Permit Application Status

PRSGN20223457


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20223457
Sign Permit
Closed
BRAIN DEV 3 LLC
SIGN
,Adding "Discount store" under logo Channel letters - flush mount *4/29/24 -Work no longer being completed
07/25/2022
09/12/2022
04/29/2024
Locations
Contacts
KANSAS CITY SIGN COMPANY, Address:8248 NW 101ST TERRACE #4, Phone:(816) 216-6109  
BRAIN DEV 3 LLC, Address:300 E 39TH ST  
Brittany Edwards, Address:8248 NW 101st Terrace #4, Phone:(816) 216-6109  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 09/13/2022 09/09/2022
Hector Soto Jr.
Misc
Corrective Action Required
09/09/2022

RACEWAY. The revised sign specification now shows the proposed sign's channel letters mounted on a raceway, whereas the original specification called for individually mounted channel letters. Raceway signs are prohibited under the City's sign ordinance. To comply with the sign ordinance, the channel letters shall be individually mounted.
Sign Permit Review Rejected 08/18/2022 09/07/2022
Hector Soto Jr.
Misc
Corrective Action Required
08/16/2022

RACEWAY. The revised sign specification now shows the proposed sign's channel letters mounted on a raceway, whereas the original specification called for individually mounted channel letters. Raceway signs are prohibited under the City's sign ordinance. To comply with the sign ordinance, the channel letters shall be individually mounted.
Sign Permit Review Rejected 07/27/2022 07/25/2022
Hector Soto Jr.
Misc
Corrective Action Required
07/25/2022

SIGN PERMIT AUTHORIZATION. Submit a copy of the Sign Permit Authorization signed by the property or property owner granting permission to install the proposed sign on the subject tenant space exterior.
Fees
Paid Fees Amount Paid Owing Date Paid
9110062-Sign Permit-Permanent Fee $100.00 $100.00 Paid 09/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sign Confirmation Inspection Not Ready 10/3/2022 10/04/2022
Sign Confirmation Inspection Not Ready 10/25/2022 10/25/2022
Final Electrical Inspection Not Ready 10/26/2022 10/25/2022
Sign Confirmation Inspection Not Ready 11/15/2022 11/15/2022
Final Electrical Inspection Not Ready 11/16/2022 11/16/2022
Sign Confirmation Inspection Not Ready 12/8/2022 12/08/2022
Final Electrical Inspection Not Ready 12/13/2022 12/13/2022
Sign Confirmation Inspection Not Ready 1/3/2023 01/03/2023
Final Electrical Inspection Not Ready 1/5/2023 1/5/2023 01/05/2023
Sign Confirmation Inspection Not Ready 1/25/2023 01/25/2023
Sign Confirmation Inspection Not Ready 2/15/2023 02/15/2023
Final Electrical Inspection Not Ready 2/17/2023 2/17/2023 02/17/2023
Sign Confirmation Inspection Not Ready 3/9/2023 03/09/2023
Final Electrical Inspection Not Ready 3/22/2023 3/22/2023 03/22/2023
Sign Confirmation Inspection Not Ready 3/30/2023 03/30/2023
Final Electrical Inspection Not Ready 4/3/2023 4/3/2023 04/03/2023
Sign Confirmation Inspection Not Ready 4/20/2023 04/20/2023
Final Electrical Inspection Not Ready 5/1/2023 5/1/2023 05/01/2023
Sign Confirmation Inspection Not Ready 5/11/2023 05/11/2023
Final Electrical Inspection Not Ready 5/16/2023 5/16/2023 05/16/2023
Sign Confirmation Inspection Not Ready 6/2/2023 06/02/2023
Final Electrical Inspection Not Ready 6/9/2023 6/9/2023 06/09/2023
Sign Confirmation Inspection Not Ready 6/23/2023 06/23/2023
Sign Confirmation Inspection Not Ready 7/17/2023 07/17/2023
Final Electrical Inspection Not Ready 7/28/2023 7/28/2023 07/28/2023
Sign Confirmation Inspection Not Ready 8/7/2023 08/07/2023
Sign Confirmation Inspection Not Ready 8/28/2023 08/28/2023
Final Electrical Inspection Not Ready 8/31/2023 8/31/2023 08/31/2023
Sign Confirmation Inspection Not Ready 9/19/2023 09/19/2023
Sign Confirmation Inspection Not Ready 10/10/2023 10/10/2023
Sign Confirmation Inspection Not Ready 10/31/2023 10/31/2023
Sign Confirmation Inspection Not Ready 11/21/2023 11/21/2023
Sign Confirmation Inspection Not Ready 12/14/2023 12/14/2023
Sign Confirmation Inspection Not Ready 1/9/2024 01/11/2024
Sign Confirmation Inspection Not Ready 2/8/2024 02/20/2024
Sign Confirmation Inspection Failed 4/12/2024 04/12/2024
Documents & Images
Date Uploaded File Type Document Name
07/25/2022 5134_PenniesforGold_DrawingPermit
07/25/2022 Permit DS P/R Corrections Document
08/16/2022 LeeSummit_SignPermitAuthorization 2022
08/16/2022 5134_PenniesforGold_DrawingPermit
09/07/2022 Permit DS P/R Corrections Document
09/09/2022 5134_PenniesforGold_DrawingPermit1
09/09/2022 Permit DS P/R Corrections Document
09/12/2022 Permit DS Building Permit
09/12/2022 Receipt Receipt for transaction:2022-007458
10/04/2022 Letter INSPECTION SUMMARY
10/25/2022 Letter INSPECTION SUMMARY
11/15/2022 Letter INSPECTION SUMMARY
11/15/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
01/03/2023 Letter INSPECTION SUMMARY
01/05/2023 Letter INSPECTION SUMMARY
01/25/2023 Letter INSPECTION SUMMARY
02/17/2023 Letter INSPECTION SUMMARY
03/22/2023 Letter INSPECTION SUMMARY
03/22/2023 Letter INSPECTION SUMMARY
03/22/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/16/2023 Letter INSPECTION SUMMARY
06/09/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
08/31/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: