Permit Application Status

PRSUBD20180642


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20180642
Public Infrastructure
Voided
M-III LONGVIEW LLC
DEVELOPMENT COMPLETE
03/14/2018
03/19/2018
11/22/2019
Locations
Contacts
SUPERIOR BOWEN CONST LLC, Address:520 W PENNWAY ST STE 300, Phone:(816) 921-8200  
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
PATRICK BURNS (SUPERIOR BOWEN CONST), Phone:(816) 506-2770  
SITE RITE CONSTRUCTON CO, Address:1601 BELLEFONTAINE AVE, Phone:(816) 561-4890  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/14/2018 03/19/2018
Tom Chandler
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $3,997.47 $3,997.47 Paid 03/14/2018
91100C9-Water Insp Fee $3,902.18 $3,902.18 Paid 03/14/2018
9110072-Water Test Fee $400.00 $400.00 Paid 03/14/2018
9110068-Storm Sewer Inspection Fee $6,493.98 $6,493.98 Paid 03/14/2018
9110081-Paved Surface Inspection Fee $9,383.61 $9,383.61 Paid 03/14/2018
9110071-Site Grading Fee $2,997.23 $2,997.23 Paid 03/14/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 3/22/2018 at 9:30 AM 03/22/2018
PW-Misc
Informational
03/22/2018
Tom Chandler 03/22/2018 9:47 AM Began clearing some of the underbrush with bobcat and chipper. Will leave the mulchings as an ESC divice and install silt fence in the next couple of days as well.
Erosion Control Inspection Partial 3/23/2018 at 9:00 AM 03/23/2018
PW-Misc
Informational
03/22/2018
Tom Chandler 03/22/2018 9:47 AM Began clearing some of the underbrush with bobcat and chipper. Will leave the mulchings as an ESC divice and install silt fence in the next couple of days as well.
PW-Misc
Informational
03/23/2018
Tom Chandler 03/23/2018 9:14 AM Mulching of the underbrush has been completed. Will install ESC devices according to plans in next couple of days prior to any construction.
Erosion Control Inspection Partial 3/26/2018 at 9:00 AM 03/27/2018
PW-Misc
Informational
03/23/2018
Tom Chandler 03/22/2018 9:47 AM Began clearing some of the underbrush with bobcat and chipper. Will leave the mulchings as an ESC divice and install silt fence in the next couple of days as well.
PW-Misc
Informational
03/23/2018
Tom Chandler 03/23/2018 9:14 AM Mulching of the underbrush has been completed. Will install ESC devices according to plans in next couple of days prior to any construction.
PW-Misc
Informational
03/27/2018
Mulching of underbrush in place until silt fence and other ESC devices can be installed is working to maintain erosion control.
Erosion Control Inspection Partial 3/29/2018 at 3:00 PM 03/29/2018
PW-Misc
Informational
03/27/2018
Tom Chandler 03/22/2018 9:47 AM Began clearing some of the underbrush with bobcat and chipper. Will leave the mulchings as an ESC divice and install silt fence in the next couple of days as well.
PW-Misc
Informational
03/27/2018
Tom Chandler 03/23/2018 9:14 AM Mulching of the underbrush has been completed. Will install ESC devices according to plans in next couple of days prior to any construction.
PW-Misc
Informational
03/27/2018
Mulching of underbrush in place until silt fence and other ESC devices can be installed is working to maintain erosion control.
PW-Misc
Informational
03/29/2018
Tom Chandler 03/29/2018 3:49 PM Installed silt fence along the lower level along the lake. Will add mulch berms as well.
Site Visit Partial 3/30/2018 at 10:28 AM 03/30/2018
PW-Misc
Informational
03/30/2018
Matt Munger 03/30/2018 10:38 AM No activity on site, silt fence has been installed along the perimeter around the lake.
Site Visit Complete 4/2/2018 at 8:30 AM 04/02/2018
PW-Misc
Informational
03/30/2018
Matt Munger 03/30/2018 10:38 AM No activity on site, silt fence has been installed along the perimeter around the lake.
Informational
04/02/2018
Tom Chandler 04/02/2018 10:36 AM No work going on today. ESC devices have been installed and in good condition.
Site Visit Complete 4/10/2018 at 1:15 PM 04/10/2018
Informational
04/10/2018
Tom Chandler 04/10/2018 1:52 PM Contractor grinding brush from phase 2 of grading limits.
Site Visit Complete 4/11/2018 at 9:00 AM 04/11/2018
PW-Misc
Informational
04/11/2018
Tom Chandler 04/11/2018 10:02 AM Contractor is grinding brush on-site for phase 2 of the grading plan. ESC devices are installed and maintained.
