Permit Application Status

PRSITE20191745


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20191745
Development - Site
Final Acceptance
MCBOB LLC
DEVELOPMENT COMPLETE
Site improvements related to a building expansion.
07/02/2019
08/01/2019
03/27/2020
Locations
Contacts
MCBOB LLC, Address:3200 NW OUTER RD S  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
ROTHWELL CONSTRUCTION INC, Address:1500 NORTH 7 HWY STE 100, Phone:(816) 228-8808  
JEFF@ROTHWELL-CONSTRUCTION.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/02/2019 07/02/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $375.00 $375.00 Paid 07/16/2019
91100C9-Water Insp Fee $155.58 $155.58 Paid 07/16/2019
9110072-Water Test Fee $200.00 $200.00 Paid 07/16/2019
9110068-Storm Fee $157.05 $157.05 Paid 07/16/2019
9110081-Paved Surface Inspection Fee $3,602.43 $3,602.43 Paid 07/16/2019
9110071-Site Grading Fee $422.40 $422.40 Paid 07/16/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/16/2019
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid



(None of the fees owing can be paid online)
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Fire Hydrant Passed 08/02/2019
Misc
Informational
08/02/2019
contractor installed fire new hydrant relocated line 8/2/19
Water Line - Construction Inspection Passed 7/30/2019 08/02/2019
Informational
08/01/2019
Contractor installed a 6" DIP sleeve from existing 6" PVC to the newly installed 6" PVC , Approximately 4' of PVC then 6" DIP 45 deg bend ,Approximately 40' of PVC and 6" DIP 45 deg bend, & Approximately 36' of PVC and the existing hydrant was reinstalled on line . All DIP fitting were mega lugged .
Water Line - Hydrostatic Test Passed 08/02/2019
Misc
Informational
08/02/2019
Fire line hydrostatic test passed at 200 psi at 2hrs .
Erosion Control Inspection Passed 12/04/2019
Grading/Excavation/Fill Inspection Passed 12/04/2019
Water - Material Verification Passed 12/04/2019
Water Line - Coliform Test 1 Passed 12/04/2019
Water Line - Coliform Test 2 Passed 12/04/2019
Water Line - Valve Passed 12/04/2019
Water Line - Thrust Restraint Passed 12/04/2019
Water Line - Construction Taps Removed Passed 12/04/2019
Curb - Proof Roll Passed 12/04/2019
Pavement-Proof Roll Passed 12/04/2019
Pavement-Surface Passed 12/04/2019
Street - Surface Course Passed 12/04/2019
Storm - Material Verification Passed 12/04/2019
Water - Material Verification Passed 12/04/2019
Water Line - Construction Inspection Passed 12/04/2019
Water - Material Verification Passed 12/04/2019
ESC - (Vegetation/Ground Cover) Passed 01/17/2020
Corrective Action Required
12/04/2019
Vegetation/grounds has not been completely finish to construction area in the front of dealership of by newly installed Grease trap and build structure. Sod or seeding is need around dumpster area.
Documents & Images
Date Uploaded File Type Document Name
07/16/2019 Receipt Receipt for transaction: 2019-004804
07/18/2019 Letter DE-Permit
08/01/2019 Letter INSPECTION SUMMARY
08/02/2019 image GREASE TRAP OLD
08/02/2019 image NEW GREASE TRAP
08/02/2019 image SANITARY PUMP PIT
08/02/2019 image AREA OF CONSTRUCTION GREASE AND SANITARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
12/04/2019 Letter INSPECTION SUMMARY
12/06/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
12/11/2019 DE- Substantial Completion
12/11/2019 DE- Punch List
01/17/2020 Letter DE-Certificate of Final Acceptance (Commercial)
01/17/2020 SUBARU LEE'S SUMMIT SIGNED CERTIFICATE OF ACCEPTANCE
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home