Permit Application Status

PRSITE20231450


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20231450
Development - Site
Final Completion
DEVELOPMENT COMPLETE
Site Permit - Sanitary Sewer, Water, Storm and Site.
04/05/2023
12/20/2023
11/22/2024
Locations
Contacts
READE ELECTRIC LLC, Address:PO BOX 1117 , Phone:(816) 889-8388  
NICK READE, Address:1304 SILHOUETTE DR, Phone:(816) 889-8388  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/03/2023 10/20/2023
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $226.50 $226.50 Paid 12/11/2023
91100C9-Water Insp Fee $536.25 $536.25 Paid 12/11/2023
9110068-Storm Fee $949.80 $949.80 Paid 12/11/2023
9110081-Paved Surface Inspection Fee $5,127.60 $5,127.60 Paid 12/11/2023
9110071-Site Grading Fee $732.30 $732.30 Paid 12/11/2023
8350015-Water Meter Fee $5,287.10 $5,287.10 Paid 12/11/2023
8331401-Water Tap Fee $45,130.00 $45,130.00 Paid 12/11/2023
8331507-Sanitary Sewer Development Fee $18,166.00 $18,166.00 Paid 12/11/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 3/22/2024 3/22/2024 03/22/2024
Misc
Informational
03/22/2024
All pervious reports where placed on PRCOM20231450 JMJ Erosion control is still maintaining, but appears need regular maintenance to ensure it stays securely in the ground.
Erosion Control Inspection Partial 3/27/2024 3/27/2024 03/27/2024
Misc
Informational
03/22/2024
03/22/24 JMJ All pervious reports where placed on PRCOM20231450 JMJ Erosion control is still maintaining, but appears need regular maintenance to ensure it stays securely in the ground. 03/27/24 JMJ Erosion still needs some maintenance but appears to be functionable.
Pavement-Curb Construction Partial 03/29/2024
Misc
Informational
03/29/2024
03/29/24 Friday JMJ Contractor proof rolled the Eastside along the building structure and the North end of project. Proof roll passed inspector verified truck ticket for weight. The rest of the project will proof roll at a later date.
Pavement-Stabilized Subgrade Partial 4/1/2024 4/1/2024 04/01/2024
Misc
Informational
04/01/2024
04/01/24 Monday JMJ Contractor continued to installed gravel for the curbs, driveway, and parking lots.
Pavement-Curb Construction Partial 4/4/2024 4/4/2024 04/04/2024
Misc
Informational
04/04/2024
04/04/24 Thursday JMJ Contractor constructed forms for curbs on sections were proof rolls were performed and passed last week.
Misc
Informational
04/04/2024
Pavement-Curb Construction Partial 4/9/2024 4/9/2024 04/09/2024
Misc
Informational
04/09/2024
04/09/28 Tuesday JMJ Curb on the Westside of the building and one side of the curb through the drive-through were poured last week. Contractor set more curb forms for future pour.
Pavement-Curb Construction Partial 4/10/2024 4/10/2024 04/10/2024
Misc
Informational
04/10/2024
04/10/24 Wednesday JMJ Contractor continued to install forms and plans to pour concrete around 2:30PM. Talked with contractor about the use of white cure.
Pavement-Curb Construction Partial 4/11/2024 4/11/2024 04/11/2024
Misc
Informational
04/09/2024
03/29/24 Friday JMJ Contractor proof rolled the Eastside along the building structure and the North end of project. Proof roll passed inspector verified truck ticket for weight. The rest of the project will proof roll at a later date. 04/04/24 Thursday JMJ Contractor constructed forms for curbs on sections were proof rolls were performed and passed last week. 04/09/28 Tuesday JMJ Curb on the Westside of the building and one side of the curb through the drive-through were poured last week. Contractor set more curb forms for future pour. 04/10/24 Wednesday JMJ Contractor continued to install forms and plans to pour concrete around 2:30PM. Talked with contractor about the use of white cure. 04/11/24 Thursday JMJ Contractor pulled forms from curbs. The backside of curbs need to be patch.
Pavement-Proof Roll Passed 4/11/2024 4/11/2024 04/11/2024
Misc
Informational
04/11/2024
04/11/24 Thursday JMJ Contractor passed pavement proof roll.
Site Visit Partial 4/12/2024 4/12/2024 04/12/2024
Misc
Informational
04/12/2024
04/12/24 Friday JMJ No work on site today.
