Permit Application Status

PRSGN20232255


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20232255
Sign Permit
Final Completion
SIGN
We would like to install / hang two branding signs; one on the South side and one on the East. This would only be two signs total, and affecting 2 of the 11 buildings
05/19/2023
05/19/2023
06/19/2023
Locations
Contacts
PELLA BUILDING SYSTEMS INCORPORATED, Address:906 W 9TH ST, Phone:(641) 628-9300  
Troy C. Porter, Address:577 Vista Court  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 05/23/2023 05/19/2023
Hector Soto Jr.
Fees
Paid Fees Amount Paid Owing Date Paid
9110062-Sign Permit-Permanent Fee $200.00 $200.00 Paid 05/19/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sign Confirmation Inspection Not Ready 6/12/2023 06/12/2023
Sign Confirmation Inspection Passed 7/11/2023 06/19/2023
Documents & Images
Date Uploaded File Type Document Name
05/19/2023 MEGAStorage USA - Lees Summit Phase I - Signage Permit Applications
05/19/2023 Permit DS P/R Corrections Document
05/19/2023 Permit DS Building Permit
05/19/2023 Receipt Receipt for transaction:2023-003509
06/12/2023 Letter INSPECTION SUMMARY
06/19/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home