PRSITE20212975
Development - Site
Final Acceptance
R P FIELDS INVESTMENTS LLC
DEVELOPMENT COMPLETE
MISSOURI MANUFACTURING - PARKING LOT
06/10/2021
06/14/2021
08/18/2022
Locations
Contacts
R P FIELDS INVESTMENTS LLC, Address:1301 TABITHA LN  
QUALITY CUSTOM CONSTRUCTION, Address:PO BOX 269, Phone:(913) 208-8233  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/10/2021 06/14/2021
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
Paved Surface Inspection Fee $1,103.67 $1,103.67 Paid 06/10/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 8/23/2021 8/23/2021 08/23/2021
Misc
Informational
08/23/2021
8/23/21 12:00 - Talked to Ed and he has a straw waddle in place, and more on the way for the ESC on this site.
Grading/Excavation/Fill Inspection Partial 8/25/2021 8/25/2021 08/25/2021
Misc
Informational
08/23/2021
8/23/21 12:00 - Spoke with Ed he is removing the pad on the South side of the building out, and planned to do the drain install tomorrow.
Misc
Informational
08/25/2021
8/25/21 9:30 - Spoke with Ed about the pipes and getting the site prepped for the proof roll.
Grading/Excavation/Fill Inspection Partial 8/26/2021 8/26/2021 08/26/2021
Misc
Informational
08/25/2021
8/23/21 12:00 - Spoke with Ed he is removing the pad on the South side of the building out, and planned to do the drain install tomorrow.
Misc
Informational
08/25/2021
8/25/21 9:30 - Spoke with Ed about the pipes and getting the site prepped for the proof roll.
Misc
Informational
08/26/2021
8/26/21 11:00 - Spoke with Ed about the proof roll, informed him to give me a call a few days prior to putting in the concrete pad. Recommended he wait the few days before he poured just in case we got any rain.
Pavement-Proof Roll Passed 8/27/2021 8/27/2021 08/27/2021
Misc
Informational
08/27/2021
8/27/21 10:15 - Proof roll was done with 17tons. Rock is clean rock that was compacted, some small areas had some minor sinking. Crew plans to pour Tuesday morning, informed them that they are good as long as we get no rain. Monday they plan to install rebar on 2ft centers.
Misc
Informational
08/27/2021
8/27/21 10:15 - Proof roll was done with 17tons. Rock is clean rock that was compacted, some small areas had some minor sinking. Crew plans to pour Tuesday morning, informed them that they are good as long as we get no rain. Monday they plan to install rebar on 2ft centers.
Pavement-Surface Partial 9/7/2021 9/7/2021 09/07/2021
Misc
Informational
09/07/2021
9/7/21 9:00 - Walked site to make sure no water was standing, contractor plans to start setting rebar to pour concrete tomorrow at 6:30. 14:37. Contractor was installing rebar for the pour tomorrow morning.
Pavement-Surface Partial 9/8/2021 9/8/2021 09/08/2021
Misc
Informational
09/07/2021
9/7/21 9:00 - Walked site to make sure no water was standing, contractor plans to start setting rebar to pour concrete tomorrow at 6:30. 14:37. Contractor was installing rebar for the pour tomorrow morning.
Misc
Informational
09/08/2021
9/8/21 8:40 - Crew poured the concrete slab.
Pavement-Curb Construction Passed 11/02/2021
Pavement-Aggregate Base Passed 11/02/2021
Grading/Excavation/Fill Inspection Passed 8/27/2021 11/02/2021
Misc
Informational
08/26/2021
8/23/21 12:00 - Spoke with Ed he is removing the pad on the South side of the building out, and planned to do the drain install tomorrow.
Misc
Informational
08/26/2021
8/25/21 9:30 - Spoke with Ed about the pipes and getting the site prepped for the proof roll.
Misc
Informational
08/26/2021
8/26/21 11:00 - Spoke with Ed about the proof roll, informed him to give me a call a few days prior to putting in the concrete pad. Recommended he wait the few days before he poured just in case we got any rain.
Pavement-Surface Passed 11/02/2021
Misc
Informational
09/08/2021
9/7/21 9:00 - Walked site to make sure no water was standing, contractor plans to start setting rebar to pour concrete tomorrow at 6:30. 14:37. Contractor was installing rebar for the pour tomorrow morning.
Misc
Informational
09/08/2021
9/8/21 8:40 - Crew poured the concrete slab.
Documents & Images
Date Uploaded File Type Document Name
06/10/2021 Receipt Receipt for transaction: 2021-004294
06/14/2021 Letter DE-Permit
06/15/2021 approved 6.10.21 - FDP 20 SW Persels
05/24/2021 Missouri Manufacturing Dumpster Enclosure Detail
08/23/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
09/07/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter INSPECTION SUMMARY
08/18/2022 Letter DE-Certificate of Final Acceptance (Commercial)
08/18/2022 Missouri Manufacturing -Parking Lot Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home