Permit Application Status

PRSITE20191266


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20191266
Development - Site
Final Acceptance
MIDWEST DIVISION LSH LLC
DEVELOPMENT COMPLETE
LEES SUMMIT MEDICAL CENTER - HCA MEDICAL OFFICE BUILDING
05/16/2019
05/23/2019
07/16/2020
Locations
Contacts
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
TURNER CONSTRUCTION COMPANY, Address:1220 WASHINGTON STE 1000, Phone:(816) 283-0555  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/16/2019 05/22/2019
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $715.50 $715.50 Paid 05/16/2019
91100C9-Water Insp Fee $1,084.62 $1,084.62 Paid 05/16/2019
9110072-Water Test Fee $400.00 $400.00 Paid 05/16/2019
9110068-Storm Sewer Inspection Fee $3,819.42 $3,819.42 Paid 05/16/2019
9110081-Paved Surface Inspection Fee $16,405.93 $16,405.93 Paid 05/16/2019
9110071-Site Grading Fee $19,118.14 $19,118.14 Paid 05/16/2019
$19,118.15
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Proof roll parking lot Partial 07/20/2019
Misc
Informational
07/20/2019
JUNE 13, 2019 Josh King of Turner Construction and dirt crew started installing Portland Cement Ash @ 5am. Inspector visually watched crews till in Portland Cement In south area of job site where south parking lot will be.
Misc
Informational
07/20/2019
JUNE 14, 2019 Crew continued to till and roll Portland in on SE and East future parking lot areas. @2:00pm Proof roll failed in various parts of SE, and S parking lots. Inspector allowed AB3 rock on parts of parking lot that did pass. Will re proof roll on 6/18/19 on parts that failed and on East parking lot.
Misc
Informational
07/20/2019
JUNE 17, 2019 Re proof rolled all Portland Ash cement on all parking lots. All parking lots passed. Inspector allowed crew to cover all future parking lots with AB3 rock. @3:30pm Josh King of Turner Construction installed Geo grid @ entranced/exit off SE Blue PKWY. Crew covered area where geo grid was installed with AB3 rock.
Misc
Informational
07/20/2019
JUNE 18, 2019 Crews installing and compacting AB3 on all parking lots while Inspector was present.
Misc
Informational
07/29/2019
June 24, 2019 Turner Construction and crews proof rolled on South row of Southeast parking lot where it previously failed.
Misc
Informational
07/29/2019
June 25, 2019 Turner Construction and Crews proof rolled on SE parking lot on Far East end nearest to the street. Proof roll passed. West end nearest to street failed. Superintendent Josh King will call Inspector for rest of proof roll.
Misc
Informational
07/29/2019
June 27, 2019 Turner Construction and crews proof rolled remaining failed sections of SE and East lots and all lots passed. All parking lots are ready for base portion of asphalt.
Curb - Proof Roll Partial 07/20/2019
Misc
Informational
07/20/2019
JUNE 19, 2019 Proof roll on all curb lines in all parking lots passed.
Curb - Proof Roll Partial 07/20/2019
Misc
Informational
07/20/2019
JUNE 19, 2019 Proof roll on all curb lines. All curb lines passed.
Commercial Curb Inspection Partial 07/29/2019
Misc
Informational
07/29/2019
JUNE 20, 2019 Turner Construction and Crews were installing curbs on South, and east parking lots.
Misc
Informational
07/29/2019
June 27, 2019 @2:00pm Turner Construction and crews poured concrete curbs @ entrance of Lee Summit Medical center.
Pavement-Surface Partial 07/29/2019
Misc
Informational
07/29/2019
JUNE 28 2019 Turner Construction and Asphalt Crews are laying the base portion of asphalt in the South, Southeast, and East parking lots. Terracon was on site testing density of Base layer.
Site Visit Partial 07/30/2019
Misc
Informational
07/30/2019
JULY 1, 2019 Demo starting on for next phase of project. Turner Construction and crews are demoing curbs and asphalt. South, Southeast, and East parking lots were striped on 6/30/19 Sunday over the weekend.
