Permit Application Status

PRSITE20191297


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20191297
Development - Site
Final Acceptance
PHILLIPS REIS LLC
DEVELOPMENT COMPLETE
Full site development.
05/21/2019
05/23/2019
08/01/2022
Locations
Contacts
PHILLIPS REIS LLC, Address:1440 SE BROADWAY DR  
TEAGUE CONSTRUCTION INC, Address:4220 MAIN ST, Phone:(816) 763-1455  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/21/2019 05/21/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $135.00 $135.00 Paid 05/21/2019
9110072-Water Test Fee $200.00 $200.00 Paid 05/21/2019
9110068-Storm Fee $898.86 $898.86 Paid 05/21/2019
9110081-Street Inspections $5,889.06 $5,889.06 Paid 05/21/2019
9110071-Site Grading Fee $2,166.58 $2,166.58 Paid 05/21/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 05/21/2019
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 12/16/2019
Misc
Informational
12/16/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/16/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations.
Site Visit Partial 12/16/2019
Misc
Informational
12/16/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/16/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Site Visit Partial 12/16/2019
Misc
Informational
12/16/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/16/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/16/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Site Visit Partial 12/16/2019
Misc
Informational
12/16/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/16/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/16/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
12/16/2019
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Site Visit Partial 12/16/2019
Misc
Informational
12/16/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/16/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/16/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
12/16/2019
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Misc
Informational
12/16/2019
JUNE 12, 2019 Inspector talked with Kevin Reed of Teague Construction. Crews were on site installing the building wall and footings for buildings.
Site Visit Partial 12/16/2019
Misc
Informational
12/16/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/16/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/16/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
12/16/2019
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Misc
Informational
12/16/2019
JUNE 12, 2019 Inspector talked with Kevin Reed of Teague Construction. Crews were on site installing the building wall and footings for buildings.
Misc
Informational
12/16/2019
JUNE 14, 2019 Along with Gene Williams, Development Engineer, Inspector met with Kevin Reed of Teague Construction to discuss being able to put rip rap from creek in the water stream along east side of the building. Gene informed them that they could not and told them to issue plan revision in order to get slope and rip rap correct without putting rip rap in stream.
Storm Sewer Construction Inspection Partial 12/16/2019
Misc
Informational
12/16/2019
JULY 1, 2019 G&B Construction was onsite setting forms for catch Basin on Storm Line 5. Crews were pouring structure later in the after noon. Crews were Pouring top later on in week
Storm Sewer Construction Inspection Partial 12/16/2019
Misc
Informational
12/16/2019
JULY 1, 2019 G&B Construction was onsite setting forms for catch Basin on Storm Line 5. Crews were pouring structure later in the after noon. Crews were Pouring top later on in week
Misc
Informational
12/16/2019
JULY 30, 2019 Teague Construction and G&B Construction are pouring Inlet Inverts and lid on Inlet structure for Storm Line 5. Crews poured inverts first, then built lid top for structure and poured it last.
Site Visit Partial 12/16/2019
Misc
Informational
12/16/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/16/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/16/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
12/16/2019
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Misc
Informational
12/16/2019
JUNE 12, 2019 Inspector talked with Kevin Reed of Teague Construction. Crews were on site installing the building wall and footings for buildings.
Misc
Informational
12/16/2019
JUNE 14, 2019 Along with Gene Williams, Development Engineer, Inspector met with Kevin Reed of Teague Construction to discuss being able to put rip rap from creek in the water stream along east side of the building. Gene informed them that they could not and told them to issue plan revision in order to get slope and rip rap correct without putting rip rap in stream.
Misc
Informational
12/16/2019
AUGUST 7, 20190 Delivered Plans to Kevin Reed w/Teague Construction for retaining wall. No Crews working due to rain.
Curb - Proof Roll Passed 12/16/2019
Misc
Informational
12/16/2019
AUGUST 14, 2019 Proof Roll on curbs passed. Crews installed geo grid and AB3 rock on on South parking lot. Crews had AB3 rock rolled in tight. Inspector did not get ticket on truck. Curbs will be formed on 8/15/19 so curbs can be poured.
Pavement-Curb Construction Partial 12/16/2019
Misc
Informational
12/16/2019
AUGUST 15, 2019 Crews have started installing forms for South Parking Lot new edition curbs. Crews will finish forming curbs within next couple of days and will start pouring curbs no later than 8/20/19 per Kevin Reed with Teague Construction
Pavement-Curb Construction Partial 12/16/2019
Misc
Informational
12/16/2019
AUGUST 15, 2019 Crews have started installing forms for South Parking Lot new edition curbs. Crews will finish forming curbs within next couple of days and will start pouring curbs no later than 8/20/19 per Kevin Reed with Teague Construction
Misc
Informational
12/16/2019
AUGUST 19, 2019 Curbs have all been formed. Rebar has also been installed in curb forms. Kevin Reed with Teague says they will start pouring curbs 8/20/19.
Pavement-Curb Construction Partial 12/16/2019
Misc
Informational
12/16/2019
AUGUST 15, 2019 Crews have started installing forms for South Parking Lot new edition curbs. Crews will finish forming curbs within next couple of days and will start pouring curbs no later than 8/20/19 per Kevin Reed with Teague Construction
Misc
Informational
12/16/2019
AUGUST 19, 2019 Curbs have all been formed. Rebar has also been installed in curb forms. Kevin Reed with Teague says they will start pouring curbs 8/20/19.
Misc
Informational
12/16/2019
AUGUST 20, 2019 Crews were onsite pouring curbs. As crews were forming curbs, contractors were sealing with the clear finish.
Driveway Inspection Partial 12/16/2019
Misc
Informational
12/16/2019
AUGUST 20, 2019 Drive Approach formed. Inspector excepted crews pouring driveway approach monolithicly with curbs.
Driveway Inspection Partial 12/16/2019
Misc
Informational
12/16/2019
AUGUST 20, 2019 Drive Approach formed. Inspector excepted crews pouring driveway approach monolithicly with curbs.
Misc
Informational
12/16/2019
AUGUST 21, 2019 POST POUR INSPECTION Inspector went to inspect driveway approach and curbs which were poured monolithicly
Pavement-Surface Partial 12/16/2019
Misc
Informational
12/16/2019
SEPTEMBER 9, 2019 Base Layer of asphalt being installed at the south end parking lot. Seal O Matic was the contractor installing asphalt on this project.
Pavement-Curb Construction Partial 12/17/2019
Misc
Informational
12/16/2019
AUGUST 15, 2019 Crews have started installing forms for South Parking Lot new edition curbs. Crews will finish forming curbs within next couple of days and will start pouring curbs no later than 8/20/19 per Kevin Reed with Teague Construction
Misc
Informational
12/16/2019
AUGUST 19, 2019 Curbs have all been formed. Rebar has also been installed in curb forms. Kevin Reed with Teague says they will start pouring curbs 8/20/19.
Misc
Informational
12/16/2019
AUGUST 20, 2019 Crews were onsite pouring curbs. As crews were forming curbs, contractors were sealing with the clear finish.
Misc
Informational
12/17/2019
SEPTEMBER 24, 2019 Crews are onsite forming and pouring fire lane on SE side of building. Inspector checked forms and rebar will onsite. Crews set forms and put rebar in as they poured.
Storm Sewer Construction Inspection Partial 12/17/2019
Misc
Informational
12/16/2019
JULY 1, 2019 G&B Construction was onsite setting forms for catch Basin on Storm Line 5. Crews were pouring structure later in the after noon. Crews were Pouring top later on in week
Misc
Informational
12/16/2019
JULY 30, 2019 Teague Construction and G&B Construction are pouring Inlet Inverts and lid on Inlet structure for Storm Line 5. Crews poured inverts first, then built lid top for structure and poured it last.
Misc
Informational
12/17/2019
SEPTEMBER 25, 2019 Crew continue to work on Storm and detention pond. Teague construction and G&B Construction waiting on change submital from engineers for elevation change on Storm and detention pond.