Site Visit Partial 4/16/2024 4/16/2024 04/16/2024
Misc
Informational
04/12/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. Contractor came later after the passing of inclement weather and set forms and materials for parking lot concrete pour on 04/17/24.
Pavement-Aggregate Base Partial 4/17/2024 4/17/2024 04/17/2024
Misc
Informational
04/17/2024
04/17/24 Wednesday JMJ Contractor poured approximately 40 yards of concrete for the parking lot @ the Southwest side of project and will come back @ 1:00PM today and pour another 30 yards.
Erosion Control Inspection Partial 4/18/2024 4/18/2024 04/18/2024
Misc
Informational
03/27/2024
03/22/24 JMJ All pervious reports where placed on PRCOM20231450 JMJ Erosion control is still maintaining, but appears need regular maintenance to ensure it stays securely in the ground. 03/27/24 JMJ Erosion still needs some maintenance but appears to be functionable. 04/18/24 JMJ Erosion still needs some maintenance but appears to be functionable.
Site Visit Partial 4/24/2024 4/24/2024 04/24/2024
Misc
Informational
04/16/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today.
Erosion Control Inspection Partial 5/1/2024 5/1/2024 05/01/2024
Misc
Informational
04/18/2024
03/22/24 JMJ All pervious reports where placed on PRCOM20231450 JMJ Erosion control is still maintaining, but appears need regular maintenance to ensure it stays securely in the ground. 03/27/24 JMJ Erosion still needs some maintenance but appears to be functionable. 04/18/24 JMJ Erosion still needs some maintenance but appears to be functionable. 05/01/24 JMJ Erosion still needs some maintenance but appears to be functionable.
Erosion Control Inspection Partial 5/8/2024 5/8/2024 05/08/2024
Misc
Informational
05/01/2024
03/22/24 JMJ All pervious reports where placed on PRCOM20231450 JMJ Erosion control is still maintaining, but appears need regular maintenance to ensure it stays securely in the ground. 03/27/24 JMJ Erosion still needs some maintenance but appears to be functionable. 04/18/24 JMJ Erosion still needs some maintenance but appears to be functionable. 05/01/24 JMJ Erosion still needs some maintenance but appears to be functionable. 05/08/24 JMJ Erosion still needs some maintenance but appears to be functionable.
Sanitary Sewer Construction Inspection Partial 5/8/2024 5/8/2024 05/08/2024
Misc
Informational
05/08/2024
05/08/24 Wednesday JMJ Contractor installed approximately 70' of 4" SDR-26 to the building and grease trap. Contractor tie-in to public sanitary 6" main. Construction of sanitary storm appear to correct as per project plans.
Site Visit Partial 5/17/2024 5/17/2024 05/17/2024
Misc
Informational
04/24/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today. 05/17/24 Friday JMJ Contractor worked site, but not on related work this week.
Water Service Inspection Partial 5/22/2024 5/22/2024 05/22/2024
Misc
Informational
05/22/2024
05/22/24 Wednesday The City of Lee's Summit tap the water main for the contractor to run 2" private water main for meter and building.
Site Visit Partial 5/28/2024 5/28/2024 05/28/2024
Misc
Informational
05/17/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today. 05/17/24 Friday JMJ Contractor worked site, but not on related work this week. 05/28/24 Tuesday JMJ Contractor hauled of spoils from site.
Pavement-Curb Construction Partial 6/3/2024 6/3/2024 06/03/2024
Misc
Informational
04/11/2024
04/09/24 Wednesday JMJ Contractor continued to install forms and plans to pour concrete around 2:30PM. Talked with contractor about the use of white cure. 06/03/24 Monday JMJ Contractor poured approximately 100' of curb for the drive thru for the Swig business. Inspector reminded contractor to spray white cure on curbs, contractor agree said white was onsite.
Pavement-Curb Construction Partial 6/4/2024 6/4/2024 06/04/2024
Misc
Informational
06/03/2024
04/09/24 Wednesday JMJ Contractor continued to install forms and plans to pour concrete around 2:30PM. Talked with contractor about the use of white cure. 06/03/24 Monday JMJ Contractor poured approximately 100' of curb for the drive thru for the Swig business. 06/04/24 Tuesday JMJ Contractor poured the (curbs/island) for the drive thru for the Swig.
Pavement-Surface Partial 6/5/2024 6/5/2024 06/05/2024
Misc
Informational
06/05/2024
06/05/24 Wednesday Contractor poured parking lot on the Southeast side.
