Permit Application Status

PRSGN20253027


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20253027
Sign Permit
Issued
DEER BROOK BGOG LLC
SIGN
D/F panel Replacement on existing monument background is light gray
07/17/2025
07/21/2025
Locations
Contacts
Infinity Signs, LLC, Address:4900 Lister Ave  
DEER BROOK BGOG LLC, Address:199 S HIGH ST STE 100  
Infinity Signs, LLC, Address:4900 Lister Ave, Phone:(816) 252-3337  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 07/21/2025 07/21/2025
Ian Trefren
Fees
Paid Fees Amount Paid Owing Date Paid
Sign Permit-Permanent Fee $100.00 $100.00 Paid 07/21/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Electrical Inspection Pending
Sign Confirmation Inspection Passed 8/11/2025 08/11/2025
Documents & Images
Date Uploaded File Type Document Name
07/17/2025 Application & Drawings
07/21/2025 Permit DS P/R Corrections Document
07/21/2025 Permit DS Building Permit
07/21/2025 Receipt Receipt for transaction:2025-005628
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home