Storm - Outlet Structure Partial 12/17/2019
Misc
Informational
12/17/2019
SEPTEMBER 26, 2019 All Storm has been installed. Crews are waiting for junction boxes to be formed so they can pour.
Storm - Outlet Structure Partial 12/17/2019
Misc
Informational
12/17/2019
SEPTEMBER 26, 2019 All Storm has been installed. Crews are waiting for junction boxes to be formed so they can pour.
Misc
Informational
12/17/2019
SEPTEMBER 27, 2019 Junction boxes are being formed. Crews will be pouring bottoms of boxes today. Rip Rap has been installed on east side of building along creek.
Storm - Outlet Structure Partial 12/17/2019
Misc
Informational
12/17/2019
SEPTEMBER 26, 2019 All Storm has been installed. Crews are waiting for junction boxes to be formed so they can pour.
Misc
Informational
12/17/2019
SEPTEMBER 27, 2019 Junction boxes are being formed. Crews will be pouring bottoms of boxes today. Rip Rap has been installed on east side of building along creek.
Misc
Informational
12/17/2019
OCTOBER 2, 2019 G&B Construction continue to form and pour junction boxes.
Site Visit Partial 12/18/2019
Misc
Informational
12/16/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/16/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/16/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
12/16/2019
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Misc
Informational
12/16/2019
JUNE 12, 2019 Inspector talked with Kevin Reed of Teague Construction. Crews were on site installing the building wall and footings for buildings.
Misc
Informational
12/16/2019
JUNE 14, 2019 Along with Gene Williams, Development Engineer, Inspector met with Kevin Reed of Teague Construction to discuss being able to put rip rap from creek in the water stream along east side of the building. Gene informed them that they could not and told them to issue plan revision in order to get slope and rip rap correct without putting rip rap in stream.
Misc
Informational
12/16/2019
AUGUST 7, 20190 Delivered Plans to Kevin Reed w/Teague Construction for retaining wall. No Crews working due to rain.
Misc
Informational
12/18/2019
NOVEMBER 11, 2019 G&B Construction were onsite installing geo grid and AB3 in North End of the building parking lot/fire lane that connects with the east/north east fire lane.
Roof Drain Partial 12/18/2019
Misc
Informational
12/18/2019
NOVEMBER 20, 2019 Upon Inspectors arrival, G&B crews were installing and hooking up the roof drain system.
Site Visit Partial 12/19/2019
Misc
Informational
12/18/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/18/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/18/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
12/18/2019
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Misc
Informational
12/18/2019
JUNE 12, 2019 Inspector talked with Kevin Reed of Teague Construction. Crews were on site installing the building wall and footings for buildings.
Misc
Informational
12/18/2019
JUNE 14, 2019 Along with Gene Williams, Development Engineer, Inspector met with Kevin Reed of Teague Construction to discuss being able to put rip rap from creek in the water stream along east side of the building. Gene informed them that they could not and told them to issue plan revision in order to get slope and rip rap correct without putting rip rap in stream.
Misc
Informational
12/18/2019
AUGUST 7, 20190 Delivered Plans to Kevin Reed w/Teague Construction for retaining wall. No Crews working due to rain.
Misc
Informational
12/18/2019
NOVEMBER 11, 2019 G&B Construction were onsite installing geo grid and AB3 in North End of the building parking lot/fire lane that connects with the east/north east fire lane.
Misc
Informational
12/19/2019
NOVEMBER 20, 2019 Inspector was onsite to verify all valves that were to be shut down for the installation of the fire hydrant on the North side of the project. Inspector hung door hangers and talked to all businesses that would be put out of water.
Water Line - Fire Hydrant Partial 12/19/2019
Misc
Informational
12/19/2019
NOVEMBER 22, 2019 Water has been shut down, business have been notified, and crews are installing fire hydrant and tying a stick of pipe into the water main. Crews have been given a 4 hour window to get things done.
Street - Surface Course Partial 12/19/2019
Misc
Informational
12/19/2019
NOVEMBER 22, 2019 North end parking lot is being paved. Geogrid has been installed, and crews are paving driveway/parking lot that connects with South East fire lane.
Water - Material Verification Passed 12/19/2019
Misc
Informational
12/19/2019
NOVEMBER 22, 2019 All materials have been verified by inspector. Crew did not have poly wrap on site, but crew leader DID go and pick some up for installation.
Site Visit Partial 12/19/2019
Misc
Informational
12/19/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/19/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/19/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
12/19/2019
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Misc
Informational
12/19/2019
JUNE 12, 2019 Inspector talked with Kevin Reed of Teague Construction. Crews were on site installing the building wall and footings for buildings.
Misc
Informational
12/19/2019
JUNE 14, 2019 Along with Gene Williams, Development Engineer, Inspector met with Kevin Reed of Teague Construction to discuss being able to put rip rap from creek in the water stream along east side of the building. Gene informed them that they could not and told them to issue plan revision in order to get slope and rip rap correct without putting rip rap in stream.
Misc
Informational
12/19/2019
AUGUST 7, 20190 Delivered Plans to Kevin Reed w/Teague Construction for retaining wall. No Crews working due to rain.
Misc
Informational
12/19/2019
NOVEMBER 11, 2019 G&B Construction were onsite installing geo grid and AB3 in North End of the building parking lot/fire lane that connects with the east/north east fire lane.
Misc
Informational
12/19/2019
NOVEMBER 20, 2019 Inspector was onsite to verify all valves that were to be shut down for the installation of the fire hydrant on the North side of the project. Inspector hung door hangers and talked to all businesses that would be put out of water.
Misc
Informational
12/19/2019
NOVEMBER 25, 2019 Inspector came to observe the installation of geo grid and AB3 rock on the remainder of the North End parking lot/ driveway that connects around the building to the south east side. Crews were going to be pouring the rest of that area sometime this week.
Driveway Inspection Partial 12/19/2019
Misc
Informational
12/16/2019
AUGUST 20, 2019 Drive Approach formed. Inspector excepted crews pouring driveway approach monolithicly with curbs.
Misc
Informational
12/16/2019
AUGUST 21, 2019 POST POUR INSPECTION Inspector went to inspect driveway approach and curbs which were poured monolithicly
Misc
Informational
12/19/2019
DECEMBER 3, 2019 Upon arrival, crews formed North End Drive approach. Gravel had been installed, and it was compacted. Forms for drive approach were within Lee Summit and ADA spec. Crews were to install concrete later this afternoon
Storm - Pipe Partial 01/10/2020
Misc
Informational
01/10/2020
JANUARY 3, 2020 Contractor and owner decided to add a storm drain between the old and new parking lots. Revision of plans were received and handed to contractor on Dec. 13, 2019. Crews added storm drain, hooked up storm line to existing storm inlet, poured collars, added the correct amount of gravel, and back filled.
Site Visit Partial 01/10/2020
Misc
Informational
12/19/2019
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
12/19/2019
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
12/19/2019
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
12/19/2019
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Misc
Informational
12/19/2019
JUNE 12, 2019 Inspector talked with Kevin Reed of Teague Construction. Crews were on site installing the building wall and footings for buildings.
Misc
Informational
12/19/2019
JUNE 14, 2019 Along with Gene Williams, Development Engineer, Inspector met with Kevin Reed of Teague Construction to discuss being able to put rip rap from creek in the water stream along east side of the building. Gene informed them that they could not and told them to issue plan revision in order to get slope and rip rap correct without putting rip rap in stream.
Misc
Informational
12/19/2019
AUGUST 7, 20190 Delivered Plans to Kevin Reed w/Teague Construction for retaining wall. No Crews working due to rain.
Misc
Informational
12/19/2019
NOVEMBER 11, 2019 G&B Construction were onsite installing geo grid and AB3 in North End of the building parking lot/fire lane that connects with the east/north east fire lane.
Misc
Informational
12/19/2019
NOVEMBER 20, 2019 Inspector was onsite to verify all valves that were to be shut down for the installation of the fire hydrant on the North side of the project. Inspector hung door hangers and talked to all businesses that would be put out of water.