Pavement-Surface Partial 6/12/2024 6/12/2024 06/12/2024
Misc
Informational
06/05/2024
06/05/24 Wednesday Contractor poured parking lot on the Southeast side. 06/12/24 Wednesday JMJ Contractor continued to pour drive lane and parking lot area.
Pavement-Surface Partial 6/14/2024 6/14/2024 06/14/2024
Misc
Informational
06/12/2024
06/05/24 Wednesday Contractor poured parking lot on the Southeast side. 06/12/24 Wednesday JMJ Contractor continued to pour drive lane and parking lot area. 06/14/24 Friday JMJ Contractor continued to pour drive lane and parking lot area. Contractor poured the South entrance driveway approach to the business. Contractor set forms for North entrance driveway approach to be poured.
Site Visit Partial 6/25/2024 6/25/2024 06/25/2024
Misc
Informational
05/28/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today. 05/17/24 Friday JMJ Contractor worked site, but not on related work this week. 05/28/24 Tuesday JMJ Contractor hauled of spoils from site. 06/25/24 Tuesday JMJ (Star Development) Contractor worked @ site, but not on related work. Contractor plans to pour driveway approach tomorrow.
Erosion Control Inspection Partial 6/26/2024 6/26/2024 06/26/2024
Misc
Informational
05/08/2024
03/22/24 JMJ All pervious reports where placed on PRCOM20231450 JMJ Erosion control is still maintaining, but appears need regular maintenance to ensure it stays securely in the ground. 03/27/24 JMJ Erosion still needs some maintenance but appears to be functionable. 04/18/24 JMJ Erosion still needs some maintenance but appears to be functionable. 05/01/24 JMJ Erosion still needs some maintenance but appears to be functionable. 05/08/24 JMJ Erosion still needs some maintenance but appears to be functionable. 06/26/24 JMJ Erosion still needs some maintenance but appears to be functionable.
Pavement-Surface Partial 6/26/2024 6/26/2024 06/26/2024
Misc
Informational
06/14/2024
06/05/24 Wednesday Contractor poured parking lot on the Southeast side. 06/12/24 Wednesday JMJ Contractor continued to pour drive lane and parking lot area. 06/14/24 Friday JMJ Contractor continued to pour drive lane and parking lot area. Contractor poured the South entrance driveway approach to the business. Contractor set forms for North entrance driveway approach to be poured. 06/26/24 Wednesday JMJ Contractor poured the approach on the Northside and the dumpster pad.
Sidewalk Inspection Partial 6/26/2024 6/26/2024 06/26/2024
Misc
Informational
06/26/2024
06/26/24 Wednesday JMJ Sidewalk forms and materials were laid.
Sidewalk Inspection Partial 6/27/2024 6/27/2024 06/27/2024
Misc
Informational
06/26/2024
06/26/24 Wednesday JMJ Sidewalk forms and materials were laid. 06/27/24 Thursday JMJ Sidewalk to the Southeast of the project was poured early in the week. The sidewalk passed the inspection slope % inspection.
Site Visit Partial 7/1/2024 7/1/2024 07/01/2024
Misc
Informational
06/25/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today. 05/17/24 Friday JMJ Contractor worked site, but not on related work this week. 05/28/24 Tuesday JMJ Contractor hauled of spoils from site. 06/25/24 Tuesday JMJ (Star Development) Contractor worked @ site, but not on related work. Contractor plans to pour driveway approach tomorrow.
Misc
Informational
07/01/2024
7-1-24 Dustin A, No work being done due to rain
Site Visit Partial 7/9/2024 7/9/2024 07/09/2024
Misc
Informational
07/01/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today. 05/17/24 Friday JMJ Contractor worked site, but not on related work this week. 05/28/24 Tuesday JMJ Contractor hauled of spoils from site. 06/25/24 Tuesday JMJ (Star Development) Contractor worked @ site, but not on related work. Contractor plans to pour driveway approach tomorrow. 07/09/24 Tuesday JMJ (Star Development) Contractor has been working on retaining wall at the Northside of project. Work on site no related 10:30am.
