Summary
PRRES20253945
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNFINISHED BASEMENT - STOP WORK ORDER generated on 10/30/2025 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 11/17/2025 12:00 AM by username 'Mitchell Schwarz'.
09/15/2025
09/23/2025
03/17/2026
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,398.00 $2,398.00 Paid 09/23/2025
Right of Way Permit Fee $85.00 $85.00 Paid 09/23/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 09/23/2025
Water Tap Fee $4,080.00 $4,080.00 Paid 09/23/2025
Water Meter Fee $791.53 $791.53 Paid 09/23/2025
Valuation Fee New Single Family $1,758.64 $1,758.64 Paid 09/23/2025
Parks Impact Fee Residential Zone 2 $1,000.00 $1,000.00 Paid 09/23/2025
Outstanding Fees Amount Paid Owing Date Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$150.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Footing Inspection - Residential Pending
Misc
Corrective Action Required
10/28/2025
Inspection denied erosion control not in compliance
Erosion Control Inspection Residential Pending
All Rough Inspection - Residential Pending
Misc
Corrective Action Required
12/24/2025
Inspection denied, no premises identification No re-inspection until full all rough
Misc
Corrective Action Required
12/24/2025
-No Blue Prints on site
Footing Inspection - Residential Failed 10/28/2025 10/28/2025
Misc
Corrective Action Required
10/28/2025
Inspection denied erosion control not in compliance
Erosion Control Inspection Residential Failed 10/28/2025 10/28/2025 10/28/2025
DCM5 ESC INSP DENIED
Corrective Action Required
10/28/2025
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. NO GRAVEL ENTRANCE Ensure protection around lot
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/28/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 10/30/2025 10/30/2025 10/30/2025
DCM5 ESC INSP DENIED
Corrective Action Required
10/28/2025
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. NO GRAVEL ENTRANCE Ensure protection around lot
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/28/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 11/7/2025 11/7/2025 11/07/2025
DCM5 ESC INSP DENIED
Corrective Action Required
10/30/2025
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. NO GRAVEL ENTRANCE Ensure protection around lot
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/30/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Not Ready 11/12/2025 11/12/2025 11/12/2025
DCM5 ESC INSP DENIED
Corrective Action Required
11/07/2025
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. NO GRAVEL ENTRANCE Ensure protection around lot
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/07/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
11/12/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Erosion Control Inspection Residential Partial 11/17/2025 11/17/2025 11/17/2025
DCM5 ESC INSP DENIED
Resolved
11/17/2025
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. NO GRAVEL ENTRANCE Ensure protection around lot
DCM3 ESC REQUIRED 2 DAY
Resolved
11/17/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
11/17/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Underslab Plumbing Inspection - Residential Passed 11/18/2025 11/18/2025 11/18/2025
Sewer Service Inspection - R Passed 11/24/2025 11/24/2025 11/24/2025
Water Service Inspection - R Passed 12/5/2025 12/5/2025 12/05/2025
All Rough Inspection - Residential Failed 12/23/2025 12/23/2025 12/23/2025
Misc
Corrective Action Required
12/23/2025
Inspection denied, no premises identification No re-inspection until full all rough
All Rough Inspection - Residential Not Ready 12/24/2025 12/24/2025 12/24/2025
Misc
Corrective Action Required
12/23/2025
Inspection denied, no premises identification No re-inspection until full all rough
Misc
Corrective Action Required
12/24/2025
-No Blue Prints on site
Documents & Images
Date Uploaded File Type Document Name
09/15/2025 BY #2090 - PERMIT APP
09/18/2025 Permit Codes Residential Plan Review
09/18/2025 Approved Plans APPROVED PLANS
09/18/2025 Approved Plans APPROVED TRUSS LAYOUT
09/18/2025 Approved Plans APPROVED TRUSS PACKET
09/23/2025 Plot Plan APPROVED PLOT PLAN
09/23/2025 Permit Codes Residential Plan Review
09/23/2025 Permit DS Building Permit
09/23/2025 Receipt Receipt for transaction:2025-007302
10/27/2025 3RD Party Insp Report 2090 Bailey Farms - FTNG - Stamped
10/28/2025 Letter INSPECTION SUMMARY
10/28/2025 Letter INSPECTION SUMMARY
10/30/2025 Letter Stop Work Order
11/07/2025 Letter INSPECTION SUMMARY
11/12/2025 Letter INSPECTION SUMMARY
11/17/2025 Letter INSPECTION SUMMARY
11/18/2025 Letter INSPECTION SUMMARY
11/24/2025 Letter INSPECTION SUMMARY
12/05/2025 Letter INSPECTION SUMMARY
12/23/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home