Misc
Informational
12/19/2019
NOVEMBER 25, 2019 Inspector came to observe the installation of geo grid and AB3 rock on the remainder of the North End parking lot/ driveway that connects around the building to the south east side. Crews were going to be pouring the rest of that area sometime this week.
Misc
Informational
01/10/2020
JANUARY 8, 2020 Inspector Marquelle Williams and Inspector supervisor Steve Robbins met with Engineer Kent Monter onsite. As a group, we wanted to observe the survey for the NEW as-built on the detention pond. Also onsite was Kevin Sterrett, design engineer of the project. We wanted to make sure he knew everything that need to be on the as builts.
Site Visit Complete 02/10/2020
Misc
Informational
01/10/2020
MAY 30, 2019 Teague Construction along with Terracon were moving soil, shooting densities and preparing for building pad proof roll.
Misc
Informational
01/10/2020
JUNE 3, 2019 G&B Construction crews were onsite grading and shooting elevations .
Misc
Informational
01/10/2020
JUNE 5, 2019 G&B Construction and Teague Construction were installing and rolling in Lime Screening for pad. Terracon was on site testing and doing geotechnical work.
Misc
Informational
01/10/2020
JUNE 11, 2019 G&B Construction onsite moving dirt and digging trench.
Misc
Informational
01/10/2020
JUNE 12, 2019 Inspector talked with Kevin Reed of Teague Construction. Crews were on site installing the building wall and footings for buildings.
Misc
Informational
01/10/2020
JUNE 14, 2019 Along with Gene Williams, Development Engineer, Inspector met with Kevin Reed of Teague Construction to discuss being able to put rip rap from creek in the water stream along east side of the building. Gene informed them that they could not and told them to issue plan revision in order to get slope and rip rap correct without putting rip rap in stream.
Misc
Informational
01/10/2020
AUGUST 7, 20190 Delivered Plans to Kevin Reed w/Teague Construction for retaining wall. No Crews working due to rain.
Misc
Informational
01/10/2020
NOVEMBER 11, 2019 G&B Construction were onsite installing geo grid and AB3 in North End of the building parking lot/fire lane that connects with the east/north east fire lane.
Misc
Informational
01/10/2020
NOVEMBER 20, 2019 Inspector was onsite to verify all valves that were to be shut down for the installation of the fire hydrant on the North side of the project. Inspector hung door hangers and talked to all businesses that would be put out of water.
Misc
Informational
01/10/2020
NOVEMBER 25, 2019 Inspector came to observe the installation of geo grid and AB3 rock on the remainder of the North End parking lot/ driveway that connects around the building to the south east side. Crews were going to be pouring the rest of that area sometime this week.
Misc
Informational
01/10/2020
JANUARY 8, 2020 Inspector Marquelle Williams and Inspector supervisor Steve Robbins met with Engineer Kent Monter onsite. As a group, we wanted to observe the survey for the NEW as-built on the detention pond. Also onsite was Kevin Sterrett, design engineer of the project. We wanted to make sure he knew everything that need to be on the as builts.
Site Visit Complete 2/10/2020 at 2:20 PM 03/09/2020
Misc
Informational
02/10/2020
Kent Monter and I visited the site at HT Solutions to check to the stability of the road on the back side of the building next to the creek. Everything appears to be built according to the plans, but there is one area of concern for the future of the creek. When the water flows down from the creek and makes the turn it is eroding the creek wall. There is a good amount of rip-rap where the road was built but there is no rip-rap where the water makes the turns to go down stream. A part of the creek is already starting to erode as there is a large tree that has the roots exposed, we believe that installing some more rip-rap at the bends where the water goes down stream and makes the turn would be beneficial in avoiding future problems of erosion on the banks of the stream which may have a direct effect of undermining the road behind the building.
Driveway Inspection Passed 03/09/2020
Misc
Informational
12/19/2019
AUGUST 20, 2019 Drive Approach formed. Inspector excepted crews pouring driveway approach monolithicly with curbs.