Misc
Informational
07/01/2024
7-1-24 Dustin A, No work being done due to rain
Sidewalk Inspection Passed 7/12/2024 7/12/2024 07/12/2024
Misc
Informational
06/27/2024
06/26/24 Wednesday JMJ Sidewalk forms and materials were laid. 06/27/24 Thursday JMJ Sidewalk to the Southeast of the project was poured early in the week. The sidewalk passed the inspection slope % inspection. 07/12/24 Friday JMJ Contractor poured sidewalk that runs along the Northside of project. Side walk passed inspection: note on the Northwest side of of ramp there some high variants in cross slope, but not enough to fail with difficult angles and steep grades. Inspector compared cross slopes of existing sidewalk ramps to West and founded higher variants of cross slopes.
Site Visit Partial 7/31/2024 7/31/2024 07/31/2024
Misc
Informational
07/09/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today. 05/17/24 Friday JMJ Contractor worked site, but not on related work this week. 05/28/24 Tuesday JMJ Contractor hauled of spoils from site. 06/25/24 Tuesday JMJ (Star Development) Contractor worked @ site, but not on related work. Contractor plans to pour driveway approach tomorrow. 07/09/24 Tuesday JMJ (Star Development) Contractor has been working on retaining wall at the Northside of project. Work on site no related 10:30am. 07/31/24 Wednesday JMJ (Star Development) Contractor worked onsite preforming general duties.
Misc
Informational
07/09/2024
7-1-24 Dustin A, No work being done due to rain
Site Visit Partial 8/9/2024 8/9/2024 08/09/2024
Misc
Informational
07/31/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today. 05/17/24 Friday JMJ Contractor worked site, but not on related work this week. 05/28/24 Tuesday JMJ Contractor hauled of spoils from site. 06/25/24 Tuesday JMJ (Star Development) Contractor worked @ site, but not on related work. Contractor plans to pour driveway approach tomorrow. 07/09/24 Tuesday JMJ (Star Development) Contractor has been working on retaining wall at the Northside of project. Work on site no related 10:30am. 07/31/24 Wednesday JMJ (Star Development) Contractor worked onsite preforming general duties. 08/09/24 Friday JMJ (Star Development) Contractor has completed the dumpster construction and trees were being planted.
Misc
Informational
07/31/2024
7-1-24 Dustin A, No work being done due to rain
Site Visit Partial 10/22/2024 10/22/2024 10/22/2024
Misc
Informational
08/09/2024
04/12/24 Friday JMJ No work on site today. 04/16/24 Tuesday JMJ No work on site today. 04/24/24 Wednesday JMJ Contractor worked site, but not on related work today. 05/17/24 Friday JMJ Contractor worked site, but not on related work this week. 05/28/24 Tuesday JMJ Contractor hauled of spoils from site. 06/25/24 Tuesday JMJ (Star Development) Contractor worked @ site, but not on related work. Contractor plans to pour driveway approach tomorrow. 07/09/24 Tuesday JMJ (Star Development) Contractor has been working on retaining wall at the Northside of project. Work on site no related 10:30am. 07/31/24 Wednesday JMJ (Star Development) Contractor worked onsite preforming general duties. 08/09/24 Friday JMJ (Star Development) Contractor has completed the dumpster construction and trees were being planted.
Misc
Informational
08/09/2024
7-1-24 Dustin A, No work being done due to rain
Verify Final Inspection Status - New Com Development Complete 11/20/2024
Final Completion - Planning Passed 11/22/2024 11/22/2024
Final Completion - Building Inspections Passed 11/22/2024 11/22/2024
Final Completion - Field Engineering Final Completion 11/22/2024 11/22/2024
Misc
Informational
11/22/2024
11/22/24 Friday JMJ Passed occupancy inspection. The one site concern is the no vegetation of island area which will be breaking ground in the near future.
Documents & Images
Date Uploaded File Type Document Name
12/11/2023 Receipt Receipt for transaction:2023-009018
12/19/2023 Letter DE-Permit
12/20/2023 Approved Plans STAMPED APPROVED 05-Summit Orchards (r4 2023-12-14) FDP (Site Plan)
03/22/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
04/01/2024 Letter INSPECTION SUMMARY
04/04/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/24/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/08/2024 Letter INSPECTION SUMMARY
05/08/2024 Letter INSPECTION SUMMARY
05/17/2024 Letter INSPECTION SUMMARY
05/22/2024 Letter INSPECTION SUMMARY
05/28/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/04/2024 Letter INSPECTION SUMMARY
06/05/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/27/2024 Letter INSPECTION SUMMARY
06/27/2024 Letter INSPECTION SUMMARY
07/01/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home