Summary


PRSITE20192672
Development - Site
Final Acceptance
CMH PARKS INC
DEVELOPMENT COMPLETE
HAWTHORNE RIDGE POOL
09/18/2019
10/25/2019
09/10/2020
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/18/2019 09/24/2019
Marquelle Williams
Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Insp Fees $105.20 $105.20 Paid 09/18/2019
Water Insp Fee $30.44 $30.44 Paid 09/18/2019
Storm Sewer Inspection Fee $215.51 $215.51 Paid 09/18/2019
Paved Surface Inspection Fee $1,043.96 $1,043.96 Paid 09/18/2019
Site Grading Fee $399.70 $399.70 Paid 09/18/2019
Water Tap Fee $9,102.00 $9,102.00 Paid 09/18/2019
Water Meter Fee $656.18 $656.18 Paid 09/18/2019
$656.17
Right of Way Permit Fee $80.00 $80.00 Paid 09/18/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Pipe Partial 12/04/2019
Misc
Informational
12/04/2019
DECEMBER 4, 2019 35.93 FT of storm has been installed per plans of nyloplast.
Sanitary Sewer Construction Inspection Partial 12/04/2019
Misc
Informational
12/04/2019
DECEMBER 4, 2019 LARRY BEHR construction was installing sanitary sewer line and clean out as inspector arrived on site.
Sanitary Sewer - Invert Partial 01/10/2020
Misc
Informational
01/10/2020
DECEMBER 4, 2019 Crews poured collars and inverts.
Water Line - Construction Inspection Partial 01/10/2020
Misc
Informational
01/10/2020
DECEMBER 5, 2019 Crews were installing 53 LF of 1” service Line Type K Copper for water service. They also installed 45 degree bend, then another 12 LF of 1” service line type K
Water Line - Construction Inspection Partial 01/10/2020
Misc
Informational
01/10/2020
DECEMBER 6, 2019 Crews installed 1” water meter tap into existing 8” water main for 1” service water line type K copper
Curb - Proof Roll Partial 01/10/2020
Misc
Informational
01/10/2020
JANUARY 6, 2019 Vogler Trucking was onsite doing a proof roll on the curbs. All curbs passed.
Curb - Proof Roll Passed 03/03/2020
Misc
Informational
01/10/2020
JANUARY 6, 2019 Vogler Trucking was onsite doing a proof roll on the curbs. All curbs passed.
Misc
Informational
03/03/2020
The site sat with no activity all winter so another proof roll was required. I observed the proof roll for both the curbs and the parking lot. The proof roll passed with little to no deflection for both curb and parking lot. I verified the correct load weight. A photo of the load ticket has been uploaded to the system.
Proof roll parking lot Passed 03/03/2020
Misc
Informational
03/03/2020
The site sat with no activity all winter so another proof roll was required. I observed the proof roll for both the curbs and the parking lot. The proof roll passed with little to no deflection for both curb and parking lot. I verified the correct load weight. A photo of the load ticket has been uploaded to the system.
Commercial Curb Inspection Partial 04/02/2020
Misc
Informational
04/02/2020
K&E Flatwork is on site installing the curbs for the parking lot. I verified that they are using the correct concrete type and that the forms are set up according to the approved plans. Photos of the work will be uploaded to the system.
Driveway Inspection Partial 04/07/2020
Misc
Corrective Action Required
04/07/2020
PRE POUR INSPECTION Both commercial approaches were formed up according to the City of LS detail and had sufficient compacted aggregate. I will return for a post pour inspection later this week.
Commercial Curb Inspection Passed 4/8/2020 04/07/2020
Misc
Informational
04/02/2020
K&E Flatwork is on site installing the curbs for the parking lot. I verified that they are using the correct concrete type and that the forms are set up according to the approved plans. Photos of the work will be uploaded to the system.
Misc
Informational
04/07/2020
Final curb inspection. The parking lot curb has been installed and appears to match the approved plans. The crew grouted the back of the curbs today in the areas that had honeycomb. The ADA sections of the curb appear to be in compliance. Curbs are acceptable.
Driveway Inspection Passed 4/9/2020 04/08/2020
Misc
Corrective Action Required
04/07/2020
PRE POUR INSPECTION Both commercial approaches were formed up according to the City of LS detail and had sufficient compacted aggregate. I will return for a post pour inspection later this week.
Misc
Informational
04/08/2020
Both commercial drive approaches are installed according the the city and ADA standards.
Sidewalk Inspection Partial 04/21/2020
Misc
Informational
04/21/2020
PRE POUR INSPECTION The crew formed up sections of the public sidewalk that still need to be installed. The forms are set and there appears to be sufficient compacted aggregate.
Pavement-Surface Passed 04/22/2020
Misc
Informational
04/22/2020
Seal-O-Matic Paving was on site and installed the base lift for the parking lot. I verified the mix type was correct and that the temperature was with in acceptable range. I verified that the correct equipment was used for the install.
Street - Surface Course Passed 04/23/2020
Misc
Informational
04/23/2020
Seal-O-Matic Paving Solutions is on site installing the surface lift for the parking lot. I verified that the mix type and temperature were correct. I verified that the proper equipment is being used for that install and that the install appears to meet the City of LS Standards.
Sidewalk Inspection Passed 4/27/2020 04/29/2020
Misc
Informational
04/21/2020
PRE POUR INSPECTION The crew formed up sections of the public sidewalk that still need to be installed. The forms are set and there appears to be sufficient compacted aggregate.
Water Line - Construction Inspection Passed 07/02/2020
Misc
Informational
01/10/2020
DECEMBER 6, 2019 Crews installed 1” water meter tap into existing 8” water main for 1” service water line type K copper
Storm - Pipe Passed 07/02/2020
Misc
Informational
12/04/2019
DECEMBER 4, 2019 35.93 FT of storm has been installed per plans of nyloplast.
Sanitary Sewer Construction Inspection Passed 07/02/2020
Sanitary - Material Verification Passed 07/02/2020
Water - Material Verification Passed 07/02/2020
Sanitary Sewer Construction Inspection Passed 07/02/2020
Storm - Rip Rap Passed 07/02/2020
Storm - Outlet Structure Passed 07/02/2020
Storm - Inlets Clean Passed 07/02/2020
Storm - Material Verification Passed 07/02/2020
Street - Surface Course Passed 07/02/2020
Pavement-Surface Passed 07/02/2020
Pavement-Proof Roll Passed 07/02/2020
Grading/Excavation/Fill Inspection Passed 07/02/2020
ESC - (Vegetation/Ground Cover) Passed 09/10/2020
Misc
Informational
09/10/2020
John DiMauro 9/10/2020 There is sufficient vegetation established.
Erosion Control Inspection Passed 09/10/2020
Misc
Informational
09/10/2020
John DiMauro 9/10/2020 There is sufficient vegetation established. ESC devices can be removed at this time.
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home