Sanitary Sewer Construction Inspection Partial 07/30/2019
Misc
Informational
07/30/2019
JULY 9, 2019 9:30am Upon inspectors arrival, Manhole 24 had been installed and some pipe had also been installed. Instead of a concrete invert, pipe will be used and top of pipe will be cut to make an invert. Field Inspection supervisor Steve Robbins inspected this and accepted the pipe to be used as an invert. 2:30pm Turner construction and Rodriguez Brothers construction has assembled approx 84 LF of pipe from MH 24 to MH 25.
Misc
Informational
07/30/2019
JULY 10, 2019 Rodriguez Brothers crew set MH 25 and installed approx 140 LF of pipe
Misc
Informational
07/30/2019
JULY 11, 2019 Rodriguez Brothers crew installed more pipe up to existing pipe. Crew will need revision of plans. Crew at a stopping point. Need to tie in with Y to existing.
Misc
Informational
07/30/2019
JULY 23, 2019 Inspector inspected existing manhole to make sure rebar was going to be tied in per details.
Commercial Curb Inspection Partial 07/30/2019
Misc
Informational
07/29/2019
JUNE 20, 2019 Turner Construction and Crews were installing curbs on South, and east parking lots.
Misc
Informational
07/30/2019
JULY 11, 2019 Bedrock crews are installing curbs in the SE parking lot.
Sanitary Sewer - Air Test Partial 07/30/2019
Misc
Informational
07/30/2019
JULY 15, 2019 The normal 30 day waiting period was waived due to job site being private. Rodriguez Brothers crew did their sanitary air testing on MH 24. Test passed.
Water Line - Construction Inspection Partial 07/30/2019
Misc
Informational
07/30/2019
JULY 15, 2019 Rodriguez Brothers construction has been laying water lines at a rapid pace throughout project.
Misc
Informational
07/30/2019
JULY 16, 2019 Rodriguez Brothers continuing construction of waterline.
Misc
Informational
07/30/2019
JULY 18, 2019 Rodriguez Brothers construction continued construction of waterline.
Proof roll parking lot Partial 10/23/2019
Misc
Informational
07/20/2019
JUNE 13, 2019 Josh King of Turner Construction and dirt crew started installing Portland Cement Ash @ 5am. Inspector visually watched crews till in Portland Cement In south area of job site where south parking lot will be.
Misc
Informational
07/20/2019
JUNE 14, 2019 Crew continued to till and roll Portland in on SE and East future parking lot areas. @2:00pm Proof roll failed in various parts of SE, and S parking lots. Inspector allowed AB3 rock on parts of parking lot that did pass. Will re proof roll on 6/18/19 on parts that failed and on East parking lot.
Misc
Informational
07/20/2019
JUNE 17, 2019 Re proof rolled all Portland Ash cement on all parking lots. All parking lots passed. Inspector allowed crew to cover all future parking lots with AB3 rock. @3:30pm Josh King of Turner Construction installed Geo grid @ entranced/exit off SE Blue PKWY. Crew covered area where geo grid was installed with AB3 rock.
Misc
Informational
10/23/2019
October 23, 2019 Terracon did third party inspection and pass the curb portion (inspection was completed before 8:00 am). Result will be sent to Marquelle for verification. Geogrid will be installed in parking lot area to achieve stabilization.
Pavement-Curb Construction Partial 10/26/2019
Misc
Informational
10/26/2019
Contractor poured a total of 14yd of curbs in parking lot. New curbs were sprayed with white cure. SE Blue Pkwy 10/26/19
Site Visit Partial 10/29/2019
Misc
Informational
07/30/2019
JULY 1, 2019 Demo starting on for next phase of project. Turner Construction and crews are demoing curbs and asphalt. South, Southeast, and East parking lots were striped on 6/30/19 Sunday over the weekend.
