Summary


PRSITE20190984
Development - Site
Final Acceptance
MID-CONTINENT PUBLIC LIBRARY
DEVELOPMENT COMPLETE
FULL SITE DEVELOPMENT
04/18/2019
05/13/2019
04/24/2020
Locations
Contacts
MID-CONTINENT PUBLIC LIBRARY, Address:15616 E US HWY 24  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
Rick Meyer, Address:JE Dunn Construction, Phone:(660) 924-6465  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/18/2019 05/13/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Right of Way Permit Fee $80.00 $80.00 Paid 04/30/2019
Sanitary Sewer Insp Fees $607.50 $607.50 Paid 04/30/2019
Water Insp Fee $1,314.00 $1,314.00 Paid 04/30/2019
Water Test Fee $200.00 $200.00 Paid 04/30/2019
Storm Sewer Inspection Fee $3,509.85 $3,509.85 Paid 04/30/2019
Paved Surface Inspection Fee $18,235.53 $18,235.53 Paid 04/30/2019
Site Grading Fee $1,363.50 $1,363.50 Paid 04/30/2019
Water Tap Fee $11,363.00 $11,363.00 Paid 04/30/2019
Water Meter Fee $2,355.55 $2,355.55 Paid 04/30/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm Sewer Construction Inspection Partial 05/20/2019
Misc
Informational
05/20/2019
5-20-19 Heartland Heavy Construction crew installed Storm inlet box B-2. At time of inspection, crew has also installed approx. 165.00 LF of 18” HDPE with clean gravel.
Misc
Informational
05/20/2019
Heartland Heavy Construction crew installed Storm inlet box B-2. At time of inspection, crew has also installed approx. 165.00 LF of 18” HDPE with clean gravel.
Misc
Informational
05/20/2019
5-20-19 Heartland Heavy Construction crew installed Storm inlet box B-2. At time of inspection, crew has also installed approx. 165.00 LF of 18” HDPE with clean gravel.
Storm Sewer Construction Inspection Partial 05/30/2019
Misc
Informational
05/20/2019
5-20-19
Misc
Informational
05/22/2019
5-20-19
Misc
Informational
05/22/2019
5-20-19
Misc
Informational
05/30/2019
Heartland Heavy Crew installed 92.14 LF of 15” HDPE per spec from B-2 to RD-1. Crew surrounded pipe with clean gravel and left uncompacted for Inspector to inspect
Storm Sewer Construction Inspection Partial 06/03/2019
Misc
Informational
05/30/2019
5-20-19
Misc
Informational
05/30/2019
5-20-19
Misc
Informational
05/30/2019
5-20-19
Misc
Informational
05/30/2019
Heartland Heavy Crew installed 92.14 LF of 15” HDPE per spec from B-2 to RD-1. Crew surrounded pipe with clean gravel and left uncompacted for Inspector to inspect
Misc
Informational
06/03/2019
Heartland heavy crew installed 64.82 LF of 18” HDPE from EX-1 to, and set A-1. Crew currently setting from A-1 to toe wall.
Storm Sewer Construction Inspection Partial 06/05/2019
Misc
Informational
06/03/2019
5-20-19
Misc
Informational
06/03/2019
5-20-19
Misc
Informational
06/03/2019
5-20-19
Misc
Informational
06/03/2019
Heartland Heavy Crew installed 92.14 LF of 15” HDPE per spec from B-2 to RD-1. Crew surrounded pipe with clean gravel and left uncompacted for Inspector to inspect
Misc
Informational
06/03/2019
Heartland heavy crew installed 64.82 LF of 18” HDPE from EX-1 to, and set A-1. Crew currently setting from A-1 to toe wall.
Misc
Informational
06/05/2019
Upon arrival, Heartland Heavy Construction crew had poured and installed collars around Storm box A-1.
Misc
Informational
06/11/2019
At South end of the project, off of SE Blue Parkway, Heartland Heavy Crew installed S1 and toe wall.
