Permit Application Status

PRSITE20226145


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20226145
Development - Site
Final Acceptance
SOUTHPORT BUSINESS CENTER LLC
Drive-Thru Lane
12/14/2022
12/30/2022
04/07/2023
Locations
Contacts
SOUTHPORT BUSINESS CENTER LLC, Address:1485 SW MARKET ST  
CHRIS MEYER, Address:10401 COLLEGE BLVD #4134, Phone:(479) 925-8160  
Scott Ready, Phone: 8169691225  
Bob Dimond, Address:5400 Johnson Drive, Phone:(913) 789-8665  
tim@tripleoaksinvestments.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 12/16/2022 12/17/2022
Scott Ready
Fees
Paid Fees Amount Paid Owing Date Paid
9110071-Site Grading Fee $296.28 $296.28 Paid 01/05/2023
9110081-Paved Surface Inspection Fee $1,603.14 $1,603.14 Paid 01/05/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 01/05/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Partial 1/11/2023 1/11/2023 01/11/2023
Misc
Informational
01/11/2023
1/11/23 PS - CONTRACTOR REMOVED PRIOR ASPHALT AND WILL BE PLACING NEW AGGREGATE TO BRING TO GRADE
Pavement-Curb Construction Partial 1/11/2023 1/11/2023 01/11/2023
Misc
Informational
01/11/2023
1-11-23 RH. Contractor started forming up the curb along the building. Contractor was informed that aggregate would be needed and compacted due to soil being seen and not aggregate base.
Pavement-Curb Construction Partial 01/12/2023
Misc
Informational
01/11/2023
1-11-23 RH. Contractor started forming up the curb along the building. Contractor was informed that aggregate would be needed and compacted due to soil being seen and not aggregate base. 1-12-23 RH. Contractor added aggregate and was reforming up the curbs for the jobsite. Contractor also started forming up the sidewalk connected to curb.
Pavement-Curb Construction Partial 01/17/2023
Misc
Informational
01/12/2023
1-11-23 RH. Contractor started forming up the curb along the building. Contractor was informed that aggregate would be needed and compacted due to soil being seen and not aggregate base. 1-12-23 RH. Contractor added aggregate and was reforming up the curbs for the jobsite. Contractor also started forming up the sidewalk connected to curb. 1-17-22 RH. Contractor has placed all forms for Sidewalk and curb. Aggregate was placed and compacted. Subgrade was firm where they will be pouring concrete. Approved to pour.
Pavement-Curb Construction Partial 01/17/2023
Misc
Informational
01/17/2023
1-11-23 RH. Contractor started forming up the curb along the building. Contractor was informed that aggregate would be needed and compacted due to soil being seen and not aggregate base. 1-12-23 RH. Contractor added aggregate and was reforming up the curbs for the jobsite. Contractor also started forming up the sidewalk connected to curb. 1-17-22 RH. Contractor has placed all forms for Sidewalk and curb. Aggregate was placed and compacted. Subgrade was firm where they will be pouring concrete. Approved to pour. Contractor started pouring concrete in the afternoon for the curb and sidewalk.
Pavement-Curb Construction Partial 1/19/2023 1/19/2023 01/19/2023
Misc
Informational
01/17/2023
1-11-23 RH. Contractor started forming up the curb along the building. Contractor was informed that aggregate would be needed and compacted due to soil being seen and not aggregate base. 1-12-23 RH. Contractor added aggregate and was reforming up the curbs for the jobsite. Contractor also started forming up the sidewalk connected to curb. 1-17-22 RH. Contractor has placed all forms for Sidewalk and curb. Aggregate was placed and compacted. Subgrade was firm where they will be pouring concrete. Approved to pour. Contractor started pouring concrete in the afternoon for the curb and sidewalk. 1-19-22 PS Contractor pouring remainder of curb. Contractor discussed pouring drive line and was reminded that proof roll would need to be done before pour
Pavement-Proof Roll Partial 01/20/2023
Misc
Informational
01/20/2023
1-20-23 RH. Contractor proof rolled the drive lane and the subgrade held up correctly. Approved to pour.
Pavement-Surface Partial 01/20/2023
Misc
Corrective Action Required
01/20/2023
1-20-23 PS Contractor completed drive lane for the drive through. Talked to contractor and they stated blankets will be used due to freezing temps overnight. Contractor informed that they will be cutting the joints tomorrow
Grading/Excavation/Fill Inspection Partial 1/23/2023 1/23/2023 01/23/2023
Misc
Informational
01/11/2023
1/11/23 PS - CONTRACTOR REMOVED PRIOR ASPHALT AND WILL BE PLACING NEW AGGREGATE TO BRING TO GRADE 1-23-23 PS Contractor removing old asphalt material at parking area and placing new aggregate for compaction.
Pavement-Proof Roll Passed 01/24/2023
Misc
Informational
01/20/2023
1-20-23 RH. Contractor proof rolled the drive lane and the subgrade held up correctly. Approved to pour. 1-24-23 RH. Contractor used a dump truck for a proof roll of the parking spaces. Aggregate held the weight and passed the proof roll. Contractor will pour concrete today.