Misc
Informational
12/19/2019
AUGUST 21, 2019 POST POUR INSPECTION Inspector went to inspect driveway approach and curbs which were poured monolithicly
Misc
Informational
12/19/2019
DECEMBER 3, 2019 Upon arrival, crews formed North End Drive approach. Gravel had been installed, and it was compacted. Forms for drive approach were within Lee Summit and ADA spec. Crews were to install concrete later this afternoon
Water - Material Verification Passed 04/29/2020
Roof Drain Passed 04/29/2020
Misc
Informational
12/18/2019
NOVEMBER 20, 2019 Upon Inspectors arrival, G&B crews were installing and hooking up the roof drain system.
Misc
Informational
04/29/2020
Roof drains have been installed.
Water Line - Valve Passed 04/29/2020
Water Line - Fire Hydrant Passed 04/29/2020
Grading/Excavation/Fill Inspection Partial 04/29/2020
Pavement-Proof Roll Passed 04/29/2020
Street - Wedge Lift Passed 04/29/2020
Storm - Material Verification Passed 04/29/2020
Storm - Inlets Clean Passed 04/29/2020
Storm - Rip Rap Passed 04/29/2020
Storm - Swales Passed 04/29/2020
ESC - (Vegetation/Ground Cover) Partial 4/29/2020 04/29/2020
PW-Misc
Corrective Action Required
04/29/2020
Vegetation still needs to be established in and around the detetnion basin. 70%
Grading/Excavation/Fill Inspection Passed 04/29/2020
Water - Material Verification Passed 04/29/2020
Storm - Outlet Structure Passed 04/29/2020
Misc
Informational
12/17/2019
SEPTEMBER 26, 2019 All Storm has been installed. Crews are waiting for junction boxes to be formed so they can pour.
Misc
Informational
12/17/2019
SEPTEMBER 27, 2019 Junction boxes are being formed. Crews will be pouring bottoms of boxes today. Rip Rap has been installed on east side of building along creek.
Misc
Informational
12/17/2019
OCTOBER 2, 2019 G&B Construction continue to form and pour junction boxes.
Storm Sewer Construction Inspection Passed 04/29/2020
Misc
Informational
12/17/2019
JULY 1, 2019 G&B Construction was onsite setting forms for catch Basin on Storm Line 5. Crews were pouring structure later in the after noon. Crews were Pouring top later on in week
Misc
Informational
12/17/2019
JULY 30, 2019 Teague Construction and G&B Construction are pouring Inlet Inverts and lid on Inlet structure for Storm Line 5. Crews poured inverts first, then built lid top for structure and poured it last.
Misc
Informational
12/17/2019
SEPTEMBER 25, 2019 Crew continue to work on Storm and detention pond. Teague construction and G&B Construction waiting on change submital from engineers for elevation change on Storm and detention pond.
Pavement-Surface Passed 04/29/2020
Misc
Informational
12/16/2019
SEPTEMBER 9, 2019 Base Layer of asphalt being installed at the south end parking lot. Seal O Matic was the contractor installing asphalt on this project.
Proof roll parking lot Passed 04/29/2020
Misc
Informational
12/16/2019
SEPTEMBER 9, 2019 Proof Roll on parking lot performed. Proof Roll passed. Crews will be layer base layer of asphalt later today.
Storm - Material Verification Passed 04/29/2020
Erosion Control Inspection Passed 04/29/2020
Record Drawing Review Passed 5/6/2020 01/07/2021
Misc
Informational
01/07/2021
The as-built was turned it and is acceptable.
Sidewalk Inspection Passed 8/1/2022 08/01/2022
Misc
Informational
08/01/2022
The money for the sidewalk was paid in lie of.