Sanitary Sewer Construction Inspection Partial 06/05/2019
Misc
Informational
06/05/2019
Heartland Heavy Crew has starting installing Sanitary Sewer line. Crew started at SS-4 and are heading SE toward SS-3. SS line is being installed with the proper amount of clean gravel and with tracer wire.
Sanitary Sewer Construction Inspection Partial 06/05/2019
Misc
Informational
06/05/2019
Heartland Heavy Crew has starting installing Sanitary Sewer line. Crew started at SS-4 and are heading SE toward SS-3. SS line is being installed with the proper amount of clean gravel and with tracer wire.
Misc
Informational
06/05/2019
Heartland Heavy Crew was backfilling SS line SS-4 to SS-3. PSI Intertek was onsite shooting “blind” density compaction test. Density Technician from PSI was asked by Inspector to pick up a proctor in order to get a correct representation of soil being tested for compaction.
Water Line - Construction Inspection Partial 06/11/2019
Misc
Informational
06/11/2019
Heartland Heavy crew installed 209 LF of 6” AWWA C900 Fire Line pipe. Pipe was laid with the appropriate amount of gravel on top and bottom. Fire line was also installed with tracer wire.
Water Line - Construction Inspection Partial 06/11/2019
Misc
Informational
06/11/2019
Heartland Heavy Crew installed domestic water line (W1). The crew installed 140 LF of 2” Polyethylene Pipe. Crew is waiting on Lee Summit Water District to get a pit and meter so they can tap into it.
Misc
Informational
06/11/2019
Heartland Heavy Installed W2b (hydrant). Also Inspector inspected connections and kickers
Driveway Inspection Passed 04/24/2020
Water - Material Verification Passed 04/24/2020
Water Line - Hydrostatic Test Passed 04/24/2020
Water Line - Coliform Test 1 Passed 04/24/2020
Water Line - Coliform Test 2 Passed 04/24/2020
Water Line - Valve Passed 04/24/2020
Water Line - Fire Hydrant Passed 04/24/2020
Water Line - Thrust Restraint Passed 04/24/2020
Water Line - Construction Taps Removed Passed 04/24/2020
Grading/Excavation/Fill Inspection Passed 04/24/2020
Curb - Proof Roll Passed 04/24/2020
Pavement-Proof Roll Passed 04/24/2020
Pavement-Surface Passed 04/24/2020
Street - Wedge Lift Passed 04/24/2020
Street - Surface Course Passed 04/24/2020
Install Street and Stop Signs Passed 04/24/2020
Curb - Compression Strength Passed 04/24/2020
Storm - Material Verification Passed 04/24/2020
Storm - Pipe Passed 04/24/2020
Storm - Inlets Clean Passed 04/24/2020
Storm - Outlet Structure Passed 04/24/2020
Storm - Rip Rap Passed 04/24/2020
Storm - Swales Passed 04/24/2020
Erosion Control Inspection Passed 04/24/2020
ESC - (Vegetation/Ground Cover) Passed 04/24/2020
Sidewalk Inspection Passed 04/24/2020
Sewer Service Inspection Passed 04/24/2020
Water - Material Verification Passed 04/24/2020
Install Street and Stop Signs Passed 04/24/2020
Storm - Material Verification Passed 04/24/2020
Sidewalk Inspection Passed 04/24/2020
Sewer Service Inspection Passed 04/24/2020
Storm Sewer Construction Inspection Passed 04/24/2020
Misc
Informational
06/05/2019
5-20-19
Misc
Informational
06/05/2019
5-20-19
Misc
Informational
06/05/2019
5-20-19
Misc
Informational
06/05/2019
Heartland Heavy Crew installed 92.14 LF of 15” HDPE per spec from B-2 to RD-1. Crew surrounded pipe with clean gravel and left uncompacted for Inspector to inspect
Misc
Informational
06/05/2019
Heartland heavy crew installed 64.82 LF of 18” HDPE from EX-1 to, and set A-1. Crew currently setting from A-1 to toe wall.
Misc
Informational
06/05/2019
Upon arrival, Heartland Heavy Construction crew had poured and installed collars around Storm box A-1.
Sanitary Sewer Construction Inspection Passed 04/24/2020
Misc
Informational
06/05/2019
Heartland Heavy Crew has starting installing Sanitary Sewer line. Crew started at SS-4 and are heading SE toward SS-3. SS line is being installed with the proper amount of clean gravel and with tracer wire.
Misc
Informational
06/05/2019
Heartland Heavy Crew was backfilling SS line SS-4 to SS-3. PSI Intertek was onsite shooting “blind” density compaction test. Density Technician from PSI was asked by Inspector to pick up a proctor in order to get a correct representation of soil being tested for compaction.
Water Line - Construction Inspection Passed 04/24/2020
Misc
Informational
06/11/2019
Heartland Heavy crew installed 209 LF of 6” AWWA C900 Fire Line pipe. Pipe was laid with the appropriate amount of gravel on top and bottom. Fire line was also installed with tracer wire.
Water - Material Verification Passed 04/24/2020
Sanitary Sewer - Camera Test Passed 5/26/2020 04/24/2020
Water - Material Verification Passed 04/24/2020
Water - Material Verification Passed 04/24/2020
Water - Material Verification Passed 04/24/2020
Documents & Images
Date Uploaded File Type Document Name
04/30/2019 Receipt Receipt for transaction: 2019-001676
05/09/2019 Letter DE-Permit
05/20/2019 Inlet B-2 to 10+00
05/20/2019 Inlet B-2 to 10+00
05/20/2019 Inlet B-2 to 10+00
05/20/2019 Letter INSPECTION SUMMARY
05/30/2019 B-2 to Roof Drain
05/30/2019 B-2 to Roof Drain0
05/30/2019 B-2 to Roof Drain1
05/30/2019 Letter INSPECTION SUMMARY
05/30/2019 Letter INSPECTION SUMMARY
05/30/2019 Letter INSPECTION SUMMARY
06/03/2019 FROM EXISTING 1 to A1
06/03/2019 A-1 to TOE WALL
06/03/2019 EXISTING-1 PIPE AND COLLAR
06/03/2019 EXISTING-1 COLLAR
06/03/2019 Letter INSPECTION SUMMARY
06/05/2019 A-1 Collar
06/05/2019 A-1 collar0
06/05/2019 A-1 Collar1
06/05/2019 Letter INSPECTION SUMMARY
06/05/2019 SS-4 to SS-3
06/05/2019 SS-4 to SS-3
06/05/2019 Letter INSPECTION SUMMARY
06/05/2019 SS-4 to SS-3 compaction
06/05/2019 Letter INSPECTION SUMMARY
06/05/2019 Letter INSPECTION SUMMARY
06/11/2019 Fire Line W2 (a-d)
06/11/2019 Fire Line W2 (a-d)0
06/11/2019 Fire Line W2 (a-d)1
06/11/2019 Fire Line W2 (a-d)2
06/11/2019 Letter INSPECTION SUMMARY
06/11/2019 Domestic Water - W1
06/11/2019 Domestic Water- W1
06/11/2019 Domestic Water-W1
06/11/2019 Domestic Water-W2
06/11/2019 Letter INSPECTION SUMMARY
06/11/2019 W2 (a-d) connections and kickers
06/11/2019 W2(a-d) connections and kickers
06/11/2019 W2(a-d) connections and kickers0
06/11/2019 W2(a-d) connections and kickers1
06/11/2019 Letter INSPECTION SUMMARY
06/11/2019 South End S1-Toe wall
06/11/2019 South End S-1 Toe wall
11/06/2019 Plans 42440_2019-10-16_LS Library Retention As-built
04/17/2020 Letter DE-Certificate of Substantial Completion Multiple Lot
04/17/2020 Letter DE-Punch List
04/24/2020 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home