Permit Application Status

PRRESRESRES20250815


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRESRESRES20250815
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED PATIO
03/12/2025
04/04/2025
09/17/2025
Locations
Contacts
FIRST CHOICE CUSTOM HOMES LLC, Address:PO BOX 860072, Phone:(913) 449-8935  
John Jamison First Choice Custom Homes, Address:P.O. Box 860072  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
fcchllc@yahoo.com  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 04/04/2025
Right of Way Permit Fee $85.00 $85.00 Paid 04/04/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/04/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 04/04/2025
Water Meter Fee $748.03 $748.03 Paid 04/04/2025
Valuation Fee New Single Family $1,655.32 $1,655.32 Paid 04/04/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/05/2025
07/31/25 Jamie S, Storm drain needs to be cleaned out. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/05/25 Jamie S, Storm drain has been cleaned out.
Footing Inspection - Residential Passed 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
04/08/2025
Ufer located 3’ S of garage wall on the east side
Underslab Plumbing Inspection - Residential Failed 4/30/2025 4/30/2025 04/30/2025
Misc
Corrective Action Required
04/30/2025
-post address -unable to see all piping due to water -remove lumber from underslab
Underslab Plumbing Inspection - Residential Passed 5/1/2025 5/1/2025 05/01/2025
Misc
Resolved
05/01/2025
-post address -unable to see all piping due to water -remove lumber from underslab
All Rough Inspection - Residential Not Ready 6/5/2025 6/5/2025 06/05/2025
Misc
Corrective Action Required
06/05/2025
-no address posted -no other inspections till all-rough inspection
Sewer Service Inspection - R Passed 7/2/2025 7/2/2025 07/02/2025
Water Service Inspection - R Partial 7/2/2025 7/2/2025 07/02/2025
Water Service Inspection - R Passed 7/3/2025 7/3/2025 07/03/2025
Piers/Caissons Inspection - Residential Passed 7/8/2025 7/8/2025 07/08/2025
All Rough Inspection - Residential Failed 7/15/2025 7/15/2025 07/15/2025
Misc
Resolved
07/15/2025
-no address posted -no other inspections till all-rough inspection
Miscellaneous Correction
Corrective Action Required
07/15/2025
-no attic access per plans -add nail plate below existing plate in master bedroom at top plate -wrong size columns in basement per plans -missing column A per plan -columns not bolted to floor -no ladders for egress window well
All Rough Inspection - Residential Passed 7/17/2025 7/17/2025 07/17/2025
Miscellaneous Correction
Resolved
07/17/2025
-no attic access per plans -add nail plate below existing plate in master bedroom at top plate -wrong size columns in basement per plans -missing column A per plan -columns not bolted to floor -no ladders for egress window well
Gas Service Inspection - Residential Passed 7/17/2025 7/17/2025 07/17/2025
Electrical Service Inspection Passed 7/17/2025 7/17/2025 07/17/2025
Erosion Control Inspection Residential Failed 7/31/2025 7/31/2025 07/31/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/31/2025
07/31/25 Jamie S, Storm drain needs to be cleaned out. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 8/5/2025 8/5/2025 08/05/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
08/05/2025
07/31/25 Jamie S, Storm drain needs to be cleaned out. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/05/25 Jamie S, Storm drain has been cleaned out.
Driveway Inspection Partial 8/26/2025 8/26/2025 08/26/2025
Misc
Informational
08/26/2025
08/26/25 Jamie S, DW is formed and compacted. Approved to pour.
Driveway Inspection Passed 9/2/2025 9/2/2025 09/02/2025
Misc
Informational
08/26/2025
08/26/25 Jamie S, DW is formed and compacted. Approved to pour. 09/02/25 Jamie S, DW is compliant with city standards.
Documents & Images
Date Uploaded File Type Document Name
03/12/2025 20250312_101424
03/12/2025 20250312_101510
03/12/2025 20250312_101549
03/12/2025 20250312_101627
03/12/2025 20250312_101704
03/12/2025 20250312_101742
03/12/2025 Permit Codes Residential Plan Review
03/21/2025 Permit Codes Residential Plan Review
03/21/2025 Plot Plan APPROVED PLOT PLAN
03/31/2025 Permit Codes Residential Plan Review
04/01/2025 Approved Plans APPROVED PLANS
04/04/2025 Permit DS Building Permit
04/04/2025 Receipt Receipt for transaction:2025-002053
04/08/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
05/01/2025 Letter INSPECTION SUMMARY
05/15/2025 Approved Plans APPROVED REVISED PLANS
06/05/2025 Letter INSPECTION SUMMARY
06/05/2025 Letter INSPECTION SUMMARY
06/05/2025 Letter INSPECTION SUMMARY
06/05/2025 Letter INSPECTION SUMMARY
06/05/2025 Letter INSPECTION SUMMARY
06/05/2025 Letter INSPECTION SUMMARY
07/02/2025 Letter INSPECTION SUMMARY
07/02/2025 Letter INSPECTION SUMMARY
07/02/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/08/2025 Letter INSPECTION SUMMARY
07/15/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/31/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/26/2025 Letter INSPECTION SUMMARY
09/02/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home