Misc
Informational
10/29/2019
10/28/19 Contractor installed Geogrid on the extend parking location. Proof will be done at later date due to weather condition of rain and temperatures. JMJ
Proof roll parking lot Partial 11/04/2019
Misc
Informational
10/23/2019
JUNE 13, 2019 Josh King of Turner Construction and dirt crew started installing Portland Cement Ash @ 5am. Inspector visually watched crews till in Portland Cement In south area of job site where south parking lot will be.
Misc
Informational
10/23/2019
JUNE 14, 2019 Crew continued to till and roll Portland in on SE and East future parking lot areas. @2:00pm Proof roll failed in various parts of SE, and S parking lots. Inspector allowed AB3 rock on parts of parking lot that did pass. Will re proof roll on 6/18/19 on parts that failed and on East parking lot.
Misc
Informational
10/23/2019
JUNE 17, 2019 Re proof rolled all Portland Ash cement on all parking lots. All parking lots passed. Inspector allowed crew to cover all future parking lots with AB3 rock. @3:30pm Josh King of Turner Construction installed Geo grid @ entranced/exit off SE Blue PKWY. Crew covered area where geo grid was installed with AB3 rock.
Misc
Informational
10/23/2019
October 23, 2019 Terracon did third party inspection and pass the curb portion (inspection was completed before 8:00 am). Result will be sent to Marquelle for verification. Geogrid will be installed in parking lot area to achieve stabilization.
Misc
Informational
11/04/2019
NOVEMBER 4, 2019 PASS Re-Proof roll on South parking Lot phase 1 due to previous week snow dusting and rain. Martin Marietta provided proof roll.
Pavement-Surface Partial 11/06/2019
Misc
Informational
07/29/2019
JUNE 28 2019 Turner Construction and Asphalt Crews are laying the base portion of asphalt in the South, Southeast, and East parking lots. Terracon was on site testing density of Base layer.
Misc
Informational
11/06/2019
On NOVEMBER 5, 2019 Turner Construction and crews installed base and surface lifts of a small section in South Parking Lot phase I. On NOVEMBER 6, 2019 Morgan Contractors were onsite installing striping on the small portion of South Parking Lot Phase I.
Site Visit Partial 11/06/2019
Misc
Informational
10/29/2019
JULY 1, 2019 Demo starting on for next phase of project. Turner Construction and crews are demoing curbs and asphalt. South, Southeast, and East parking lots were striped on 6/30/19 Sunday over the weekend.
Misc
Informational
10/29/2019
10/28/19 Contractor installed Geogrid on the extend parking location. Proof will be done at later date due to weather condition of rain and temperatures. JMJ
Misc
Informational
11/06/2019
NOVEMBER 6, 2019 Turner Construction and crews installed have installed geo grid and have rocked areas where the North position parking area will be. Josh King of Turner Construction will call inspector when he is ready for a proof roll.
Fire Line - Flush Passed 2/13/2020 at 10:00 AM 02/13/2020
Misc
Informational
02/13/2020
The fire line was flushed for 30-35 minutes at a high velocity. Steve Robbins 02/13/2020 11:54 AM
Pavement-Surface Passed 06/09/2020
Misc
Informational
11/06/2019
JUNE 28 2019 Turner Construction and Asphalt Crews are laying the base portion of asphalt in the South, Southeast, and East parking lots. Terracon was on site testing density of Base layer.
Misc
Informational
11/06/2019
On NOVEMBER 5, 2019 Turner Construction and crews installed base and surface lifts of a small section in South Parking Lot phase I. On NOVEMBER 6, 2019 Morgan Contractors were onsite installing striping on the small portion of South Parking Lot Phase I.
Proof roll parking lot Passed 06/09/2020
Misc
Informational
11/04/2019
JUNE 13, 2019 Josh King of Turner Construction and dirt crew started installing Portland Cement Ash @ 5am. Inspector visually watched crews till in Portland Cement In south area of job site where south parking lot will be.
Misc
Informational
11/04/2019
JUNE 14, 2019 Crew continued to till and roll Portland in on SE and East future parking lot areas. @2:00pm Proof roll failed in various parts of SE, and S parking lots. Inspector allowed AB3 rock on parts of parking lot that did pass. Will re proof roll on 6/18/19 on parts that failed and on East parking lot.
Misc
Informational
11/04/2019
JUNE 17, 2019 Re proof rolled all Portland Ash cement on all parking lots. All parking lots passed. Inspector allowed crew to cover all future parking lots with AB3 rock. @3:30pm Josh King of Turner Construction installed Geo grid @ entranced/exit off SE Blue PKWY. Crew covered area where geo grid was installed with AB3 rock.
Misc
Informational
11/04/2019
October 23, 2019 Terracon did third party inspection and pass the curb portion (inspection was completed before 8:00 am). Result will be sent to Marquelle for verification. Geogrid will be installed in parking lot area to achieve stabilization.
Misc
Informational
11/04/2019
NOVEMBER 4, 2019 PASS Re-Proof roll on South parking Lot phase 1 due to previous week snow dusting and rain. Martin Marietta provided proof roll.
Pavement-Curb Construction Partial 06/09/2020
Misc
Informational
10/26/2019
Contractor poured a total of 14yd of curbs in parking lot. New curbs were sprayed with white cure. SE Blue Pkwy 10/26/19
Sanitary Sewer - Air Test Partial 06/09/2020
Misc
Informational
07/30/2019
JULY 15, 2019 The normal 30 day waiting period was waived due to job site being private. Rodriguez Brothers crew did their sanitary air testing on MH 24. Test passed.
Commercial Curb Inspection Passed 06/09/2020
Misc
Informational
07/30/2019
JUNE 20, 2019 Turner Construction and Crews were installing curbs on South, and east parking lots.
Misc
Informational
07/30/2019
JULY 11, 2019 Bedrock crews are installing curbs in the SE parking lot.
Erosion Control Inspection Passed 06/09/2020
Sanitary Sewer - Mandrel Passed 06/09/2020
Sanitary Sewer - Vacuum Passed 06/09/2020
Sanitary Sewer - Invert Passed 06/09/2020
Grading/Excavation/Fill Inspection Passed 06/09/2020
Water - Material Verification Passed 06/09/2020
Water Line - Coliform Test 1 Passed 06/09/2020
Water Line - Coliform Test 2 Passed 06/09/2020
Water Line - Valve Passed 06/09/2020
Water Line - Fire Hydrant Passed 06/09/2020
Water Line - Thrust Restraint Passed 06/09/2020
Misc
Informational
07/30/2019
JULY 16, 2019 Rodriguez Brothers installed thrust or kickers on all Ts.
Water Line - Construction Taps Removed Passed 06/09/2020
Sanitary - Material Verification Passed 06/09/2020
Sanitary Sewer Construction Inspection Passed 06/09/2020
Street - Surface Course Passed 06/10/2020
Misc
Informational
07/29/2019
JUNE 29, 2019 Turner Construction and Asphalt Crew finished base layer of parking lots, and started and finished surface layer of South, Southeast, and East parking lots. Crews will stripe parking lots on Sunday 6/30/19. Inspector spent 6 1/2 hours OT on 6/29/19 watching crews install surface layer.
Storm - Material Verification Passed 07/16/2020
Storm - Pipe Passed 07/16/2020
Storm - Inlets Clean Passed 07/16/2020
Storm - Outlet Structure Passed 07/16/2020
Storm - Rip Rap Passed 07/16/2020
ESC - (Vegetation/Ground Cover) Passed 07/16/2020
Sanitary Sewer Construction Inspection Passed 07/16/2020
Water Line - Construction Inspection Passed 07/16/2020
Sanitary - Material Verification Passed 07/16/2020
Water - Material Verification Passed 07/16/2020
Curb - Proof Roll Passed 07/16/2020
Misc
Informational
07/20/2019
JUNE 19, 2019 Proof roll on all curb lines. All curb lines passed.
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home