Erosion Control Inspection Partial 4/16/2018 at 9:00 AM 04/16/2018
PW-Misc
Informational
03/29/2018
Tom Chandler 03/22/2018 9:47 AM Began clearing some of the underbrush with bobcat and chipper. Will leave the mulchings as an ESC divice and install silt fence in the next couple of days as well.
PW-Misc
Informational
03/29/2018
Tom Chandler 03/23/2018 9:14 AM Mulching of the underbrush has been completed. Will install ESC devices according to plans in next couple of days prior to any construction.
PW-Misc
Informational
03/29/2018
Mulching of underbrush in place until silt fence and other ESC devices can be installed is working to maintain erosion control.
PW-Misc
Informational
03/29/2018
Tom Chandler 03/29/2018 3:49 PM Installed silt fence along the lower level along the lake. Will add mulch berms as well.
PW-Misc
Corrective Action Required
04/16/2018
Tom Chandler 04/16/2018 9:10 AM Fiinished grinding on Friday 4/13/2018. Installed mulch berms along the shore line to help with other ESC devices as well.
Erosion Control Inspection Partial 4/20/2018 at 9:00 AM 04/20/2018
PW-Misc
Informational
04/16/2018
Tom Chandler 03/22/2018 9:47 AM Began clearing some of the underbrush with bobcat and chipper. Will leave the mulchings as an ESC divice and install silt fence in the next couple of days as well.
PW-Misc
Informational
04/16/2018
Tom Chandler 03/23/2018 9:14 AM Mulching of the underbrush has been completed. Will install ESC devices according to plans in next couple of days prior to any construction.
PW-Misc
Informational
04/16/2018
Mulching of underbrush in place until silt fence and other ESC devices can be installed is working to maintain erosion control.
PW-Misc
Informational
04/16/2018
Tom Chandler 03/29/2018 3:49 PM Installed silt fence along the lower level along the lake. Will add mulch berms as well.
PW-Misc
Resolved
04/20/2018
Tom Chandler 04/16/2018 9:10 AM Fiinished grinding on Friday 4/13/2018. Installed mulch berms along the shore line to help with other ESC devices as well.
Informational
04/20/2018
Tom Chandler 04/20/2018 9:06 AM Clearing and grubbing have been completed. All ESC devices have been installed and are in good shape. Will seed and stabilize areas disturb during construction soon.
Erosion Control Inspection Passed 4/23/2018 at 8:45 AM 04/23/2018
PW-Misc
Informational
04/20/2018
Tom Chandler 03/22/2018 9:47 AM Began clearing some of the underbrush with bobcat and chipper. Will leave the mulchings as an ESC divice and install silt fence in the next couple of days as well.
PW-Misc
Informational
04/20/2018
Tom Chandler 03/23/2018 9:14 AM Mulching of the underbrush has been completed. Will install ESC devices according to plans in next couple of days prior to any construction.
PW-Misc
Informational
04/20/2018
Mulching of underbrush in place until silt fence and other ESC devices can be installed is working to maintain erosion control.
PW-Misc
Informational
04/23/2018
Tom Chandler 04/23/2018 9:42 AM No work going on today. All ESC devices are installed and functioning properly. Contractor will seed and stabilize within the next 2 weeks as well.
Erosion Control Inspection Partial 4/26/2018 at 8:30 AM 04/26/2018
PW-Misc
Informational
04/26/2018
Tom Chandler 04/26/2018 8:31 AM ESC devices installed and functioning properly. No work on-site. Review of comments and concerns about wetland area being done by Kent Monter at this time as well.
Documents & Images
Date Uploaded File Type Document Name
03/14/2018 Receipt Receipt for transaction: 2018-000954
03/19/2018 Letter DE-Permit
03/19/2018 DOC031918-03192018153529
03/23/2018 Letter DE-Daily Inspection Summary
03/27/2018 Letter DE-Daily Inspection Summary
03/27/2018 IMG_1924
03/27/2018 IMG_1925
03/29/2018 Letter DE-Daily Inspection Summary
03/30/2018 Letter DE-Daily Inspection Summary
04/02/2018 Letter DE-Daily Inspection Summary
04/03/2018 Letter DE-Daily Inspection Summary
04/04/2018 Letter DE-Daily Inspection Summary
04/11/2018 Letter DE-Daily Inspection Summary
04/16/2018 Letter DE-Daily Inspection Summary
04/20/2018 Letter DE-Daily Inspection Summary
04/23/2018 Letter DE-Daily Inspection Summary
04/26/2018 Letter DE-Daily Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home