Pavement-Surface Partial 1/24/2023 1/24/2023 01/24/2023
Misc
Corrective Action Required
01/20/2023
1-20-23 PS Contractor completed drive lane for the drive through. Talked to contractor and they stated blankets will be used due to freezing temps overnight. Contractor informed that they will be cutting the joints tomorrow 1-24-23 PS Contractor poured remainder of concrete at parking lot. There are some areas where existing parking lot was damaged against new drive from cutting and machinery that will need to be addressed.
Pavement-Surface Partial 1/26/2023 1/26/2023 01/26/2023
Misc
Corrective Action Required
01/24/2023
1-20-23 PS Contractor completed drive lane for the drive through. Talked to contractor and they stated blankets will be used due to freezing temps overnight. Contractor informed that they will be cutting the joints tomorrow 1-24-23 PS Contractor poured remainder of concrete at parking lot. There are some areas where existing parking lot was damaged against new drive from cutting and machinery that will need to be addressed. 1-26-23 PS Contractor removing blankets from concrete at parking lot and will be cutting. Also working on site cleanup and grading on west side curb line
ESC - (Vegetation/Ground Cover) Partial 1/27/2023 1/27/2023 01/27/2023
Misc
Corrective Action Required
01/27/2023
1-27-23 PS Contractor placing river rock in drive thru islands at lot and continuing site cleanup
Pavement-Surface Partial 3/21/2023 3/21/2023 03/21/2023
Misc
Corrective Action Required
01/26/2023
1-20-23 PS Contractor completed drive lane for the drive through. Talked to contractor and they stated blankets will be used due to freezing temps overnight. Contractor informed that they will be cutting the joints tomorrow 1-24-23 PS Contractor poured remainder of concrete at parking lot. There are some areas where existing parking lot was damaged against new drive from cutting and machinery that will need to be addressed. 1-26-23 PS Contractor removing blankets from concrete at parking lot and will be cutting. Also working on site cleanup and grading on west side curb line 3-21-23 PS Met with owner on site to discuss remaining punch list items needed for correction
Site Visit Partial 3/31/2023 3/31/2023 03/31/2023
Site Visit Complete 4/4/2023 4/4/2023 04/04/2023
Grading/Excavation/Fill Inspection Passed 4/4/2023 4/4/2023 04/04/2023
Misc
Informational
01/23/2023
1/11/23 PS - CONTRACTOR REMOVED PRIOR ASPHALT AND WILL BE PLACING NEW AGGREGATE TO BRING TO GRADE 1-23-23 PS Contractor removing old asphalt material at parking area and placing new aggregate for compaction.
Pavement-Curb Construction Passed 4/4/2023 4/4/2023 04/04/2023
Misc
Informational
01/19/2023
1-11-23 RH. Contractor started forming up the curb along the building. Contractor was informed that aggregate would be needed and compacted due to soil being seen and not aggregate base. 1-12-23 RH. Contractor added aggregate and was reforming up the curbs for the jobsite. Contractor also started forming up the sidewalk connected to curb. 1-17-22 RH. Contractor has placed all forms for Sidewalk and curb. Aggregate was placed and compacted. Subgrade was firm where they will be pouring concrete. Approved to pour. Contractor started pouring concrete in the afternoon for the curb and sidewalk. 1-19-22 PS Contractor pouring remainder of curb. Contractor discussed pouring drive line and was reminded that proof roll would need to be done before pour
Pavement-Surface Passed 4/4/2023 4/4/2023 04/04/2023
Misc
Corrective Action Required
03/21/2023
1-20-23 PS Contractor completed drive lane for the drive through. Talked to contractor and they stated blankets will be used due to freezing temps overnight. Contractor informed that they will be cutting the joints tomorrow 1-24-23 PS Contractor poured remainder of concrete at parking lot. There are some areas where existing parking lot was damaged against new drive from cutting and machinery that will need to be addressed. 1-26-23 PS Contractor removing blankets from concrete at parking lot and will be cutting. Also working on site cleanup and grading on west side curb line 3-21-23 PS Met with owner on site to discuss remaining punch list items needed for correction 4-4-23 PS Contractor cut out damaged areas of existing parking lot and provided cold patch asphalt at requested locations
Erosion Control Inspection Passed 4/4/2023 4/4/2023 04/04/2023
Documents & Images
Date Uploaded File Type Document Name
12/14/2022 Approved Plans FDP Approval_121422_2022-12-08 MACADOODLES - FINAL DEVELOPMENT PLAN
12/30/2022 Receipt Receipt for transaction: 2022-009726
12/30/2022 Letter DE-Permit
01/05/2023 Receipt Receipt for transaction: 2023-000059
01/11/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/12/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
01/19/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/24/2023 Letter INSPECTION SUMMARY
01/24/2023 Letter INSPECTION SUMMARY
01/26/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
03/21/2023 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter DE-Certificate of Final Acceptance (Commercial)
04/07/2023 Letter Macadoodles Site Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home