lee's Summit water service while tapping the water line the notice contractor had accicentally cut water services to their domestic line service. The contractor (ESS) would have to rechlorinate the line and take 2 more sample for Ecoli and Coliform.The line was rechlorinated on 12/20/20 and dechlorinated on 12/23/20.
Water Line - Fire Hydrant Passed 11/26/2019
Misc
Informational
11/25/2019
Misc
Informational
11/26/2019
Contractor relocated fire hydrant @ Sta 0+08 for water Line A 11/26/19.
Water Line - Construction Inspection Partial 11/27/2019
Informational
11/27/2019
6" C-900 water Line A was completely installed, next week testing of Line will begin. Thurst blocks were poured behind bends & tees and bolts for Mega lugs & restraints were sprayed with black epoxy. 11/27/19
Fire Line Construction Inspection Partial 12/05/2019
Informational
12/05/2019
Contractor began installation of backflow preventor box and components on 12/3/19.
Backflow Preventer and Vault Partial 12/05/2019
Misc
Informational
12/05/2019
Contractor began installation of Backflow preventer and Vault on 12/3/19.
Water Line - Construction Inspection Passed 12/05/2019
Informational
12/05/2019
Contractor domestic water main passed inspection 150psi for 2hrs. 10:20 am to 12:20 pm 12/5/19
Misc
Informational
12/07/2019
Domestic portion of water main was Chlorinated on 12/5/19 and Dechlorinated on 12/6/19.
Water Line - Hydrostatic Test Passed 12/5/2019 12/24/2019
Informational
12/24/2019
Hdrostatic test passed 2hr test for domestic line at 150psi.
Fire Line Construction Inspection Partial 01/02/2020
Misc
Informational
01/02/2020
Contractor installed water as per plan.
Site Visit Partial 04/24/2020
Misc
Informational
04/24/2020
No work due to rain conditions. 4/24/20
Record Drawing Review Passed 11/18/2022 11/17/2022
Water Line - Coliform Test 1 Passed 11/17/2022
Documents & Images
Date Uploaded File Type Document Name
10/16/2019 Receipt Receipt for transaction: 2019-006826
10/25/2019 Letter DE-Permit
10/26/2019 DE-Permit Subdivision Water Signed
11/27/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/07/2019 Letter INSPECTION SUMMARY
12/24/2019 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter DE-Permit
09/04/2020 Letter DE-Certificate of Substantial Completion Multiple Lot
09/04/2020 Letter DE-Punch List
11/10/2022 Plans 190164 Public Water Plans_As-Built
11/11/2022 Plans 190164 Public Water Plans_As-Built
11/17/2022 K.C. Surgical Maintenance Bond
11/17/2022 K.C. Surgical Final Affidavit and Agreement
11/17/2022 Letter DE-Certificate of Final Acceptance (Commercial)
11/17/2022 K.C. Surgical Water Main Extension Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: