Summary



PRSITE20171192
Development - Site
Final Acceptance
SUMMIT MILL HOME OWNERS ASSOCIATION
DEVELOPMENT COMPLETE
Private sanitary connection at the public main
04/18/2017
03/13/2018
04/24/2018
Locations
Contacts
WESTLAND CONSTRUCTION INC, Address:20510 163RD STREET, Phone:(913) 724-3191  
SUMMIT MILL HOME OWNERS ASSOCIATION, Address:120 SE 30TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/12/2018 03/12/2018
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Insp Fees $120.00 $120.00 Paid 03/13/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Partial 3/14/2018 at 10:00 AM 03/14/2018
PW-Main inspection
Informational
03/14/2018
John DiMauro 03/14/2018 11:20 AM A Westland Construction crew is on site installing the inside drop for the public sanitary manhole. The crew core drilling into the MH at this time and plan to stub the pipe into the MH with the Tee fitting attached. They will leave space in the MH for a crew to apply the bituminous coating before completing the connections for the drop. I will return to further inspect during the process.
Sanitary Sewer Construction Inspection Partial 3/14/2018 at 3:00 PM 03/14/2018
PW-Main inspection
Informational
03/14/2018
John DiMauro 03/14/2018 11:20 AM A Westland Construction crew is on site installing the inside drop for the public sanitary manhole. The crew core drilling into the MH at this time and plan to stub the pipe into the MH with the Tee fitting attached. They will leave space in the MH for a crew to apply the bituminous coating before completing the connections for the drop. I will return to further inspect during the process.
PW-Main inspection
Informational
03/14/2018
John DiMauro 03/14/2018 3:07 PM The Westland Construction crew has the 2" force main pipe stubbed into the manhole. They have the compression tee installed on the pipe. The crew will finish the install at a later date after the coating has been applied.
Sanitary Sewer Construction Inspection Partial 4/11/2018 at 10:55 AM 04/11/2018
PW-Main inspection
Informational
03/14/2018
John DiMauro 03/14/2018 11:20 AM A Westland Construction crew is on site installing the inside drop for the public sanitary manhole. The crew core drilling into the MH at this time and plan to stub the pipe into the MH with the Tee fitting attached. They will leave space in the MH for a crew to apply the bituminous coating before completing the connections for the drop. I will return to further inspect during the process.
PW-Main inspection
Informational
03/14/2018
John DiMauro 03/14/2018 3:07 PM The Westland Construction crew has the 2" force main pipe stubbed into the manhole. They have the compression tee installed on the pipe. The crew will finish the install at a later date after the coating has been applied.
PW-Main inspection
Informational
04/11/2018
John DiMauro 04/11/2018 11:22 AM The crew is on site finishing up the inside drop for the sanitary manhole. I will return for a final inspection.
Sanitary Sewer Construction Inspection Passed 4/24/2018 04/24/2018
PW-Main inspection
Informational
04/24/2018
John DiMauro 04/24/2018 2:39 PM The Inside drop for the sanitary manhole 65-103 is complete.
Erosion Control Inspection Passed 04/24/2018
Sanitary Sewer Construction Inspection Passed 04/24/2018
Grading/Excavation/Fill Inspection Passed 04/24/2018
Sanitary - Material Verification Passed 04/24/2018
Sanitary Sewer Construction Inspection Passed 04/24/2018
Site Visit Complete 04/24/2018
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home