Documents & Images
Date Uploaded File Type Document Name
05/21/2019 Receipt Receipt for transaction: 2019-002650
05/23/2019 Letter DE-Permit
05/24/2019 HT Solutions Addition
12/16/2019 Photograph JULY 1, 2019 Storm Line 5 Inlet Box
12/16/2019 Photograph JULY 1, 2019 Storm Line 5 Inlet Box0
12/16/2019 Photograph JULY 1, 2019 Storm Line 5 Inlet Box1
12/16/2019 Photograph JULY 30, 2019 Inverts Inlet structure Line 5
12/16/2019 Photograph JULY 30, 2019 Inverts Inlet structure Line 6
12/16/2019 Photograph JULY 30, 2019 Top Formed Inlet structure Line 5
12/16/2019 Photograph JULY 30, 2019 Top Poured Inlet Structure Line 5
12/16/2019 Photograph Parking Lot
12/16/2019 Photograph Parking Lot0
12/16/2019 Photograph rebar
12/16/2019 Photograph rebar0
12/16/2019 Photograph rebar1
12/16/2019 Photograph AUGUST 20, 2019 Poured Curbs
12/16/2019 Photograph AUGUST 20, 2019 Poured Curbs0
12/16/2019 Photograph AUGUST 20, 2019 Poured Curbs1
12/16/2019 Photograph AUGUST 20, 2019 Poured Curbs2
12/16/2019 Photograph AUGUST 20, 2019 South parking lot driveway approach
12/16/2019 Photograph AUGUST 21, 2019 Driveway approach Post pour Inspection
12/16/2019 SEPTEMBER 9, 2019 South Parking Lot Proof Roll
12/16/2019 SEPTEMBER 9, 2019 South Parking Lot Proof Roll0
12/16/2019 SEPTEMBER 9, 2019 Base Layer Asphalt South Parking lot
12/17/2019 Plans 18063 AB1-AS BUILT POND
12/17/2019 Photograph SEPTEMBER 24, 2019 Forms Fire Lane SE side of building
12/17/2019 Photograph SEPTEMBER 24, 2019 Fire Lane SE side of building
12/17/2019 Photograph SEPTEMBER 24, 2019 Fire Lane SE side of building0
12/17/2019 Photograph SEPTEMBER 25, 2019 Storm
12/17/2019 Photograph SEPTEMBER 26, 2019. Storm
12/17/2019 Photograph SEPTEMBER 27, 2019 Forms for junction boxes
12/17/2019 Photograph SEPTEMBER 27, 2019 Rip Rap East side of building alone creek
12/17/2019 Photograph OCTOBER 2, 2019 Junction Boxes
12/18/2019 AB3 North end parking lot
12/18/2019 AB3 North end parking lot0
12/18/2019 NOVEMBER 20, 2019 Roof Drain system
12/18/2019 Photograph NOVEMBER 20, 2019 Roof Drain System0
12/19/2019 Photograph NOVEMBER 22, 2019 North End Fire Hydrant installation
12/19/2019 Photograph NOVEMBER 22, 2019 North End Fire Hydrant Installation0
12/19/2019 Photograph NOVEMBER 22, 2019 North End Fire Hydrant Installation1
12/19/2019 Photograph NOVEMBER 22, 2019 North End Parking Lot paving
12/19/2019 Photograph NOVEMBER 25, 2019 Geo grid North end parking lot
12/19/2019 Photograph DECEMBER 3, 2019 Driveway approach Pre Pour
12/19/2019 Photograph DECEMBER 3, 2019 Driveway approach Post Pour
01/10/2020 Photograph JANUARY 3, 2020 STORM INLET PIPE AND CONCRETE COLLARS IN PARKING LOT
01/10/2020 Photograph JANUARY 3, 2020 STORM INLET PIPE AND COLLARS IN PARKING LOT
01/10/2020 Photograph JANUARY 3, 2020 STORM INLET PIPE AND CONCRETE COLLARS IN PARKING LOT0
04/29/2020 Letter DE-Daily Inspection Summary
04/29/2020 Letter DE-Daily Inspection Summary
04/29/2020 Letter DE-Certificate of Substantial Completion Multiple Lot
04/30/2020 Plans Approved Public Water Main Extension
06/03/2020 Letter HT Solutions Substantial Completion
06/03/2020 Letter HT Solutions Punch List
01/07/2021 Letter DE-Daily Inspection Summary
08/01/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home