Permit Application Status

PRSGN20233764


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20233764
Sign Permit
Final Completion
BLUE 255 LLC
SIGN
Installation of an illuminated Wall Sign
08/02/2023
08/09/2023
04/29/2024
Locations
Contacts
FAST SIGNS, Address:1163 SE OLDHAM PKWY, Phone:(816) 600-0264  
BLUE 255 LLC, Address:21 SE 29TH TER  
Eric Journagan, Address:1163 OLDHAM PKWY SE, Phone:(816) 600-0264  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 08/11/2023 08/09/2023
Shannon McGuire
Miscellaneous Correction
Corrective Action Required
08/09/2023

A wireway is just another word for a raceway. The UDO defines a raceway as a metal conduit or channel containing the electrical power lines for illuminated signs. As the “wireway” would be defined as a raceway by UDO standards it is prohibited by Sec. 9.060 of the sign code. Please remove the wireway/raceway from the proposed plan.
Sign Permit Review Rejected 08/07/2023 08/03/2023
Shannon McGuire
Miscellaneous Correction
Corrective Action Required
08/03/2023

A wireway is just another word for a raceway. The UDO defines a raceway as a metal conduit or channel containing the electrical power lines for illuminated signs. As the “wireway” would be defined as a raceway by UDO standards it is prohibited by Sec. 9.060 of the sign code. Please remove the wireway/raceway from the proposed plan.
Fees
Paid Fees Amount Paid Owing Date Paid
9110062-Sign Permit-Permanent Fee $100.00 $100.00 Paid 08/09/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sign Confirmation Inspection Not Ready 8/30/2023 08/30/2023
Sign Confirmation Inspection Passed 9/21/2023 09/21/2023
Final Electrical Inspection Passed 04/29/2024
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home