Summary


PRSITE20191166
Development - Site
Final Acceptance
DIOCESE OF KC-ST JOE REAL ESTATE CORP
DEVELOPMENT COMPLETE
SITE DEVELOPMENT FOR TWO STORY ADDITION ON EXISTING STRUCTURE
05/06/2019
06/04/2019
06/17/2020
Locations
Contacts
DIOCESE OF KC-ST JOE REAL ESTATE CORP, Address:20 W NINTH ST  
LYTLE CONSTRUCTION INC, Address:18505 E 163RD ST, Phone:(816) 524-7275  
DAN JEFFRIES, Address:LYTLE CONSTRUCTION, IN, Phone:(816) 524-7275  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/06/2019 05/14/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Water Insp Fee $21.60 $21.60 Paid 05/23/2019
Storm Sewer Inspection Fee $1,206.48 $1,206.48 Paid 05/23/2019
Paved Surface Inspection Fee $1,004.61 $1,004.61 Paid 05/23/2019
Site Grading Fee $348.75 $348.75 Paid 05/23/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Pipe Partial 7/18/2019 07/20/2019
Misc
Informational
07/20/2019
Marty’s crew from Rainbow Construction has laid 337 feet of 15 inch HDPE storm pipe. They also set Nyloplast grate inlets A2, A3, A4 and A5. RP 7-20-19
Storm - Material Verification Passed 7/18/2019 08/06/2019
Misc
Informational
08/06/2019
Nyloplast drain basins with traffic rated lids.
Site Visit Partial 8/23/2019 08/23/2019
Misc
Informational
08/23/2019
Met with Dan today to check on job status. It will be 3 to 4 weeks before he’s ready to do curbs and parking lot. RP 8-23-19
Misc
Informational
08/23/2019
Met with Dan today to check on job status. It will be 3 to 4 weeks before he’s ready to do curbs and parking lot. RP 8-23-19
Pavement-Stabilized Subgrade Passed 11/4/2019 11/18/2019
Misc
Informational
11/08/2019
Meet with JJ Martiny Concrete Construction. They are responsible for the sub grade stabilization and curbs. They are using Geo Grid and AB3 at 6 inches of depth. Because it is deemed a fire lane, they are cutting it down for 6 1/2 inches of asphalt. RP 11-4-19
Curb - Proof Roll Passed 11/15/2019 11/18/2019
Misc
Informational
11/18/2019
Curbing was installed before proof roll was performed. RP 11-12-19
Storm - Pipe Passed 7/22/2019 11/18/2019
Misc
Informational
07/20/2019
Marty’s crew from Rainbow Construction has laid 337 feet of 15 inch HDPE storm pipe. They also set Nyloplast grate inlets A2, A3, A4 and A5. RP 7-20-19
Pavement-Surface Passed 11/18/2019 11/26/2019
Misc
Informational
11/26/2019
Hanrahan Asphalt laid 251 tons of APWA Type 1 R asphalt for the school parking lot. Sub grade temperature was 40 degrees when they started. RP 11-26-19
Street - Surface Course Passed 11/18/2019 11/26/2019
Misc
Informational
11/26/2019
Hanrahan Asphalt laid 151 tons of APWA Type 3 R asphalt for the surface of the school parking lot. RP 11-26-19
Proof roll parking lot Passed 11/15/2019 11/27/2019
Misc
Informational
11/27/2019
Double tandem dump truck with 19.7 tons was used for th proof roll. No pumping or rolling was detected during the test. RP 11-22-19
Site Visit Complete 2/27/2020 06/09/2020
Misc
Informational
08/23/2019
Met with Dan today to check on job status. It will be 3 to 4 weeks before he’s ready to do curbs and parking lot. RP 8-23-19
Misc
Informational
08/23/2019
Met with Dan today to check on job status. It will be 3 to 4 weeks before he’s ready to do curbs and parking lot. RP 8-23-19
Misc
Informational
06/09/2020
Landscape stones and vegetation have been set. Permit can be closed out as final. RP 6-9-20
Documents & Images
Date Uploaded File Type Document Name
05/23/2019 Receipt Receipt for transaction: 2019-002749
05/31/2019 Letter DE-Permit
06/21/2019 Signed Permit
07/20/2019 Letter INSPECTION SUMMARY
08/06/2019 Letter INSPECTION SUMMARY
08/23/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
11/26/2019 Letter INSPECTION SUMMARY
11/26/2019 Letter INSPECTION SUMMARY
11/27/2019 Letter INSPECTION SUMMARY
12/31/2019 Letter DE-Punch List
12/31/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
12/31/2019 Our Lady of Presentaiton Classroom Addition Substantial Completion and Punch List
06/17/2020 Our Lady of Presentation Classroom Addition 2019
06/17/2020 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: